Plan Review Details - Project Z16090010
Plan Review Stops For Project Z16090010
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 10-12-2016 Cont ID  
Sent By rbrown Date 10-12-2016 Time 09:54 Rev Time 0.00
Received By rbrown Date 10-12-2016 Time 09:54 Sent To  
Notes
2016-10-12 09:57:03DEVELOPMENT SERVICES DEPARTMENT, BUILDING DIVISION,
 COMMENTS:
  
 1. THIS REVIEW IS A CURSORY REVIEW AS IT RELATES TO THE
 SITE. IT IS NOT A REVIEW FOR FULL COMPLIANCE WITH
 FLORIDA BUILDING CODE. THE FOLLOWING COMMENTS ARE TO BE
 ADDRESSED FOR PERMITTING.
  
 2. WHEN SUBMITTED FOR BUILDING PERMIT, THE PLANS SHALL
 SHOW THAT THE TYPE OF CONSTRUCTION FOR THE BUILDINGS
 WILL BE IN ACCORDANCE WITH THE HEIGHT, AREA AND
 OCCUPANCY LIMITATIONS IN CHAPTER 5 OF THE FLORIDA
 BUILDING CODE
  
 3. WHEN SUBMITTED FOR BUILDING PERMIT, COMPLIANCE WITH
 ALL BUILDING SEPARATION, PERCENTAGE OF OPENINGS AND
 OPENING PROTECTIVE REQUIREMENTS OF CHAPTERS 6 AND 7 OF
 THE FLORIDA BUILDING CODE SHALL BE VERIFIED.
  
 4. SEPARATE PERMITS REQUIRED. ALL APPLICABLE PERMITS
 AND SUB-PERMITS MUST BE OBTAINED BEFORE COMMENCING THE
 WORK. SEPARATE PERMITS, PLANS AND FEES, ARE REQUIRED
 FOR SIGNS, SWIMMING POOLS AND SPAS, GAS SYSTEMS,
 GENERATORS, FIRE ALARM SYSTEMS, FIRE SPRINKLER AND
 OTHER FIRE SUPPRESSION SYSTEMS, GREASE INTERCEPTORS,
 SITE LIGHTING, SITE LANDSCAPE, SITE IRRIGATION, ETC.
  
 5. THIS PROJECT WILL BE SUBJECT TO ART IN PUBLIC PLACES
 (AIPP) ASSESSMENT. FOR ADVICE ON THE PROVISION OF
 PUBLIC ARTWORK IN LIEU OF THE AIPP ASSESSMENT, CONTACT
 SYBILLE WELTER, ART IN PUBLIC PLACES COORDINATOR, AT
 (561) 822-1521, OR BY EMAIL: [email protected]
  
 ROBERT BROWN
 BUILDING OFFICIAL
 TEL: 561 805 6652
 EMAIL: [email protected]
  

Review Stop ENG - PPRC ENGINEERING - PPRC
Rev No 2 Status P Date 11-22-2016 Cont ID  
Sent By mkhan Date 11-22-2016 Time 14:19 Rev Time 1.00
Received By mkhan Date 11-22-2016 Time 14:18 Sent To  
Notes
2016-11-22 14:49:402ND REVIEW RESPONSE: PASSED WITH CONDITION
 DATE: 11/22/2016:
  
 PROJECT NAME: 45TH STREET HOTEL
  
 AFTER A REVIEW OF THE PPRC RESPONSE MEMO FROM HEATHER
 TRIBOU, PLANNER, AND ATTACHMENT DATED OCTOBER 28, 2016,
 FROM JON E. SCHMIDT AND ASSOCIATES, SOME OF THE
 PREVIOUSLY SUBMITTED COMMENTS APPEAR TO HAVE BEEN
 ACKNOWLEDGED I.E. THEY ARE EXPECTED TO BE ADDRESSED
 DURING ?ENGINEERING DEVELOPMENT APPLICATION? SUBMITTAL.
 HOWEVER, WE HAVE FURTHER COMMENT TO THE RESPONSE
 PROVIDED IN THAT MEMO FOR ITEM NO. 9 (REGARDING
 SANITARY SEWER CONNECTION) WHICH WILL HAVE TO BE
 CONSIDERED PRIOR TO ISSUANCE OF CONSTRUCTION
 AUTHORIZATION INCLUDING BUILDING PERMITS AND
 ENGINEERING DEVELOPMENT APPROVAL:
  
 9. THE CITY IS REVIEWING THE NEED TO UPSIZE THE 6-INCH
 SEWER LATERAL THAT'S CITY-OWNED AND MAINTAINED WITHIN
 THE NORTHPOINT PARKWAY R/W. THE 6-INCH PIPE WILL BE A
 SEWER MAIN AS IT WILL BE RECEIVING FLOWS FROM BOTH
 HARLEY DAVIDSON AND THE PROPOSED 160-ROOM HOTEL.
 IMPROVEMENTS TO THE SEWER LATERAL, IF NEEDED AS
 DETERMINED BY THE CITY, WILL BE ADDRESSED AS PART OF
 THE ENGINEERING DEVELOPMENT SUBMITTAL.
  
 ENGINEERING DEPARTMENT CONTACT:
 MOSTAQUE KHAN, P.E.
 LAND DEVELOPMENT ENGINEER
 [email protected]
 561-494-1024 (OFFICE)
  

Review Stop ENG - PPRC ENGINEERING - PPRC
Rev No 1 Status F Date   Cont ID  
Sent By   Date 10-11-2016 Time   Rev Time  
Received By   Date 10-11-2016 Time   Sent To  
Notes
2016-10-11 12:36:06CITY OF WEST PALM BEACH
 PUBLIC WORKS DEPARTMENT
 ENGINEERING DIVISION
  
 THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES. THE ENGINEERING DEVELOPMENT
 APPROVAL APPLICATION FORMS CAN BE DOWNLOADED AT
 HTTP://WPB.ORG/ENGINEERING/FORMS-AND-PUBLICATIONS/
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION WILL
 BE REQUIRED FROM THE ENGINEERING DIVISION OF THE PUBLIC
 WORKS DEPARTMENT. THE ENGINEERING DEVELOPMENT APPROVAL
 APPLICATION FORMS CAN BE DOWNLOADED AT: HTTP://WPB.ORG/
 DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FORMS,-PERMITS-APP
 LICATIONS
  
 2. PLEASE SUBMIT THE CALCULATIONS FOR WATER AND
 SANITARY SEWER DEMANDS (AVERAGE AND PEAK); AND FIRE
 DEMAND. SUBMIT CALCULATIONS TO VALIDATE METER SIZE
 SELECTION.
  
