Plan Review Details - Project Z16010026
Plan Review Stops For Project Z16010026
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 02-10-2016 Cont ID  
Sent By rbrown Date 02-10-2016 Time 09:44 Rev Time 0.00
Received By rbrown Date 02-10-2016 Time 09:44 Sent To  
Notes
***NONE***

Review Stop ENG - PPRC ENGINEERING - PPRC
Rev No 1 Status P Date 02-08-2016 Cont ID  
Sent By cranford Date 02-08-2016 Time 10:24 Rev Time 0.00
Received By cranford Date 02-08-2016 Time 10:24 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 02-04-2016 Cont ID  
Sent By pleduc Date 02-04-2016 Time   Rev Time 0.00
Received By pleduc Date 02-04-2016 Time 09:32 Sent To  
Notes
2016-02-04 09:41:22THE FOLLOWING COMMENTS WERE SUBMITTED BY PETER LEDUC,
 FIRE MARSHAL, BUREAU OF FIRE PREVENTION, WEST PALM
 BEACH FIRE RESCUE.
  
 THIS REVIEW CAN ONLY BE CONSIDERED PRELIMINARY AS THE
 DRAWINGS THAT WERE REVIEWED WERE NOT COMPLETE.
 ADDITIONAL COMMENTS CAN BE EXPECTED WHEN FULL DRAWINGS
 ARE SUBMITTED FOR PERMIT.
  
 1. THE FIRE PREVENTION BUREAU HAS NO OBJECTIONS TO THE
 PROPOSED PROJECT.
  
 2. THE FIRE PREVENTION BUREAU REMAINS OPEN-MINDED TO
 ALTERNATE DESIGNS AND FIRE DEPARTMENT ACCESS IN LEIU OF
 ROUND-ABOUTS AT WATER FRONT PROPERTY. STRATEGIC
 LOCATIONS OF FIRE HYDRANTS, FDC'S, COMMAND ROOMS,
 FIREFIGHTER BUILDING ACCESS POINTS, AND/OR "T" TYPE
 TURN AROUND OPPORTUNITES CAN BE REVIEWED FOR
 EFFECTIVENESS WITH FIRE GROUND OPERATIONS. CLOSE
 COMMUNICATION WITH THE BUREAU IS STRONGLY ENCOURAGED.
  

Review Stop L LANDSCAPING
Rev No 1 Status P Date 02-05-2016 Cont ID  
Sent By rcaranci Date 02-05-2016 Time 14:27 Rev Time 0.00
Received By rcaranci Date 02-05-2016 Time 14:25 Sent To  
Notes
2016-02-05 14:27:38NO COMMENTS

Review Stop PARK PARKING
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop PW PUBLIC WORKS
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop STORM STORMWATER
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop SURVEY SURVEYING
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop TRAFFIC TRAFFIC ENGINEERING
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 04-13-2016 Cont ID  
Sent By eschneid Date 04-13-2016 Time 12:23 Rev Time 1.00
Received By eschneid Date 04-13-2016 Time 12:23 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 02-09-2016 Cont ID  
Sent By eschneid Date 02-09-2016 Time 15:49 Rev Time 0.75
Received By eschneid Date 02-09-2016 Time 15:49 Sent To  
Notes
2016-02-09 16:02:00CASE NO. FSPR 15-04A
 PALM HARBOR MARINA DOCKS
 400 NORTH FLAGLER
  
 - CONTACT ERIC SCHNEIDER @ (561) 822-1446
  
 - PLEASE PROVIDE RESPONSES TO REVIEW COMMENTS IN
 WRITTEN FORMAT.
  
 - WHEN RESUBMITTING, PLEASE PROVIDE A MINIMUM OF FIVE
 (5) PAPER COPIES AND AN ELECTRONIC COPY IN .PDF FORMAT
 OF ALL PLANS. PLEASE NOTE THAT CHANGES ON THE
 RESUBMITTED PLANS OR THE SUBMITTAL OF INFORMATION/PLANS
 TO ADDRESS THE COMMENTS MAY RESULT IN ADDITIONAL
 COMMENTS.
  
 - PLEASE NOTE THAT IF THE PLANNING DIVISION HAS NOT
 RECEIVED A RESPONSE TO THE PPRC COMMENTS WITHIN 60 DAYS
 FROM THE DATE OF THE PPRC MEETING (BY APRIL 10, 2016),
 THE CASE SHALL BE CONSIDERED WITHDRAWN. ANY FURTHER
 ACTION SHALL REQUIRE A NEW DEVELOPMENT APPLICATION.
  
 - PLEASE NOTE THAT YOU WILL BE PERMITTED ONE (1)
 RESUBMITTAL AT NO ADDITIONAL COST. IF PREVIOUSLY-ISSUED
 COMMENTS CONTINUE TO NOT BE SUFFICIENTLY ADDRESSED, THE
 APPLICANT WILL BE ACCESSED A RESUBMITTAL FEE. SUCH FEE
 WILL BE 20% OF THE ORIGINAL APPLICATION FEE ($300).
  
 1) PLEASE SUBMIT INFORMATION TO VERIFY THAT THE PALM
 HARBOR MARINA MAY USE 166 PARKING SPACES WITHIN THE
 PARKING GARAGE AND ADJOINING SURFACE LOT.
  
 2) IN ACCORDANCE WITH SECTION 94-273(D)(44.1)A.2,
 PLEASE PROVIDE AN ENVIRONMENTAL ASSESSMENT THAT
 INCLUDES ALL AQUATIC RESOURCES THAT WILL BE AFFECTED BY
 THE EXPANDED MARINA.
  
 3) PLEASE PROVIDE VERIFICATION HOW THE ADDITIONAL
 STANDARDS LISTED IN SECTION 94-273(D)(44.1)B OF THE
 CITY'S ZONING AND LAND DEVELOPMENT REGULATIONS ARE
 BEING MET AS PART OF THE MARINA EXPANSION.
  
 4) PLEASE PROVIDE RESPONSES TO THE ISSUES RAISED IN THE
 FEBRUARY 9, 2016 OBJECTIONS TO PPRC LETTER SENT BY
 PETER BRETON TO ANGELLA VANN.
  
  

  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved