| Plan Review Stops For Project Z15120011 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
01-12-2016 |
|
|
Cont ID |
|
| Sent By |
rbrown |
Date |
01-12-2016 |
Time |
20:20 |
Rev Time |
0.00 |
| Received By |
rbrown |
Date |
01-12-2016 |
Time |
20:20 |
Sent To |
|
|
| Notes |
| 2016-01-12 20:25:56 | DEVELOPMENT SERVICES DEPARTMENT, BUILDING DIVISION, | | | COMMENTS: | | | | | | 1. THIS REVIEW IS A CURSORY REVIEW AS IT RELATES TO THE | | | SITE. IT IS NOT A REVIEW FOR FULL COMPLIANCE WITH | | | FLORIDA BUILDING CODE. THE FOLLOWING COMMENTS ARE TO BE | | | ADDRESSED FOR PERMITTING. | | | | | | 2. SHEET FSP-1 SHOWS THAT THE NUMBER OF PARKING SPACES | | | WILL BE INCREASED FROM 41 TO 70. THE PLANS DO NOT MAKE | | | THE MINIMUM NUMBER OF ACCESSIBLE PARKING SPACES | | | PROVIDED SHALL BE IN ACCORDANCE WITH SECTION 208.2 OF | | | FLORIDA ACCESSIBILITY CODE. | | | | | | 3. PER SECTION 208.3 OF FLORIDA ACCESSIBILITY CODE, | | | ACCESSIBLE PARKING SPACES ARE TO BE LOCATED ON THE | | | SHORTEST POSSIBLE ROUTE OF TRAVEL FROM ADJACENT PARKING | | | TO AN ACCESSIBLE ENTRANCE FOR EACH BUILDING. THE DESIGN | | | OF ACCESSIBLE PARKING SPACES SHALL COMPLY WITH SECTION | | | 502 OF FLORIDA ACCESSIBILITY CODE. IT IS NOT CLEAR WHAT | | | BUILDING(S) THE PARKING LOT SERVES AND WHERE THE | | | ACCESSIBLE PARKING SPACES ARE LOCATED. | | | | | | 4. SEPARATE PERMITS REQUIRED. ALL APPLICABLE PERMITS | | | AND SUB-PERMITS MUST BE OBTAINED BEFORE COMMENCING THE | | | WORK. SEPARATE PERMITS, PLANS AND FEES, ARE REQUIRED | | | FOR SIGNS, SWIMMING POOLS AND SPAS, GAS SYSTEMS, | | | GENERATORS, FIRE ALARM SYSTEMS, FIRE SPRINKLER AND | | | OTHER FIRE SUPPRESSION SYSTEMS, GREASE INTERCEPTORS, | | | SITE LIGHTING, SITE LANDSCAPE, SITE IRRIGATION, ETC. | | | | | | ROBERT BROWN | | | BUILDING OFFICIAL | | | TEL: 561 805 6652 | | | EMAIL: [email protected] | | | |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
1 |
Status |
F |
Date |
01-13-2016 |
|
|
Cont ID |
|
| Sent By |
cranford |
Date |
01-13-2016 |
Time |
09:38 |
Rev Time |
0.00 |
| Received By |
cranford |
Date |
01-13-2016 |
Time |
09:37 |
Sent To |
|
|
| Notes |
| 2016-01-13 09:38:42 | CITY OF WEST PALM BEACH | | | PUBLIC WORKS DEPARTMENT | | | | | | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL | | | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION | | | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE | | | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT | | | APPLICATION PROCESSES. THE ENGINEERING DEVELOPMENT | | | APPROVAL APPLICATION FORMS CAN BE DOWNLOADED AT | | | HTTP://WPB.ORG/ENGINEERING/FORMS-AND-PUBLICATIONS/ | | | | | | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE | | | PLAN APPROVAL. | | | | | | 1. PLEASE SUBMIT A COPY OF THE PROPOSED UNITY OF | | | CONTROL OR CROSS ACCESS AGREEMENT FOR APPROVAL BY THE | | | CITY ATTORNEY DEPARTMENT. | | | | | | 2. PLEASE REVISE THE DRIVEWAY APRONS ON THE ALLEY TO | | | MEET THE CITY?S ENGINEERING DESIGN STANDARDS. HTTP://WP | | | B.ORG/ENGINEERING/ENGINEERING-SERVICES/ENGINEERING-STAN | | | DARDS/ | | | | | | 3. THE ALLEY WIDTH (12 FT) IS ONLY WIDE ENOUGH FOR | | | ONE-WAY TRAFFIC. PLEASE