 3. AFTER NEW WATER AND SEWER SERVICES ARE ACTIVATED,
 EXISTING WATER AND SEWER SERVICE CONNECTIONS SERVING
 THE PROPERTY, IF NOT USED, ARE TO BE CUT AND CAPPED AT
 THE MAIN. PLEASE ADD NOTES ON THE UTILITY PLAN
 ACCORDINGLY.
  
 4. PLEASE INCLUDE APPLICABLE CITY OF WEST PALM BEACH
 STANDARD WATER AND SEWER DETAILS TO THE DETAILS SHEET.
 CONTACT THE ENGINEERING SERVICES DEPARTMENT (561)
 494-1040 FOR THE LATEST REVISED DETAILS.
  
 5. PLEASE PROVIDE THE DETAILS TO SHOW HOW THE PROPOSED
 5-FEET CONCRETE SIDEWALK WILL BE TYING INTO THE
 EXISTING SIDEWALK WITHIN THE RIGHT-OF-WAY TO MEET THE
 CITY?S ENGINEERING DESIGN STANDARDS.
 HTTP://WPB.ORG/ENGINEERING/ENGINEERING-SERVICES/ENGINEE
 RING-STANDARDS/
  
 6. PLEASE INCLUDE THE CITY OF WEST PALM BEACH STANDARD
 DETAIL FOR THE DUMPSTER ENCLOSURE ON THE PLANS. MINIMUM
 DIMENSIONAL (E.G. THE GATE WIDTH MUST BE A MINIMUM OF
 12.5 FEET) REQUIREMENTS FOR THE ENCLOSURE ARE LISTED IN
 CODE OF ORDINANCES, SECTION 94-444(B) OF THE CODE OF
 ORDINANCES. CITY STANDARD DETAIL GC-8 MAY BE DOWNLOADED
 AT HTTP://WPB.ORG/ENGINEERING/ENGINEERING-SERVICES/ENGI
 NEERING-STANDARDS/
  
  
 7. PLEASE PROVIDE AN AUTOTURN ANALYSIS DEMONSTRATING
 THE SOLID WASTE COLLECTION VEHICLE CAN ACCESS THE
 PROPOSED DUMPSTER AND COMPACTOR LOCATIONS. THE TRASH
 DUMPSTER/COMPACTORS MUST LOCATED IN AREAS EASILY
 SERVICED BY THE CITY SANITATION EQUIPMENT AND MANPOWER
 PER SECTION 74-35(A) (5) OF THE CODE OF ORDINANCES. IF
 A ROLL?OFF COMPACTOR IS PROPOSED, PLEASE PROVIDE A
 LETTER FROM THE PRIVATE PROVIDER VERIFYING THAT THEY
 CAN PROVIDE SERVICE WITH THE CONFIGURATION SHOWN ON THE
 PLANS.
  
 8. ?CONCEPTUAL PAVING, DRAINAGE, WATER AND WASTEWATER
 PLAN? SHEET 1 OF 1 SHOWS A PROPOSED 8-INCH WATER LINE
 CONNECTION TO AN EXISTING 8-INCH LINE WHICH IS A
 PRIVATE WATER LINE. PROPOSED WATER CONNECTION SHALL BE
 MADE TO THE EXISTING 12-INCH WATER MAIN ON 45TH STREET.
  
 9. ?CONCEPTUAL PAVING, DRAINAGE, WATER AND WASTEWATER
 PLAN? SHEET 1 OF 1 SHOWS AN EXISTING 6-INCH SANITARY
 SEWER WITHIN THE 12-FEET UTILITY EASEMENT. THIS LINE
 NEED TO BE UPSIZED TO 8-INCH MINIMUM DIAMETER PRIOR TO
 CONNECTING THE PROPOSED SANITARY SEWER TO THIS.
  
 10. PLEASE NOTE THAT: AS OF DECEMBER 20, 2015 THE CITY
 OF WEST PALM BEACH CROSS-CONNECTION CONTROL MANUAL HAS
 BEEN REVISED, MAKING KNOWN THAT "ALL BACKFLOW DEVICES
 MUST BE LEAD FREE." FOR MORE INFORMATION REFER TO THE
 LINK BELOW: HTTP://WPB.ORG/DEPARTMENTS/PUBLIC-UTILITIES
 /FORMS-PUBLICATIONS/BACKFLOW-CROSS-CONNECTION-CONTROL-M
 ANUAL
  
 11. THE PROPOSED FIRE DEPARTMENT CONNECTION SHALL BE
 WITHIN 150 FEET OF A FIRE HYDRANT. LANDSCAPE PLAN SHALL
 SHOW LOCATIONS OF ALL WATER METERS, VALVES, CLEAN-OUTS,
 LIGHT POLES, ETC. ROOT BARRIERS MAY BE REQUIRED WHERE
 PLANTINGS ARE NEAR UNDERGROUND STORMWATER, SANITARY, OR
 POTABLE WATER LINES.
  
  
 MOSTAQUE KHAN, P.E.
 LAND DEVELOPMENT ENGINEER
 [email protected]
 561-494-1024 (OFFICE)
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 11-07-2016 Cont ID  
Sent By pleduc Date 11-07-2016 Time   Rev Time 0.00
Received By pleduc Date 11-07-2016 Time 16:42 Sent To  
Notes
2016-11-07 16:45:272ND REVIEW RESPONSE
  
 AFTER A REVIEW OF THE PPRC RESPONSE MEMO FROM HEATHER
 TRIBOU, PLANNER, AND ATTACHMENT DATED OCTOBER 28, 2016,
 FROM JON E. SCHMIDT AND ASSOCIATES, THE PREVIOUSLY
 SUBMITTED FIRE PREVENTION BUREAU COMMENTS APPEAR TO
 HAVE BEEN ADDRESSED.
  
 HOWEVER, THE BUREAU'S APPROVAL OF THIS SUBMITTED
 PROJECT DOES NOT CONSTITUTE ITS FINAL REVIEW OR
 APPROVAL.
  
 THE BUREAU SHALL REVIEW ALL SUBMITTED BUILDING PLANS AT
 THE APPROPRIATE TIME AND IN ACCORDANCE WITH THE
 REQUIREMENTS OF ALL APPLICABLE CODES AND STANDARDS.
  
  
 PETER LEDUC
 FIRE MARSHAL
 WEST PALM BEACH FIRE RESCUE
 561-804-4709
 [email protected]
 69A-60.0081
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 10-05-2016 Cont ID  
Sent By pleduc Date 10-05-2016 Time   Rev Time 0.00
Received By pleduc Date 10-05-2016 Time 13:42 Sent To  
Notes
2016-10-05 13:54:39THE FOLLOWING COMMENTS WERE SUBMITTED BY PETER LEDUC,
 FIRE MARSHAL, BUREAU OF FIRE PREVENTION, WEST PALM
 BEACH FIRE RESCUE.
  
