Plan Review Details - Project Z16050058
Plan Review Stops For Project Z16050058
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 06-09-2016 Cont ID  
Sent By rbrown Date 06-09-2016 Time 20:44 Rev Time 0.00
Received By rbrown Date 06-09-2016 Time 20:43 Sent To  
Notes
2016-06-09 20:47:30DEVELOPMENT SERVICES DEPARTMENT, BUILDING DIVISION,
 COMMENTS:
  
 1. THIS REVIEW IS A CURSORY REVIEW AS IT RELATES TO THE
 SITE. IT IS NOT A REVIEW FOR FULL COMPLIANCE WITH
 FLORIDA BUILDING CODE. THE FOLLOWING COMMENTS ARE TO BE
 ADDRESSED FOR PERMITTING.
  
 2. WHEN SUBMITTED FOR BUILDING PERMIT, THE PLANS SHALL
 SHOW THAT THE TYPE OF CONSTRUCTION FOR THE BUILDINGS
 WILL BE IN ACCORDANCE WITH THE HEIGHT, AREA AND
 OCCUPANCY LIMITATIONS IN CHAPTER 5 OF THE FLORIDA
 BUILDING CODE
  
 3. WHEN SUBMITTED FOR BUILDING PERMIT, COMPLIANCE WITH
 ALL BUILDING SEPARATION, PERCENTAGE OF OPENINGS AND
 OPENING PROTECTIVE REQUIREMENTS OF CHAPTERS 6 AND 7 OF
 THE FLORIDA BUILDING CODE SHALL BE VERIFIED.
  
 4. SEPARATE PERMITS REQUIRED. ALL APPLICABLE PERMITS
 AND SUB-PERMITS MUST BE OBTAINED BEFORE COMMENCING THE
 WORK. SEPARATE PERMITS, PLANS AND FEES, ARE REQUIRED
 FOR SIGNS, SWIMMING POOLS AND SPAS, GAS SYSTEMS,
 GENERATORS, FIRE ALARM SYSTEMS, FIRE SPRINKLER AND
 OTHER FIRE SUPPRESSION SYSTEMS, GREASE INTERCEPTORS,
 SITE LIGHTING, SITE LANDSCAPE, SITE IRRIGATION, ETC.
  
 ROBERT BROWN
 BUILDING OFFICIAL
 TEL: 561 805 6652
 EMAIL: [email protected]
  

Review Stop ENG - PPRC ENGINEERING - PPRC
Rev No 1 Status F Date 06-08-2016 Cont ID  
Sent By cranford Date 06-08-2016 Time 08:24 Rev Time 0.00
Received By cranford Date 06-08-2016 Time 08:22 Sent To  
Notes
2016-06-09 09:00:52CITY OF WEST PALM BEACH
 ENGINEERING DEPARTMENT
 PUBLIC UTILITY COMMENTS
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 GENERAL:
  
 1. PLEASE SUBMIT SIGNED & SEALED ENGINEER/MEP WATER AND
 SEWER DEMAND CALCULATIONS (AVERAGE AND PEAK) FOR METER
 SIZING SELECTION AND SERVICE SIZING. PLEASE ALSO
 PROVIDE CALCULATION FOR IRRIGATION DEMAND;
  
 2. PLEASE INCLUDE APPLICABLE CITY OF WEST PALM BEACH
 STANDARD WATER AND SEWER DETAILS TO THE DETAILS SHEET.
 CONTACT THE ENGINEERING SERVICES DEPARTMENT (561)
 494-1040 FOR THE LATEST REVISED DETAILS.
  