SHOW THE LOCATION OF THE | | | PROPOSED ONE-WAY SIGNAGE. | | | | | | 4. PLEASE SUBMIT UPDATED DRAINAGE CALCULATIONS THAT | | | DEMONSTRATE THAT THE PROJECT WILL PROVIDE ADEQUATE | | | DRAINAGE AND STORMWATER MANAGEMENT. COMPLIANCE WITH | | | CHAPTER 40E-4 WILL DEMONSTRATE COMPLIANCE WITH THIS | | | PROVISION [SECTIONS 90-201, 94-35(C )(11), AND 94-307]. | | | | | | 5. PER SECTION 2.21.2 OF THE CITY RIGHT OF WAY | | | STANDARDS MANUAL, PROJECTS WHICH DISTURB 40% OR MORE OF | | | A ROADWAY (LINEAR FOOTAGE) PER BLOCK WILL BE REQUIRED | | | TO MILL AND RESURFACE THE ENTIRE BLOCK. PLEASE INCLUDE | | | MILLING AND RESURFACING OF THE ALLEY FROM S DIXIE TO | | | THE EASTERN PROPERTY LINE AND THE SOUTHERN SIDEWALK | | | ALONG ROSEMARY ON THE CONSTRUCTION PLANS. | | | | | | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO | | | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING | | | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. | | | | | | 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION WILL | | | BE REQUIRED FROM THE ENGINEERING DIVISION OF THE PUBLIC | | | WORKS DEPARTMENT. THE ENGINEERING DEVELOPMENT APPROVAL | | | APPLICATION FORMS CAN BE DOWNLOADED AT | | | HTTP://WPB.ORG/ENGINEERING/FORMS-AND-PUBLICATIONS/ | | | | | | KELLY CRANFORD, P.E. | | | PUBLIC WORKS CIP MANAGER | | | [email protected] | | | 561-494-1098 (OFFICE) | | | | | | VINCE NOEL, PSM | | | CITY SURVEYOR / REAL ESTATE SUPERVISOR | | | [email protected] | | | 561-494-1096 | | | | | | BRIAN COLLINS, PE | | | CITY TRAFFIC ENGINEER | | | [email protected] | | | 561-494-1040 | | | | | | FERDINAND RIVERA | | | PUBLIC WORKS OPERATIONS MANAGER | | | [email protected] | | | 561-822-2076 | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | 561-494-1120 | | | [email protected] | | | | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
12-31-2015 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
12-31-2015 |
Time |
15:37 |
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
12-31-2015 |
Time |
15:37 |
Sent To |
|
|
| Notes |
| 2015-12-31 15:39:13 | THE FOLLOWING COMMENTS WERE SUBMITTED BY PETER LEDUC, | | | FIRE MARSHAL, BUREAU OF FIRE PREVENTION, WEST PALM | | | BEACH FIRE RESCUE. | | | | | | THIS REVIEW CAN ONLY BE CONSIDERED PRELIMINARY AS THE | | | DRAWINGS THAT WERE REVIEWED WERE NOT COMPLETE. | | | ADDITIONAL COMMENTS CAN BE EXPECTED WHEN FULL DRAWINGS | | | ARE SUBMITTED FOR PERMIT. | | | | | | THE FIRE PREVENTION BUREAU HAS NO OBJECTIONS TO THE | | | PROPOSED PROJECT. | | | | | | THE BUREAU'S APPROVAL OF THIS SUBMITTED PROJECT DOES | | | NOT CONSTITUTE IT'S FINAL REVIEW OR APPROVAL. | | | | | | THE BUREAU SHALL REVIEW ALL SUBMITTED PLANS AT THE | | | APPROPRIATE TIME AND IN ACCORDANCE WITH THE | | | REQUIREMENTS OF ALL APPLICABLE CODES AND STANDARDS. | | | | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | 561-804-4709 | | | [email protected] | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
2 |
Status |
F |
Date |
03-17-2016 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
03-17-2016 |
Time |
14:29 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
03-17-2016 |
Time |
14:29 |
Sent To |