 THIS REVIEW CAN ONLY BE CONSIDERED PRELIMINARY AS THE
 DRAWINGS THAT WERE REVIEWED WERE NOT COMPLETE.
 ADDITIONAL COMMENTS CAN BE EXPECTED WHEN FULL DRAWINGS
 ARE SUBMITTED FOR PERMIT.
  
 THE FIRE PREVENTION BUREAU HAS NO OBJECTIONS TO THE
 PROPOSED PROJECT.
  
 1. CONSTRUCTION, DEMOLITION, AND RENOVATION TO COMPLY
 WITH NFPA 241. EXTRA ATTENTION SHALL BE GIVEN TO THE
 PERMITTING AND LOCATION OF CONSTRUCTION TRAILERS. A
 PERMIT IS REQUIRED FOR ANY CONSTRUCTION TRAILER RELATED
 TO THIS PROJECT. SEPARATION DISTANCES FROM MAIN
 STRUCTURES AS WELL AS OTHER TRAILERS SHALL BE CLOSELY
 MONITORED FOR THE REQUIREMENTS OF FIRE SPRINKLER
 PROTECTION.
  
 2. SITE ACCESS AND EXIT POINTS ARE TO BE CLEARLY
 IDENTIFIED AND MAINTAINED FOR EMERGENCY VEHICLES DURING
 ALL CONSTRUCTION ACTIVITIES.
  
 3. THE BUILDING ADDRESS SHALL BE CLEARLY VISIBLE FROM
 ALL ACCESS ROADWAYS, INCLUDING DURING CONSTRUCTION.
 ADDRESS NUMBERS SHALL CONTRAST WITH THEIR BACKGROUND
 AND SHALL NOT BE LESS THAN SIX (6) INCHES IN HEIGHT
 WITH A ONE (1) INCH STROKE FOR ALL BUILDINGS.
  
 4. DURING CONSTRUCTION, TRASH AND DEBRIS IS TO BE
 REMOVED FROM THE SITE DAILY OR MORE OFTEN TO REDUCE THE
 ACCUMULATION OF POTENTIAL LIFE AND FIRE SAFETY HAZARDS.
  
 5. THE CONSTRUCTION OF THE BUILDING SHALL COMPLY WITH
 THE 5TH EDITION OF THE FLORIDA FIRE PREVENTION CODE,
 INCLUDING NFPA 1 & 101, SPECIFICALLY CHAPTER 28, NEW
 HOTELS AND DORMITORIES AND ALL ASSOCIATED FIRE CODES.
  
 6. A NFPA 13 COMPLIANT FIRE SPRINKLER SYSTEM AND A NFPA
 14 COMPLIANT STANDPIPE SYSTEM ARE REQUIRED FOR THIS
 STRUCTURE.
  
 SEPARATE SHOP DRAWINGS, ARE REQUIRED TO BE SUBMITTED,
 REVIEWED AND APPROVED BY THE FIRE PREVENTION BUREAU
 PRIOR TO ANY INSTALLATION.
  
 PER FLORIDA ADMINISTRATIVE CODE SECTION 61G15-32.004,
 FIRE PROTECTION ENGINEERING DOCUMENTS SHALL INCLUDE THE
 POINT OF SERVICE FOR THE WATER SUPPLY, A LIST OF
 APPLICABLE NFPA STANDARDS APPLICABLE TO THE PROJECT,
 CLASSIFICATION OF HAZARD OCCUPANCY FOR EACH ROOM OR
 AREA, SUPPRESSION SYSTEM TYPE, DESIGN DENSITIES, WATER
 SUPPLY DATA (FIRE PUMP DATA, HYDRANT FLOW TEST DATA)
 AND ANY PERFORMANCE BASED INFORMATION SUCH AS
 PRE-ENGINEERED SYSTEMS.
  
 FOR THE PROPOSED FIRE PUMP(S) , WHAT IS(ARE) THE
 PRIMARY AND SECONDARY POWER SOURCES?
  
 7. A NFPA 72 COMPLIANT MONITORED FIRE ALARM SYSTEM IS
 REQUIRED FOR THIS STRUCTURE. SEPARATE SHOP DRAWINGS,
 ARE REQUIRED TO BE SUBMITTED, REVIEWED AND APPROVED BY
 THE FIRE PREVENTION BUREAU PRIOR TO ANY INSTALLATION.
  
 8. ALL ELEVATORS SHALL BE EQUIPPED WITH A REGION 7
 KEYWAY SYSTEM.
  
 ALL NEW ELEVATORS SHALL CONFORM TO THE FIRE FIGHTER?S
 EMERGENCY OPERATIONS REQUIREMENTS OF ASME A17.1/CSA
 B44, SAFETY CODE FOR ELEVATORS.
  
 ANY BUILDING THAT IS MORE THAN THREE STORIES HIGH OR IN
 WHICH THE VERTICAL DISTANCE BETWEEN THE BOTTOM TERMINAL
 LANDING AND THE TOP TERMINAL LANDING EXCEEDS 25 FEET
 MUST BE CONSTRUCTED TO CONTAIN AT LEAST ONE PASSENGER
 ELEVATOR THAT IS OPERATIONAL AND WILL ACCOMMODATE AN
 AMBULANCE STRETCHER 76 INCHES LONG AND 24 INCHES WIDE
 IN THE HORIZONTAL POSITION.
  
 9. COMPLETE LIFE SAFETY PLANS FOR EACH OCCUPANCY SHALL
 BE PROVIDED THAT ILLUSTRATE OCCUPANT LOADS, TRAVEL
 DISTANCES, COMMON PATHS OF TRAVEL, DEAD-END CORRIDORS,
 EXIT SIGNS, EMERGENCY LIGHTING, EXITS LEADING TO A
 PUBLIC WAY, FIRE EXTINGUISHER LOCATIONS, AND ALL FIRE
 SAFETY FEATURES AND EQUIPMENT.
  
 10. ALL EXISTING AND NEW FIRE HYDRANTS PLANNED FOR THIS
 DEVELOPMENT SHALL BE CLEARLY INDICATED AND IDENTIFIED
 ON THE PLAN AND CLOSELY COORDINATED WITH THE BUREAU OF
 FIRE PREVENTION.
  
 ALL NEW FIRE HYDRANTS AND FDC?S PLANNED FOR THIS
 DEVELOPMENT SHALL BE CLOSELY COORDINATED WITH THE
 BUREAU OF FIRE PREVENTION. PROPOSED FIRE HYDRANTS AND
 FDC?S SHOULD BE LOCATED ON THE SAME SIDE OF THE STREET
 OR ACCESS ROADWAY TO ALLOW FREE ACCESS FOR OTHER
 ARRIVING EMERGENCY VEHICLES.
  