 3. PLEASE PROVIDE THE FIRE HYDRANT FLOW TEST DATA FROM
 EXISTING FIRE HYDRANT USED FOR DESIGN;
  
 4. PLEASE PROVIDE UTILITY CROSSING INFORMATION;
  
 5. PLEASE ADD AND LABEL EXISTING UTILITY PIPE SIZE AND
 MATERIAL, INCLUDING THOSE ON HAVERHILL ROAD;
  
 6. PLEASE SHOW EXISTING VALVES FOR WATER DISTRIBUTION
 SYSTEM FOR CONSTRUCTION COORDINATION PURPOSES (SYSTEM
 SHUTDOWNS, ETC.);
  
 WATER:
  
 7. CITY'S SYSTEM INFORMATION INDICATES THAT THERE IS A
 12-INCH STUB ON THE EAST SIDE OF HAVERHILL ROAD (APPROX
 150 FEET SOUTH OF TYLER LAKES BOULEVARD AND APPROX. 300
 FEET NORTH OF THE PARK ENTRANCE). PLEASE ADD A FIRE
 HYDRANT TO SERVE CITY PARK USING THE EXISTING 12-INCH
 STUB. THE CITY WILL FIELD LOCATE THE EXISTING STUB;
  
 SEWER:
  
 8. PLEASE PROVIDE CALCULATIONS FOR THE PROPOSED FORCE
 MAIN AND LIFT STATION;
  
 9. PLEASE PROVIDE DETAILED LIFT STATION PLAN AND
 LAYOUT;
  
 10. PLEASE PROVIDE DETAILS FOR THE PROPOSED FORCE MAIN
 CONNECTION TO LS34 SANITARY SEWER SYSTEM. CONNECTION
 SHALL BE MADE TO THE EXISTING SANITARY SEWER MANHOLE
 UPSTREAM OF WETWELL.
  
 11. PLEASE PROVIDE THE PROPOSED FORCE MAIN PROFILE
 CROSSING HAVERHILL ROAD INCLUDING EXISTING UTILITIES;
  
 12. PLEASE ADD IRM PIPE SYMBOL AND DESCRIPTION TO THE
 LEGEND. PLEASE CALL OUT PIPE SIZE, MATERIAL, AND
 OWNERSHIP.
  
 STORMWATER:
  
 13. PLEASE VERIFY THAT THE MASTER DRAINAGE SYSTEM HAS
 BEEN CERTIFIED BY THE ENGINEER OF RECORD AND THAT THE
 ERP HAS BEEN CONVERTED INTO THE OPERATIONAL PHASE BY
 SFWMD.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 561-494-1120
 [email protected]
  
 LAURA LE, PE
 PUBLIC UTILITIES ENGINEER
 561-494-1093
 [email protected]
  
  
2016-06-08 08:24:22CITY OF WEST PALM BEACH
 ENGINEERING DEPARTMENT
  
 THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES. THE ENGINEERING DEVELOPMENT
 APPROVAL APPLICATION FORMS CAN BE DOWNLOADED AT
 HTTP://WPB.ORG/ENGINEERING/FORMS-AND-PUBLICATIONS/
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL.
  
 1. PLEASE VERIFY THAT THE EXISTING ENVIRONMENTAL
 RESOURCE PERMIT INCLUDES THE IMPROVEMENT SHOWN ON THE
 PROPOSED SITE PLAN MODIFICATIONS.
  
 2. PLEASE SUBMIT DOCUMENTATION DEMONSTRATING THE
 AUTHORITY TO DISCHARGE THE UNTREATED RUNOFF FROM THE
 CITY PARK INTO THE COUNTY?S LAKE.
  
 3. THE MOPS LIFT STATION DESIGN IS CURRENTLY UNDER
 REVIEW. PLEASE COORDINATE WITH THE CITY PUBLIC
 UTILITIES ENGINEER (LAURA LE) PRIOR TO FINALIZING THE
 LIFT STATION DESIGN.
  
 4. PLEASE SUBMIT CALCULATIONS SHOWING THE WATER SERVICE
 PRESSURE AT THE PROPOSED RESTROOMS.
  
 5. PLEASE INCLUDE A NORTH ARROW ON THE LIGHTING PLANS.
  
 6. ON SHEET C4.5, THERE IS A LINE SHOWN LABELED AS IRM.
 PLEASE INCLUDE THIS LINE TYPE IN THE LEGEND.
  
 7. THE OFF-SITE FORCEMAIN, WHICH CUTS THROUGH THE
 COUNTY PROPERTY, MUST BE LOCATED WITHIN A UTILITY
 EASEMENT.
  
 8. HOW WILL TRASH BE COLLECTED AT THE PARK?
  
 9. PLEASE CONSIDER DESIGNING THE STORMWATER SYSTEM TO
 DRAIN FROM WEST TO EAST RATHER THAN FROM SOUTH TO EAST.
  
 10. PLEASE CHECK THE COVER ON THE PIPE INTO YD1.
  
 11. PLEASE VERIFY THAT YD2 AND YD3 ARE NEEDED.
  
 12. ALL STORMWATER PIPE JOINTS ARE TO BE WRAPPED.
  
 13. FINAL DESIGN OF HDPE STORMWATER PIPE MUST INCLUDE
 FLOATATION PREVENTION OR SIGNED AND SEALED CALCULATIONS
 DEMONSTRATING THAT FLOATATION IS NOT A CONCERN FOR THIS
 SITE.
  
 14. PER SECTION 1.9.1 OF THE CITY?S STANDARDS FOR
 CONSTRUCTION, THE MINIMUM SIZE DRAINAGE PIPE IS 15 INCH
 DIAMETER. PLEASE INCREASE THE SIZE OF THE PROPOSED
 PIPES.
  
 15. IS THE SOCCER FIELD / TEMPORARY PARKING AREA
 PROPOSED TO BE IRRIGATED? THE PLANS SHOW AN IRRIGATION
 SERVICE BUT DOES NOT INDICATE WHICH AREAS ARE PROPOSED
 TO BE IRRIGATED. PLEASE CHECK WITH GREG MIHALKO
 (561-822-2188 OR [email protected]) TO ENSURE THAT THE
 DESIGN COMPLIES WITH CITY IRRIGATION STANDARDS.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. AN ENGINEERING DEVELOPMENT APPROVAL MODIFICATION
 WILL BE REQUIRED FROM THE ENGINEERING DIVISION OF THE
 PUBLIC WORKS DEPARTMENT.
  
 2. PLEASE COORDINATE WITH THE CITY PUBLIC UTILITIES
 ENGINEER (LAURA LE) PRIOR TO FINALIZING THE PROPOSED
 UTILITY TIE IN LOCATIONS AND CONFIGURATION.
  
 3. THE INCREASE IN SOLID WASTE YARDAGE WILL NEED TO BE
 VERIFIED AS PART OF THE FINAL DESIGN TO VERIFY THAT THE
 DESIGN INCLUDES APPROPRIATE NUMBER AND SIZE OF TRASH
 BINS.
  
 KELLY CRANFORD, P.E.
 CAPITAL IMPROVEMENT PLAN MANAGER
 [email protected]
 561-494-1098
  
 BRIAN COLLINS, P.E.
 INTERIM DIRECTOR OF ENGINEERING/CITY TRAFFIC ENGINEER
 [email protected]
 561-494-1040
  
 VINCE NOEL, PSM
 CITY SURVEYOR / REAL ESTATE SUPERVISOR
 [email protected]
 561-494-1096
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 561-494-1120
 [email protected]
  
 LAURA LE, PE
 PUBLIC UTILITIES ENGINEER
 561-494-1093
 [email protected]
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status F Date 06-08-2016 Cont ID  
Sent By pleduc Date 06-08-2016 Time   Rev Time 0.00
Received By pleduc Date 06-03-2016 Time 17:19 Sent To  
Notes
2016-06-03 17:29:56THE FOLLOWING COMMENTS WERE SUBMITTED BY PETER LEDUC,
 FIRE MARSHAL, BUREAU OF FIRE PREVENTION, WEST PALM
 BEACH FIRE RESCUE.
  