|
|
| Notes |
| 2016-03-17 14:30:54 | FROM: RAY CARANCI, LANDSCAPE PLANNER | | | PROJECT: GARDENIA STREET PARKING LOT Z15120011 | | | MARCH 14, 2016 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | 1. NOT SATISFIED. PLEASE PROVIDE CALCULATIONS FOR THE | | | REQUIRED TREES IN THE NEW AREA OF THE SOUTH BUFFER. | | | THE 122 FEET OF NEW BUFFER REQUIRES 5 TREES. PLEASE | | | PROVIDE AN ADDITIONAL TREE. | | | | | | 2. SATISFIED. PALMS MAY BE SUBSTITUTED IN THE SOUTH | | | BUFFER FOR REQUIRED TREES, UP TO 35% OF THE REQUIRED | | | TREES ON SITE. | | | | | | 3. SATISFIED. PLEASE REVISE THE LANDSCAPE PLAN TO SHOW | | | PALMS ADDED IN THE EXISTING TERMINAL LANDSCAPE ISLANDS | | | TO MEET THE CODE REQUIREMENTS. THERE IS SUFFICIENT | | | PLANTING AREA TO SUPPORT THEM. | | | | | | 4. NOT SATISFIED. PLEASE CORRECT THE NORTH BUFFER | | | CALCULATION TO SHOW 11 REQUIRED TREES. PLEASE CALCULATE | | | USING THE LENGTH OF THE BUFFER AND PROVIDE A TREE FOR | | | EACH 30 FEET OR PORTION THEREOF FOR ALL BUFFERS. | | | | | | THE NORTH BUFFER IS 305 FEET REQUIRING 11 TREES. PLEASE | | | REVISE.Z1512 | | | | | | 5. SATISFIED. PLEASE REVISE THE LANDSCAPE AND SITE | | | PLANS TO SHOW CURBS AND PERVIOUS OVERHANG INSTEAD OF | | | WHEEL STOPS TO EXPAND THE EXISTING LANDSCAPE DIVIDER | | | STRIPS, ALLOWING MORE AREA FOR THE EXISTING TREES. | | | | | | 6. PARTIALLY SATISFIED. PLEASE PROVIDE MORE INFORMATION | | | ON THE CONDITION OF THE EXISTING TREES PROPOSED TO BE | | | REMOVED, SUCH AS AN ASSESSMENT FROM A CERTIFIED | | | ARBORIST. STAFF OBSERVATIONS ON SITE DO NOT REVEAL ANY | | | REASON TO REMOVE THE EXISTING MAHOGANY TREES IN THE | | | DIVIDER MEDIANS. | | | | | | STAFF REQUESTS TO MEET THE CONSULTING ARBORIST ON SITE | | | TO CLARIFY AND DOCUMENT THE LOCATIONS OF DESCRIBED | | | HAZARDS FOR EACH TREE. | | | | | | 7. SATISFIED. PLEASE PROPOSE A TALLER SPECIES OF HEDGE | | | IN THE EXISTING TERMINAL ISLANDS ALONG THE ALLEY. | | | | | | | | | | | | | | | | | | | | | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
1 |
Status |
F |
Date |
01-11-2016 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
01-11-2016 |
Time |
16:55 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
01-11-2016 |
Time |
16:55 |
Sent To |
|
|
| Notes |
| 2016-01-11 16:55:56 | FROM: RAY CARANCI, LANDSCAPE PLANNER 561-822-1462 | | | PROJECT: GARDENIA STREET PARKING LOT Z15120011 | | | JANUARY 11, 2016 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | 1. PLEASE PROVIDE CALCULATIONS FOR THE REQUIRED TREES | | | IN THE NEW AREA OF THE SOUTH BUFFER. | | | | | | 2. PALMS MAY BE SUBSTITUTED IN THE SOUTH BUFFER FOR | | | REQUIRED TREES, UP TO 35% OF THE REQUIRED TREES ON | | | SITE. | | | | | | 3. PLEASE REVISE THE LANDSCAPE PLAN TO SHOW PALMS ADDED | | | IN THE EXISTING TERMINAL LANDSCAPE ISLANDS TO MEET THE | | | CODE REQUIREMENTS. THERE IS SUFFICIENT PLANTING AREA TO | | | SUPPORT THEM. | | | | | | 4. PLEASE CORRECT THE NORTH BUFFER CALCULATION TO SHOW | | | 11 REQUIRED TREES. PLEASE CALCULATE USING THE LENGTH OF | | | THE BUFFER AND PROVIDE A TREE FOR EACH 30 FEET OR | | | PORTION THEREOF FOR ALL BUFFERS. | | | | | | 5. PLEASE REVISE THE