 11. KNOX-BOX KEY SYSTEM SHALL BE REQUIRED FOR THIS
 BUILDING.
  
 ANY GATES SHALL BE PROVIDED WITH KNOX KEY ACCESS LOCKS,
 PADLOCKS AND/OR SWITCHES FOR 24 HOUR EMERGENCY ACCESS.
  
 12. THE BUREAU'S APPROVAL OF THIS SUBMITTED PROJECT
 DOES NOT CONSTITUTE IT'S FINAL REVIEW OR APPROVAL.
  
 13. THE BUREAU SHALL REVIEW ALL SUBMITTED BUILDING
 PLANS AT THE APPROPRIATE TIME AND IN ACCORDANCE WITH
 THE REQUIREMENTS OF ALL APPLICABLE CODES AND STANDARDS.
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop L LANDSCAPING
Rev No 2 Status P Date 11-10-2016 Cont ID  
Sent By rcaranci Date 11-10-2016 Time 10:41 Rev Time 0.00
Received By rcaranci Date 11-10-2016 Time 10:41 Sent To  
Notes
2016-11-10 10:41:37FROM: RAY CARANCI, LANDSCAPE PLANNER 561-822-1462
 PROJECT: 45TH STREET HOTEL Z16090010
 NOVEMBER 9, 2016
 STAFF HAS REVIEWED THE ZONING AND LAND DEVELOPMENT
 REGULATIONS FOR THE ABOVE REFERENCED PETITION AND
 PROVIDES THE FOLLOWING COMMENTS:
  
  
 1. SATISFIED. PLEASE PROVIDE THE DROUGHT TOLERANCE
 LEVEL FOR EACH PLANT SPECIES ON THE PLANT LIST CHARTS
 TO VERIFY PERCENTAGES CLAIMED WITH THE FLORIDA FRIENDLY
 LANDSCAPE REQUIREMENTS OF SECTION 94-442 (G).
  
 2. SATISFIED. PLEASE CORRECT CALCULATIONS TO SHOW
 COMPLIANCE WITH SECTION 94-443 (C)(3) AND (4) FOR THE
 LANDSCAPE AREAS REQUIREMENTS WITHIN THE PARKING AND
 PAVED AREAS, INCLUDING REQUIRED NUMBER OF SHADE TREES,
 THEN CALCULATE THE MAXIMUM NUMBER OF PALMS SUBSTITUTED
 FOR THE REQUIRED PARKING LOT TREES.
  
 3. SATISFIED. PLEASE CORRECT THE REQUIRED LANDSCAPE
 AREA TO 20% PER SECTION 94-244 TABLE VIII-4.
  
 4. SATISFIED. PLEASE CORRECT THE REQUIRED LINEAR FEET
 OF LANDSCAPED AREA AROUND THE STRUCTURE TO 20% PER
 SECTION 94-443 (E)(2).
  
 5. SATISFIED. PLEASE CORRECT THE CANOPY TREE COUNT FOR
 THE PARKING LOT PROVIDED TREES TO REFLECT THE COUNT OF
 TREES WITHIN THE PARKING FIELD ONLY.
  
 6. SATISFIED. PLEASE CORRECT THE REQUIRED TREES,
 FLOWERING TREE AND SHRUB REQUIRED COUNTS IN THE CHART
 TO REFLECT THE CALCULATION FROM 46,871 SQ. FT. OF
 REQUIRED OPEN SPACE.
  
 7. SATISFIED. PLEASE SHOW LOCATIONS OF MECHANICAL
 EQUIPMENT SUCH AS A/C COMPRESSORS, ETC., AND PROVIDE
 SCREENING FOR ALL GROUND MOUNTED EQUIPMENT AND
 UTILITIES.
  
 8. SATISFIED. PLEASE SHOW LOCATIONS OF WATER AND SEWER
 LINES THAT SERVICE THE BUILDING, AND LOCATIONS OF ABOVE
 GROUND VALVES, AND REVISE TO AVOID CONFLICTS WITH
 LANDSCAPING.
  
 9. SATISFIED. STAFF RECOMMENDS CHANGING THE ILEX
 CASSINE TO A DIFFERENT SPECIES OR ILEX VARIETY TO AVOID
 THE FATAL FUNGAL INFECTION SPHAEROPSIS.
  
 10. SATISFIED. PLEASE ADD 2 ADDITIONAL PALMS NEAR SIGN
 B TO MEET THE SUBSTITUTION REQUIREMENT FOR THE REQUIRED
 SHADE TREES IN THE TERMINAL ISLAND.
  
 11. SATISFIED. PLEASE CHANGE THE ILEX TO THE EAST OF
 THE DUMPSTER ENCLOSURE TO 2 PALMS TO AVOID CONFLICT
 WITH EMPTYING OF THE DUMPSTER.
  
  
 CONDITIONS OF APPROVAL
 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON
 THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE
 SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT
 SERVICES DEPARTMENT, PLANNING DIVISION.
  
 2. PRIOR TO THE ISSUANCE OF A LANDSCAPE PERMIT FOR THE
 PROJECT, THE APPLICANT SHALL REVISE THE LANDSCAPE PLANS
 TO SHOW LOCATIONS OF MECHANICAL EQUIPMENT SUCH AS A/C
 COMPRESSORS, ETC., AND PROVIDE SCREENING FOR ALL GROUND
 MOUNTED EQUIPMENT AND UTILITIES.
  
 3. PRIOR TO SCHEDULING FOR CITY COMMISSION, THE
 APPLICANT SHALL REVISE THE LANDSCAPE PLAN TO SHOW
 LOCATIONS OF LIGHTING PER THE PHOTOMETRIC PLAN AND
 ADJUST TO AVOID CONFLICTS WITH TREES AND LANDSCAPING.
  
 4. PRIOR TO SCHEDULING FOR CITY COMMISSION, THE
 APPLICANT SHALL REVISE THE LANDSCAPE PLAN TO SHOW THE
 LOCATION OF THE SIGN AND LANDSCAPING ALONG 45TH STREET
 SO IT IS NOT IN CONFLICT WITH THE WATER SERVICE AND
 ALSO PROVIDE ANY REQUIRED LANDSCAPE SCREENING.
  

Review Stop L LANDSCAPING
Rev No 1 Status F Date 09-30-2016 Cont ID  
Sent By rcaranci Date 09-30-2016 Time 14:01 Rev Time 0.00
Received By rcaranci Date 09-30-2016 Time 14:01 Sent To  
Notes
2016-09-30 14:08:30FROM: RAY CARANCI, LANDSCAPE PLANNER 561-822-1462
 PROJECT: 45TH STREET HOTEL Z16090010
 SEPTEMBER 30, 2016
 STAFF HAS REVIEWED THE ZONING AND LAND DEVELOPMENT
 REGULATIONS FOR THE ABOVE REFERENCED PETITION AND
 PROVIDES THE FOLLOWING COMMENTS:
  
  
 1. PLEASE PROVIDE THE DROUGHT TOLERANCE LEVEL FOR EACH
 PLANT SPECIES ON THE PLANT LIST CHARTS TO VERIFY
 PERCENTAGES CLAIMED WITH THE FLORIDA FRIENDLY LANDSCAPE
 REQUIREMENTS OF SECTION 94-442 (G).
  