 THIS REVIEW CAN ONLY BE CONSIDERED PRELIMINARY AS THE
 DRAWINGS THAT WERE REVIEWED WERE NOT COMPLETE.
 ADDITIONAL COMMENTS CAN BE EXPECTED WHEN FULL DRAWINGS
 ARE SUBMITTED FOR PERMIT.
  
 THE FIRE PREVENTION BUREAU HAS NO OBJECTIONS TO THE
 PROPOSED PROJECT.
  
 1. CONSTRUCTION, DEMOLITION, AND RENOVATION TO COMPLY
 WITH NFPA 241. EXTRA ATTENTION SHALL BE GIVEN TO THE
 PERMITTING AND LOCATION OF CONSTRUCTION TRAILERS. A
 PERMIT IS REQUIRED FOR ANY CONSTRUCTION TRAILER RELATED
 TO THIS PROJECT. SEPARATION DISTANCES FROM MAIN
 STRUCTURES AS WELL AS OTHER TRAILERS SHALL BE CLOSELY
 MONITORED FOR THE REQUIREMENTS OF FIRE SPRINKLER
 PROTECTION.
  
 2. SITE ACCESS AND EXIT POINTS ARE TO BE CLEARLY
 IDENTIFIED AND MAINTAINED FOR EMERGENCY VEHICLES DURING
 ALL CONSTRUCTION ACTIVITIES.
  
 3. THE BUILDING ADDRESS SHALL BE CLEARLY VISIBLE FROM
 ALL ACCESS ROADWAYS, INCLUDING DURING CONSTRUCTION.
 ADDRESS NUMBERS SHALL CONTRAST WITH THEIR BACKGROUND
 AND SHALL NOT BE LESS THAN SIX (6) INCHES IN HEIGHT
 WITH A ONE (1) INCH STROKE FOR ALL BUILDINGS.
  
 4. DURING CONSTRUCTION, TRASH AND DEBRIS IS TO BE
 REMOVED FROM THE SITE DAILY OR MORE OFTEN TO REDUCE THE
 ACCUMULATION OF POTENTIAL LIFE AND FIRE SAFETY HAZARDS.
  
 5. THE CONSTRUCTION OF THE BUILDING SHALL COMPLY WITH
 THE 5TH EDITION OF THE FLORIDA FIRE PREVENTION CODE,
 INCLUDING NFPA 1 & 101, AND ALL ASSOCIATED FIRE CODES.
  
 THE PROPOSED CANOPY AND STRUCTURE SHALL BE OFF FIRE
 RETARDENT MATERIAL AND UNDER A SEPARATE PERMIT.
  
 6. THE ACCESS POINT CURVES FROM THE PARKING LOT TO THE
 COMPACTED GRASS FIRE LANE ACCESS ROAD APPEAR TO BE TOO
 SHARP AND NOT EASILY NAVIGATED BY FIRE APPARATUS.
 PLEASE WORK TO PROVIDE SOFTER CURVES AND/OR STRAIGHTER
 LINES AND PROVIDE A FIRE ENGINE AUTOTURN TO VERIFY AND
 CONFIRM NAVIGATION.
  
 7. ANY GATES ARE RECOMMENDED TO BE PROVIDE WITH KNOW
 PADLOCKS OR KNOX KEY SWITCHES FOR EMERGENCY VEHICLES
 ACCESS DURING EMERGENCIES.
  
 8. A FIRE HYDRANT WAS NOT NOTED IN OR AROUND THE
 PARKING LOT AREA. IT IS RECOMMENDED THAT A FIRE HYDRANT
 BE INSTALLED IN THE NORTH AREA OF THE PARKING.
  
 9. THE BUREAU'S APPROVAL OF THIS SUBMITTED PROJECT DOES
 NOT CONSTITUTE IT'S FINAL REVIEW OR APPROVAL.
  
 10. THE BUREAU SHALL REVIEW ALL SUBMITTED BUILDING
 PLANS AT THE APPROPRIATE TIME AND IN ACCORDANCE WITH
 THE REQUIREMENTS OF ALL APPLICABLE CODES AND STANDARDS.
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop L LANDSCAPING
Rev No 1 Status F Date 06-06-2016 Cont ID  
Sent By rcaranci Date 06-06-2016 Time 15:10 Rev Time 0.00
Received By rcaranci Date 06-06-2016 Time 15:10 Sent To  
Notes
2016-06-06 15:11:34FROM: RAY CARANCI, LANDSCAPE PLANNER
 PROJECT: CITY PARK AT THE BALLPARK OF THE PALM BEACHES
 JUNE 3, 2016
 I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND
 PROVIDE THE FOLLOWING COMMENTS:
  
 1. PLEASE SHOW THE LINES CONNECTING THE SPLASH PAD AREA
 TO THE PUMPS ON THE LANDSCAPE PLAN TO AVOID CONFLICTS
 WITH TREES.
  
 2. PLEASE INDICATE THE LOCATIONS OF THE RELOCATED
 SABAL PALMS ON THE LANDSCAPE PLAN.
  
 3. THE FPL LINES ALONG THE EAST SIDE OF HAVERHILL ROAD
 LIMIT THE CHOICES FOR BUFFER TREES AND PLACEMENT.
 PLEASE ADJUST THE SPECIES AND LOCATIONS TO ALLOW FOR A
 SUSTAINABLE BUFFER. ADJUST THE WALKING PATH LOCATION
 ALONG THE BASKETBALL COURTS TO ALLOW TREE PLACEMENT
 BETWEEN THE PATH AND THE SIDEWALK, TO BE MORE
 CONSISTENT IN DENSITY WITH THE REST OF THE BUFFER NORTH
 AND SOUTH OF THE COURTS.
  
 4. PLEASE SHOW THE MATERIAL FOR THE PATHS CLEARLY ON
 THE LANDSCAPE PLAN, AS THIS WILL BE AFFECTED BY THE
 PROXIMITY OF LARGER TREE SPECIES.
  
 5. PLEASE RELOCATE LIGHT POLES IN THE PARKING LOT TO
 AREAS IN THE LANDSCAPE STRIPS AWAY FROM THE TREES IN
 THE LANDSCAPE ISLANDS, AND SHOW THE LOCATIONS ON THE
 LANDSCAPE PLANS.
 6. PLEASE SHOW THE LOCATIONS OF THE LIGHT POLES FOR THE
 SPORTS FIELDS ON THE LANDSCAPE PLAN.

Review Stop PARK PARKING
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop POLICE POLICE
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop PU PUBLIC UTILITIES
Rev No 1 Status F Date 06-08-2016 Cont ID  
Sent By cranford Date 06-08-2016 Time 08:25 Rev Time 0.00
Received By cranford Date 06-08-2016 Time 08:25 Sent To  
Notes
2016-06-08 08:26:12SEE COMMENTS UNDER PPRC ENG
2016-06-08 06:38:37PLEASE SEE ENG PPRC COMMENTS FOR PRELIMINARY REVIEW OF
 WATER AND SEWER PLANS

Review Stop PW PUBLIC WORKS
Rev No 1 Status F Date 06-08-2016 Cont ID  
Sent By cranford Date 06-08-2016 Time 08:25 Rev Time 0.00
Received By cranford Date 06-08-2016 Time 08:25 Sent To  
Notes
2016-06-08 08:25:38SEE COMMENTS UNDER PPRC ENG.

Review Stop STORM STORMWATER
Rev No 1 Status F Date 06-08-2016 Cont ID  
Sent By cranford Date 06-08-2016 Time 08:25 Rev Time 0.00
Received By cranford Date 06-08-2016 Time 08:24 Sent To  
Notes
2016-06-08 08:25:14SEE COMMENTS UNDER PPRC ENG.