LANDSCAPE AND SITE PLANS TO SHOW | | | CURBS AND PERVIOUS OVERHANG INSTEAD OF WHEEL STOPS TO | | | EXPAND THE EXISTING LANDSCAPE DIVIDER STRIPS, ALLOWING | | | MORE AREA FOR THE EXISTING TREES. | | | | | | 6. PLEASE PROVIDE MORE INFORMATION ON THE CONDITION OF | | | THE EXISTING TREES PROPOSED TO BE REMOVED, SUCH AS AN | | | ASSESSMENT FROM A CERTIFIED ARBORIST. STAFF | | | OBSERVATIONS ON SITE DO NOT REVEAL ANY REASON TO REMOVE | | | THE EXISTING MAHOGANY TREES IN THE DIVIDER MEDIANS. | | | | | | 7. PLEASE PROPOSE A TALLER SPECIES OF HEDGE IN THE | | | EXISTING TERMINAL ISLANDS ALONG THE ALLEY. | | | | | | | | | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | |
|
|
| Review Stop |
PARK |
PARKING |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
POLICE |
POLICE |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
PW |
PUBLIC WORKS |
| Rev No |
1 |
Status |
N |
Date |
01-13-2016 |
|
|
Cont ID |
|
| Sent By |
cranford |
Date |
01-13-2016 |
Time |
09:57 |
Rev Time |
0.00 |
| Received By |
cranford |
Date |
01-13-2016 |
Time |
09:57 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
1 |
Status |
F |
Date |
01-13-2016 |
|
|
Cont ID |
|
| Sent By |
cranford |
Date |
01-13-2016 |
Time |
09:57 |
Rev Time |
0.00 |
| Received By |
cranford |
Date |
01-13-2016 |
Time |
09:57 |
Sent To |
|
|
| Notes |
| 2016-01-13 09:57:11 | SEE COMMENTS UNDER ENG PPRC |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
1 |
Status |
F |
Date |
01-13-2016 |
|
|
Cont ID |
|
| Sent By |
cranford |
Date |
01-13-2016 |
Time |
09:56 |
Rev Time |
0.00 |
| Received By |
cranford |
Date |
01-13-2016 |
Time |
09:56 |
Sent To |
|
|
| Notes |
| 2016-01-13 09:56:50 | SEE COMMENTS UNDER ENG PPRC |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
1 |
Status |
F |
Date |
01-13-2016 |
|
|
Cont ID |
|
| Sent By |
cranford |
Date |
01-13-2016 |
Time |
09:39 |
Rev Time |
0.00 |
| Received By |
cranford |
Date |
01-13-2016 |
Time |
09:38 |
Sent To |
|
|
| Notes |
| 2016-01-13 09:39:14 | SEE COMMENTS UNDER ENG PPRC |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
01-11-2016 |
|
|
Cont ID |
|
| Sent By |
aaponte |
Date |
01-11-2016 |
Time |
14:09 |
Rev Time |
0.00 |
| Received By |
aaponte |
Date |
01-11-2016 |
Time |
14:09 |
Sent To |
|
|
| Notes |
| 2016-01-11 15:19:48 | THE SITE OF THE PROPOSED PARKING LOT EXPANSION | | | CURRENTLY HAS A TWO-STORY STRUCTURE. THE SURFACE | | | PARKING LOT IS ONLY POSSIBLE IF THE EXISTING STRUCTURE | | | IS RELOCATED. PLEASE COORDINATE WIH THE CRA FOR THE | | | RELOCATION OF THE STRUCTURE. | | | THE NEW SURFACE PARKING LOT AREA IS REQUIRED TO COMPLY | | | WITH THE MINIMUM SETBACK REQUIREMENT ALONG GARDENIA | | | STREET PLUS THE 5 FOOT LANDSCAPE BUFFER. | | | STAFF RECOMMENDS TO REPLACE WHEEL STOPS BY CONTINUES | | | CURBS AND ALLOW THE MEDIAN PLANTING AREA TO INCLUDE THE | | | TWO FRONT FEET OF THE PARKING SPACES. | | | WHAT IS THE DIRECTION OF THE 12' DRIVE AISLE ON THE | | | NORTH SIDE OF THE SURFACE PARKING? | | | PROJECT IS REQURIED TO PROVIDE HANDICAP SPACES | | | ACCORDING TO TABLE XV-3. | | | FOR ADDITONAL INFORMATION PLEASE CONTACT ANA MARIA | | | APONTE AT 561-8221439. |
|
|
| |