 2. PLEASE CORRECT CALCULATIONS TO SHOW COMPLIANCE WITH
 SECTION 94-443 (C)(3) AND (4) FOR THE LANDSCAPE AREAS
 REQUIREMENTS WITHIN THE PARKING AND PAVED AREAS,
 INCLUDING REQUIRED NUMBER OF SHADE TREES, THEN
 CALCULATE THE MAXIMUM NUMBER OF PALMS SUBSTITUTED FOR
 THE REQUIRED PARKING LOT TREES.
  
 3. PLEASE CORRECT THE REQUIRED LANDSCAPE AREA TO 20%
 PER SECTION 94-244 TABLE VIII-4.
  
 4. PLEASE CORRECT THE REQUIRED LINEAR FEET OF
 LANDSCAPED AREA AROUND THE STRUCTURE TO 20% PER SECTION
 94-443 (E)(2).
  
 5. PLEASE CORRECT THE CANOPY TREE COUNT FOR THE PARKING
 LOT PROVIDED TREES TO REFLECT THE COUNT OF TREES WITHIN
 THE PARKING FIELD ONLY.
  
 6. PLEASE CORRECT THE REQUIRED TREES, FLOWERING TREE
 AND SHRUB REQUIRED COUNTS IN THE CHART TO REFLECT THE
 CALCULATION FROM 46,871 SQ. FT. OF REQUIRED OPEN SPACE.
  
 7. PLEASE SHOW LOCATIONS OF MECHANICAL EQUIPMENT SUCH
 AS A/C COMPRESSORS, ETC., AND PROVIDE SCREENING FOR ALL
 GROUND MOUNTED EQUIPMENT AND UTILITIES.
  
 8. PLEASE SHOW LOCATIONS OF WATER AND SEWER LINES THAT
 SERVICE THE BUILDING, AND LOCATIONS OF ABOVE GROUND
 VALVES, AND REVISE TO AVOID CONFLICTS WITH LANDSCAPING.
  
 9. STAFF RECOMMENDS CHANGING THE ILEX CASSINE TO A
 DIFFERENT SPECIES OR ILEX VARIETY TO AVOID THE FATAL
 FUNGAL INFECTION SPHAEROPSIS.
  
 10. PLEASE ADD 2 ADDITIONAL PALMS NEAR SIGN B TO MEET
 THE SUBSTITUTION REQUIREMENT FOR THE REQUIRED SHADE
 TREES IN THE TERMINAL ISLAND.
  
 11. PLEASE CHANGE THE ILEX TO THE EAST OF THE DUMPSTER
 ENCLOSURE TO 2 PALMS TO AVOID CONFLICT WITH EMPTYING OF
 THE DUMPSTER.
  
 PLEASE UNDERSTAND THAT ADDITIONAL INFORMATION MAY BE
 REQUESTED, AND STAFF MAY HAVE ADDITIONAL COMMENTS AS
 THE REVIEW PROCESS CONTINUES.
  
 CONDITIONS OF APPROVAL
 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON
 THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE
 SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT
 SERVICES DEPARTMENT, PLANNING DIVISION.
  

Review Stop PARK PARKING
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop POLICE POLICE
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop PW PUBLIC WORKS
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop STORM STORMWATER
Rev No 2 Status P Date 11-18-2016 Cont ID  
Sent By tward Date 11-18-2016 Time 11:02 Rev Time 0.00
Received By tward Date   Time   Sent To  
Notes
2016-11-18 11:10:161. ON THE LANDSCAPE PLANS SHOW THE STORM PIPE ENTERING
 THE SITE FROM THE HARLEY DAVIDSON PROPERTY (NW CORNER
 OF HOTEL SITE).
  
 2. INDICATE MINIMUM CLEARANCES FROM OBSTRUCTIONS (E.G.
 TREES) AROUND THE FIRE HYDRANTS AND FIRE DEPARTMENT
 CONNECTION ON THE ENGINEERING PLANS..
  
 3. DRAINAGE EASEMENT TO BE REVISED TO INCLUDE NEW
 LOCATION OF STORM PIPELINE CONVEYING FLOW FROM THE
 HARLEY DAVIDSON SITE.
  
 4. COPY OF APPROVED MODIFIED SFWMD ERP PERMIT TO BE
 PROVIDED PRIOR TO RECEIVING CERTIFICATE OF OCCUPANCY.
  
 TRACY L. WARD, P.E.
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 [email protected]
 561-494-1120

Review Stop STORM STORMWATER
Rev No 1 Status F Date 10-12-2016 Cont ID  
Sent By tward Date 10-12-2016 Time 12:49 Rev Time  
Received By tward Date   Time   Sent To  
Notes
2016-10-12 12:49:08THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES. THE ENGINEERING DEVELOPMENT
 APPROVAL APPLICATION FORMS CAN BE DOWNLOADED AT HTTP://
 WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FORMS,-PER
 MITS-APPLICATIONS
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
 1. PRELIMINARY, UPDATED FEMA FLOOD INSURANCE MAPS ARE
 AVAILABLE AT
 HTTP://MAPS.CO.PALM-BEACH.FL.US/GIS/FLOODZONES.ASPX?.
 PLEASE REVIEW THE MAPS AND VERIFY THAT THE NEW MAPS
 WILL NOT IMPACT THE PROPOSED PROJECT.
  
 2. THE CITY COMMISSION RECENTLY PASSED A RESOLUTION
 INCREASING THE FREEBOARD REQUIREMENT TO ONE FOOT ABOVE
 BASE FLOOD ELEVATION FOR STRUCTURES IN A SPECIAL FLOOD
 HAZARD AREA.
  
 3. SFWMD ERP PERMIT FOR THIS SITE AND HARLEY DAVIDSON
 SITETO BE REVISED/MODIFIED FOR THIS PROJECT. EXISTING
 PERMIT CONTAINS CONDITIONS PERTAINING TO THIS SITE AND
 THE HARLEY DAVIDSON SITE.
  