Review Stop SURVEY SURVEYING
Rev No 1 Status P Date 06-08-2016 Cont ID  
Sent By cranford Date 06-08-2016 Time 08:24 Rev Time 0.00
Received By cranford Date 06-08-2016 Time 08:24 Sent To  
Notes
***NONE***

Review Stop TRAFFIC TRAFFIC ENGINEERING
Rev No 1 Status P Date 06-08-2016 Cont ID  
Sent By cranford Date 06-08-2016 Time 08:24 Rev Time 0.00
Received By cranford Date 06-08-2016 Time 08:24 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 06-06-2016 Cont ID  
Sent By rcaranci Date 06-06-2016 Time 15:12 Rev Time 0.00
Received By rcaranci Date 06-06-2016 Time 15:12 Sent To  
Notes
2016-06-06 15:13:55ZONING COMMENTS:
 1. PLEASE PROVIDE DIVIDING BARRIER BETWEEN THE OVERFLOW
 ACCESS ROAD TO THE COUNTY SPORTS FIELDS AND THE CITY
 FIELDS TO KEEP TRAFFIC FROM DRIVING ON THE FIELDS.
 2. PLEASE PROVIDE DETAILS ON HOW THE TWO DIFFERENT
 TYPES OF GRASS WILL BE SEPARATED AND MAINTAINED FOR THE
 SPORTS FIELDS.
 3. THE PUMP ROOM WITHIN THE BUILDING NEEDS TO
 ACCOMMODATE ALL THE EQUIPMENT FOR THE SPLASH PAD.
 PLEASE PROVIDE DETAILS ON EQUIPMENT TO ASSURE THERE IS
 ADEQUATE ROOM ON THE FLOOR PLAN.
 4. PLEASE SHOW THE LOCATIONS OF THE LIGHT POLES FOR THE
 SPORTS FIELDS.
 5. PLEASE PROVIDE MORE DETAIL ON THE SPACING FOR THE
 BIKE RACKS.
  
 6. PLEASE PROVIDE DETAILS FOR THE LIGHT POLES AND
 FIXTURES.
  
 7. PLEASE PROVIDE MORE DETAIL FOR THE LOCATION, HEIGHT,
 AND MATERIAL OF THE FENCING ALONG THE BASKETBALL
 COURTS.
 ITEMS AS LISTED IN THE INTERLOCAL AGREEMENT:
 8. #3 THE PAVILION IS REQUIRED TO MEET THE 40X40 SIZE.
 THERE ARE CONCERNS THAT THE OVERHANGS ARE TOO WIDE, AND
 MAY ENCOURAGE LOITERING.
 9. #4 PLEASE PROVIDE ADDITIONAL DETAILS FOR THE GATEWAY
 PLAZA, AND WHAT SPECIAL FEATURES DISTINGUISH IT FROM
 THE REST OF THE SIDEWALK AREAS.
 10. #6 PLEASE VERIFY THE SPLASH PAD MEETS THE 30 FOOT
 MINIMUM DIAMETER WITH THE EQUIPMENT DETAILS.
 11. #7B PLEASE PROVIDE DETAILS FOR THE PLAYGROUND
 EQUIPMENT.
 12. #7C PLEASE PROVIDE DETAILS ON THE SHADE STRUCTURE
 FOR THE PLAYGROUND.
 13. #8 PLEASE CLARIFY WHY THE SPLIT RAIL FENCE ALONG
 THE LAKE IS LIMITED TO 660 FEET, AND DOES NOT CONTINUE
 ALONG THE ENTIRE LENGTH OF THE PARK ALONG THE LAKE.
 14. #12 PLEASE PROVIDE DETAILS ON THE SOCCER GATEWAY
 PLAZA, AND WHAT SPECIAL FEATURES DISTINGUISH IT FROM
 THE REST OF THE SIDEWALK AREAS.
 15. #19 THE SITE PLAN AND LANDSCAPE PLAN SHOW 2
 DRINKING FOUNTAINS, AND A DRINKING FOUNTAIN IS INCLUDED
 ON THE PAVILION FLOOR PLAN. PLEAS CLARIFY THE NUMBER
 BEING PROVIDED.
  