 4. STORMWATER DISCHARGE INTO THE CANAL MAY REQUIRE
 PERMIT FROM FDOT.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION WILL
 BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT.
 THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS
 CAN BE DOWNLOADED AT: HTTP://WPB.ORG/DEPARTMENTS/ENGINE
 ERING-PUBLIC-WORKS/FORMS,-PERMITS-APPLICATIONS
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120
 [email protected]
  

Review Stop SURVEY SURVEYING
Rev No 2 Status P Date 11-17-2016 Cont ID  
Sent By   Date   Time   Rev Time 0.00
Received By   Date 11-17-2016 Time   Sent To  
Notes
***NONE***

Review Stop SURVEY SURVEYING
Rev No 1 Status F Date 10-11-2016 Cont ID  
Sent By vnoel Date 10-11-2016 Time 08:14 Rev Time  
Received By vnoel Date   Time   Sent To  
Notes
2016-10-11 08:23:191. SITE/CIVIL PERMIT WILL BE REQUIRED THROUGH
 ENGINEERING.
 2. MAY NEED TO CONNECT TO WATER MAIN IN 45TH STREET.
 UTILITY DEPT. TO REVIEW.
  

Review Stop TRAFFIC TRAFFIC ENGINEERING
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 3 Status P Date 11-22-2016 Cont ID  
Sent By   Date   Time   Rev Time 0.00
Received By   Date 11-22-2016 Time   Sent To  
Notes
2016-11-22 10:55:33CASE NUMBER: PB 1719
 PROJECT NAME: 45TH STREET HOTEL
  
 ZONING CONTACT: HEATHER M. TRIBOU
  (561) 822-1562
  [email protected]
  
 - PUBLIC HEARING NOTIFICATION SIGNAGE SHALL BE POSTED
 IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION
 94-39(I)(5) OF THE ZONING AND LAND DEVELOPMENT
 REGULATIONS.
  
 COMMENTS
  
 --EASEMENTS: PROVIDE REVISED RECORDED EASEMENT PRIOR TO
 CO.
  
 --PERMIT PLANS SHALL INCLUDE AND BE CONSISTENT WITH THE
 FOLLOWING:
  
 --THE SITE PLAN (SP-1): PROTECT LIGHT POLES IN PARKING
 AREA WITH CURB WITH GROUND COVER.
  
 --THE SITE PLAN (SP-1): SIGN ?B? DETAIL-THE 30? POLE
 SIGN IS NOT PERMITTED IN THE INDUSTRIAL ZONING
 DISTRICT. STAFF DOES NOT SUPPORT WAIVER.
  
 --THE LANDSCAPE PLAN (LP-2): LOCATE ONE OAK TREE
 OUTSIDE OF UTILITY EASEMENT ON SOUTH SIDE OF PARKING
 LOT.
  
 --THE LIGHTING PLAN: PROVIDE PEDESTRIAN SCALE BOLLARDS
 FOR THE PEDESTRIAN PATH LEADING TO THE PUBLIC
 RIGHT-OF-WAY.
  
 -- THE LIGHTING PLAN: CORRECT BIKE RACK LOCATION.
  
 --ENGINEERING PLANS: INDICATE MINIMUM CLEARANCE FROM
 OBSTRUCTIONS, SPECIFICALLY TREES, AROUND FIRE HYDRANTS
 AND FIRE DEPARTMENTS CONNECTIONS AND REFERENCE THE ROOT
 BARRIERS ON THE LANDSCAPE PLANS.
  
 --ARCHITECTURAL PLANS: BUILDING SIGNAGE- ALL PROPOSED
 BUILDINGS SIGNAGE SHALL MEET SECTION 94-408 (A)(1) OF
 THE ZONING CODE
  
  

Review Stop Z ZONING
Rev No 2 Status F Date 11-10-2016 Cont ID  
Sent By   Date   Time   Rev Time 0.00
Received By   Date   Time   Sent To  
Notes
2016-11-10 13:58:45CASE NUMBER: PB 1719
 PROJECT NAME: 45TH STREET HOTEL
  
 ZONING CONTACT: HEATHER M. TRIBOU
  (561) 822-1562
  [email protected]
  
 GENERAL COMMENTS
  
 - PLEASE PROVIDE RESPONSES TO ALL REVIEW COMMENTS IN
 WRITTEN FORMAT.
  
 - WHEN RESUBMITTING, PLEASE PROVIDE A MINIMUM OF NINE
 (9) AND AN ELECTRONIC COPIES IN PDF FORMAT OF ALL
 PLANS. PLEASE NOTE THAT CHANGES ON THE RESUBMITTED
 PLANS OR THE SUBMITTAL OF INFORMATION/PLANS TO ADDRESS
 THE COMMENTS MAY RESULT IN ADDITIONAL COMMENTS.
  
 - THE PPRC COMMENTS SHALL BE SUFFICIENTLY ADDRESSED AND
 SUBMITTED TO THE PLANNING DIVISION BY 5 PM ON FRIDAY,
 OCTOBER 28, 2016, TO BE SCHEDULED FOR THE DECEMBER 20,
 2016 PLANNING BOARD MEETING.
  
 - PLEASE NOTE THAT IF THE PLANNING DIVISION HAS NOT
 RECEIVED A RESPONSE TO THE PPRC COMMENTS WITHIN 60 DAYS
 FROM THE DATE OF THESE COMMENTS/THE PPRC MEETING (BY
 MONDAY DECEMBER 12, 2016), THE CASE SHALL BE CONSIDERED
 WITHDRAWN. ANY FURTHER ACTION SHALL REQUIRE A NEW
 DEVELOPMENT APPLICATION.
  
 - PLEASE NOTE THAT YOU WERE PERMITTED ONE (1)
 RESUBMITTAL AT NO ADDITIONAL COST. THE RESUBMITTAL FEE
 IS 20% OF THE ORIGINAL APPLICATION FEE. $769.00
  
 - PUBLIC HEARING NOTIFICATION SIGNAGE SHALL BE POSTED
 IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION
 94-39(I)(5) OF THE ZONING AND LAND DEVELOPMENT
 REGULATIONS.
  
 SPECIFIC COMMENTS
  
 --THE LIGHTING PLAN SHALL MEET REQUIREMENT OF
 94-207(D)(8) AS NOT TO EXCEED ONE FOOT CANDLE AT OR
 BEYOND THE BOUNDARIES OF DEVELOPMENT. SUBMITTED PLANS
 EXCEED THIS REQUIREMENT ON BOTH THE NORTH AND WEST SIDE
 OF PROPERTY.
  
 --THE LIGHTING PLAN AND SITE PLAN SHALL BE COORDINATED
 TO MEET BOTH LIGHTING REQUIREMENTS AND MINIMUM PARKING
 STALL DIMENSIONS. THE SIX LIGHT POLES PLACES IN PARKING
 SPOTS REDUCE THE ALREADY MINIMUM SIZED PARKING SPACES.
 PLUS, IT WOULD BE ADVISABLE TO HAVE CURB PROTECTING THE
 POLES.
  
 --THE LIGHTING PLAN LUMENS STATED ON THE LIGHTING PLAN
 USED FOR CALCULATIONS ARE LESS THAN THOSE FOUND IN THE
 MANUFACTURES SPECIFICATIONS FOR R4, R3 AND R5. IF THE
 MANUFACTURE SPECIFICATIONS LUMENS ARE USED THEN FOOT
 CANDLES EXCEEDED WILL INCREASE.
  
 --THE LIGHTING PLAN AND THE ARCHITECTURE PLANS SHALL BE
 COORDINATED SO THAT LIGHTS ARE NOT PLACED WHERE THE
 OVERHANG OF THE PORTE COHERE ARE LOCATED. PEDESTRIAN
 SCALE LIGHTING IS RECOMMENDED.
  
 --THE LIGHTING PLAN PROVIDES NO COVERAGE FOR THE
 PEDESTRIAN PATH LEADING TO THE PUBLIC RIGHT-OF-WAY.
 PEDESTRIAN SCALE BOLLARDS ARE RECOMMENDED.
  
 --THE SITE PLAN (SP-1): PLAN -IT APPEARS AS THE
 DRAINAGE EASEMENT FROM THE SURVEY HAS BEEN MODIFIED FOR
 ENTRY DRIVE. PLEASE CONFIRM.
  
 --THE SITE PLAN (SP-1): PLAN ?CONNECT NORTH DRIVE AISLE
 TO CROSS ACCESS EASEMENT. LAW IS REVIEWING
 REQUIREMENTS.
  
 --THE SITE PLAN (SP-1): SIGN ?B? DETAIL-THE 30? POLE
 SIGN IS NOT PERMITTED IN THE INDUSTRIAL ZONING
 DISTRICT. STAFF DOES NOT SUPPORT WAIVER.
  
 --THE SITE PLAN (SP-1): PLAN PAVING, DRAINAGE AND
 WASTEWATER PLAN ?COORDINATE THE BIKE RACK LOCATION WITH
 THE SITE PLAN.
  
 --THE SITE PLAN (SP-1)- DIMENSION OVERALL SIZE OF
 BICYCLE RACK.
  
 --THE CIVIL PLAN- CORRECT BICYCLE RACK LOCATION
  
 --LANDSCAPE PLAN (LP-2): COORDINATE SIGN A WITH
 LANDSCAPE.
  
 --ARCHITECTURAL PLANS AND/ OR SITE PLAN- BUILDING
 SIGNAGE-DIMENSION ALL SIGNAGE AND SHOW COMPLIANCE WITH
 SECTION 94-408 (A)(1) OF THE ZONING CODE, IF NOT ASK
 FOR WAIVER.
  
  
  
  
  
  
  
  
  
  

Review Stop Z ZONING
Rev No 1 Status F Date 10-11-2016 Cont ID  
Sent By Heather Date 10-11-2016 Time   Rev Time  
Received By   Date 10-11-2016 Time   Sent To Z
Notes
2016-10-11 15:37:12CASE NUMBER: PB 1719
 PROJECT NAME: 45TH STREET HOTEL
  
 ZONING CONTACT: HEATHER M. TRIBOU
  (561) 822-1562
  [email protected]
  
 GENERAL COMMENTS
  
 - PLEASE PROVIDE RESPONSES TO ALL REVIEW COMMENTS IN
 WRITTEN FORMAT.
  
 - WHEN RESUBMITTING, PLEASE PROVIDE A MINIMUM OF ELEVEN
 (11) AND AN ELECTRONIC COPIES IN PDF FORMAT OF ALL
 PLANS. PLEASE NOTE THAT CHANGES ON THE RESUBMITTED
 PLANS OR THE SUBMITTAL OF INFORMATION/PLANS TO ADDRESS
 THE COMMENTS MAY RESULT IN ADDITIONAL COMMENTS.
  
 - THE PPRC COMMENTS SHALL BE SUFFICIENTLY ADDRESSED AND
 SUBMITTED TO THE PLANNING DIVISION BY 5 PM ON FRIDAY,
 OCTOBER 28, 2016, TO BE SCHEDULED FOR THE DECEMBER 20,
 2016 PLANNING BOARD MEETING.
  
 - PLEASE NOTE THAT IF THE PLANNING DIVISION HAS NOT
 RECEIVED A RESPONSE TO THE PPRC COMMENTS WITHIN 60 DAYS
 FROM THE DATE OF THESE COMMENTS/THE PPRC MEETING (BY
 MONDAY DECEMBER 12, 2016), THE CASE SHALL BE CONSIDERED
 WITHDRAWN. ANY FURTHER ACTION SHALL REQUIRE A NEW
 DEVELOPMENT APPLICATION.
  
 - PLEASE NOTE THAT YOU WILL BE PERMITTED ONE (1)
 RESUBMITTAL AT NO ADDITIONAL COST. IF PREVIOUSLY-ISSUED
 COMMENTS CONTINUE TO NOT BE SUFFICIENTLY ADDRESSED, THE
 APPLICANT WILL BE ACCESSED A RESUBMITTAL FEE. SUCH FEE
 WILL BE 20% OF THE ORIGINAL APPLICATION FEE.
  
 - PUBLIC HEARING NOTIFICATION SIGNAGE SHALL BE POSTED
 IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION
 94-39(I)(5) OF THE ZONING AND LAND DEVELOPMENT
 REGULATIONS.
  
 SPECIFIC COMMENTS
  
 --UPDATE ALL SHEETS TO REFLECT ANY CHANGES.
  
 --THE LETTER SUBMITTED BY THE PALM BEACH COUNTY TRAFFIC
 DIVISION DOES NOT MEET COUNTY TRAFFIC PERFORMANCE
 STANDARDS. IN ADDITION THE LETTER INDICATED A 196 ROOM
 HOTEL. PLEASE PROVIDE PALM BEACH COUNTY TRAFFIC
 DIVISION APPROVAL LETTER AND UPDATE SITE PLAN (SP-1)
 SITE DATA IF NEEDED.
  
 --THE INTENT OF A PLANNED DEVELOPMENT DISTRICT (94-207
 (1)) IS TO ENCOURAGE INNOVATIVE LAND PLANNING AND
 DEVELOPMENT TECHNIQUES TO CREATE MORE DESIRABLE AND
 ATTRACTIVE DEVELOPMENT IN THE CITY. PLEASE INDICATE HOW
 THE PROPOSED DEVELOPMENT MEETS THIS INTENT IN THE
 JUSTIFICATION STATEMENT.
  
 --ARCHITECTURAL ELEVATIONS- THE ELEVATIONS ARE LACKING
 PROPORTIONS TO CREATE A CLEAR BASE, MIDDLE AND TOP.
  
 --ARCHITECTURAL ELEVATIONS- PROVIDE CLEAR ENTRY. THE
 WINDOWS LOCATED UNDER THE PORTE COCHERE ARE THE SAME AS
 THE ROOM WINDOWS.
  
 --ARCHITECTURAL ELEVATIONS-RESOLVE RELATIONSHIP OF
 WINDOWS AND PORTE COCHERE AT TRUSS BEAMS.
  
 --ARCHITECTURAL ELEVATIONS- PROVIDE DETAIL ON
 STAIRWELLS AND IF POSSIBLE ROOF DIRECTION TO MATCH
 ENTRY.
  
 --THE JUSTIFICATION LETTER (PAGE 2, SECOND PARAGRAPH)
 INDICATES A BUFFER DETAIL IN THE LANDSCAPE PLAN THAT
 STAFF DID NOT SEE ON THE LANDSCAPE PLANS. THE DETAIL IS
 EXPRESSED TO ADDRESS THE RELATIONSHIP OF THE RETAINING
 WALL THE LANDSCAPING.
  
 --AS REQUIRED IN SEC 94-207(D) (8) A LIGHTING PLAN
 SHALL BE SUBMITTED MEETING THE REQUIREMENTS.
  
 --THE SITE PLAN (SP-1): SITE DATA- PROPOSED USE SHOULD
 BE HOTEL (LIMITED SERVICE)
  
 --THE SITE PLAN (SP-1): SITE DATA- ARCHITECTURAL PLANS
 SHOW 5 STORIES. PLEASE CONFIRM AND CORRECT APPROPRIATE
 PLANS.
  
 --THE SITE PLAN (SP-1): SITE DATA- ADD PROPOSED NUMBER
 OF ROOMS AND NUMBER OF ROOMS BY CODE AND JUSTIFY
 WAIVER.
  
 --THE SITE PLAN (SP-1): BICYCLE RACK AND PARKING-SITE
 DATA, PLAN AND DETAILS TO NOT MATCH, NOTE THAT 9 SPACES
 ARE REQUIRED. PLEASE MEASURE BICYCLE RACK ON SITE PLAN
 TO CONFIRM CORRECT SIZE TO MATCH DETAIL.
  
 -- THE SITE PLAN (SP-1): DEVELOPMENT REGULATIONS:
 PLEASE REFERENCE CODE SECTION 94-7244- TABLE VIII-4 AND
 UPDATE CODE REFERENCES. FOR DISCREPANCIES IN MINIMUM
 ACREAGE OF SECTION 94-207(D) PLEASE MAKE A NOTE WITH A
 REFERENCE TO THE WAIVER.
  
 -- THE SITE PLAN (SP-1): DEVELOPMENT REGULATIONS:
 PROVIDE MAXIMUM IMPERMEABLE SURFACE CALCULATIONS.
  
 --THE SITE PLAN (SP-1): WAIVER CHART: COMMERCIAL
 PLANNED DEVELOPMENT SHOULD BE INDUSTRIAL PLANNED UNIT
 DEVELOPMENT.
  
 --THE SITE PLAN (SP-1): WAIVER CHART: CORRECT PROVIDED
 ACREAGE.
  
 --THE SITE PLAN (SP-1): PLAN -IT APPEARS AS THE
 DRAINAGE EASEMENT FROM THE SURVEY HAS BEEN MODIFIED FOR
 ENTRY DRIVE. PLEASE PROVIDE REQUIRED DOCUMENTATION FOR
 ANY CHANGES.
  
 --THE SITE PLAN (SP-1): PLAN -CONNECT NORTH DRIVE AISLE
 TO CROSS ACCESS EASEMENT.
  
 --THE SITE PLAN (SP-1): PLAN- PROVIDE PEDESTRIAN
 CONNECTION TO DEVELOPED PROPERTY TO THE WEST.
  
 --THE SITE PLAN (SP-1): PLAN -HANDICAP PARKING SPACE
 DETAIL AND SITE PLAN DIMENSIONS DO NOT MATCH.
  
 --THE SITE PLAN (SP-1): PLAN -PROVIDE ONE SET OF
 DIMENSIONS FOR ALL PARKING BAYS AND DIMENSION EACH
 PARKING ISLAND TO MEET CODE.
  
 --THE SITE PLAN (SP-1): PLAN -DIMENSIONS LOCATION OF
 ALL SIGNAGE TO MEET CODE.
  
 --THE SITE PLAN (SP-1): PLAN -THE LOADING SPACE IS
 LOCATED UNDER THE PORTE COCHERE AND PROPOSED HEIGHT IS
 ONLY 10?6? ON THE ARCHITECTURAL ELEVATIONS. PLEASE MOVE
 LOADING SPACE OR RAISE PORTE COCHERE FOR TRUCK
 CLEARANCES.
  
 --THE SITE PLAN (SP-1): SIGN "A" DETAIL-LOW
 FREESTANDING SIGN- DIMENSION WIDTH AND SHOW COMPLIANCE
 WITH SECTION 94-408 9A) (2).
  
 --THE SITE PLAN (SP-1): SIGN "B" DETAIL-THE 30' POLE
 SIGN IS NOT PERMITTED IN THE INDUSTRIAL ZONING
 DISTRICT. STAFF DOES NOT SUPPORT A VARIANCE OR WAIVER.
  
 --THE SITE PLAN (SP-1): PLAN AND PAVING, DRAINAGE AND
 WASTEWATER PLAN -THE NORTH DRIVE AISLE MAY BE REDUCED
 TO 20' SINCE ONLY ONE LINE OF PARKING IS LOCATED ON THE
 DRIVE AISLE.
  
 --THE SITE PLAN (SP-1): PLAN PAVING, DRAINAGE AND
 WASTEWATER PLAN -COORDINATE THE HANDICAP PARKING
 SIGNAGE WITH THE BIKE RACK LOCATION.
  
 --PAVING, DRAINAGE AND WASTEWATER PLAN- IF POSSIBLE
 SHIFT WATER LINE ON WEST OF BUILDING TO NORTH TO AVOID
 LANDSCAPE.
  
 --PAVING, DRAINAGE AND WASTEWATER PLAN- SHOW DETAIL OF
 RETAINING WALL IN RELATION TO DRAINAGE.
  
 --LANDSCAPE PLANS- ADD EXISTING AND PROPOSED UTILITIES
 AND PROPOSED LIGHT POLE LOCATIONS TO ALL PLANS TO
 CORRECT ANY DISCREPANCIES.
  
 --LANDSCAPE PLANS-SHOW SIGHT TRIANGLES.
  
 --ARCHITECTURAL PLANS- DIMENSION ALL SIGNAGE AND SHOW
 COMPLIANCE WITH SECTION 94-408 (A)(1) OF THE ZONING
 CODE.
  
  