Plan Review Details - Project Z15080039
| Plan Review Stops For Project Z15080039 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
09-08-2015 |
|
|
Cont ID |
|
| Sent By |
rbrown |
Date |
09-08-2015 |
Time |
20:19 |
Rev Time |
0.00 |
| Received By |
rbrown |
Date |
09-08-2015 |
Time |
19:54 |
Sent To |
|
|
| Notes |
| 2015-09-08 20:19:06 | DEVELOPMENT SERVICES DEPARTMENT, BUILDING DIVISION, | | | COMMENTS: | | | | | | 1. THIS REVIEW IS A CURSORY REVIEW AS IT RELATES TO THE | | | SITE. IT IS NOT A REVIEW FOR FULL COMPLIANCE WITH | | | FLORIDA BUILDING CODE. THE FOLLOWING COMMENTS ARE TO BE | | | ADDRESSED FOR PERMITTING. | | | | | | 2. THE SURVEY DRAWING SHOWS PROPERTY LINES IN | | | TTRAVERSING THE FOOTPRINT OF THE PROPOSED BUILDINGS. | | | FOR ANY BUILDING CROSSING A PROPERTY LINE, EITHER A | | | RECORDED UNITY OF TITLE, OR SOME OTHER APPROVED LEGAL | | | INSTRUMENT, SHALL BE INCLUDED WITH THE PERMIT | | | APPLICATION, OR THE BUILDING MUST HAVE A FIRE WALL | | | ALONG THE PROPERTY LINE, PER SECTION 202 OF FLORIDA | | | BUILDING CODE, BUILDING, FIRE SEPARATION DISTANCE. | | | | | | 3. THE BUILDING ENTRANCES ARE NOT YET IDENTIFIED ON THE | | | PLANS. WHEN SUBMITTED FOR PERMIT, THE PLANS SHALL SHOW | | | AT LEAST ONE ACCESSIBLE ROUTE, COMPLYING WITH SECTIONS | | | 206.2 AND 402.2 OF FLORIDA ACCESSIBILITY CODE, FROM THE | | | PUBLIC RIGHT-OF-WAY TO ALL ACCESSIBLE BUILDING OR | | | FACILITY ENTRANCES. | | | | | | 4. WHEN SUBMITTED FOR PERMIT, THE PLANS SHALL SHOW AT | | | LEAST ONE ACCESSIBLE ROUTE, COMPLYING WITH SECTIONS | | | 206.2 AND 402.2 OF FLORIDA ACCESSIBILITY CODE, | | | CONNECTING ACCESSIBLE BUILDING OR FACILITY ENTRANCES | | | WITH ALL ACCESSIBLE SPACES AND ELEMENTS WITHIN THE | | | BUILDING OR FACILITY | | | | | | 5. ANY PART OF AN ACCESSIBLE ROUTE WITH A SLOPE GREATER | | | THAN 1:20 SHALL BE CONSIDERED A RAMP AND SHALL COMPLY | | | WITH SECTION 405 OF FLORIDA ACCESSIBILITY CODE. | | | | | | 6. NO ACCESSIBLE PARKING SPACES ARE SHOWN ON THE PLANS | | | AT THIS STAGE. WHEN SUBMITTED FOR PERMIT, THE MINIMUM | | | NUMBER OF ACCESSIBLE PARKING SPACES PROVIDED SHALL BE | | | IN ACCORDANCE WITH SECTION 208.2 OF FLORIDA | | | ACCESSIBILITY CODE. | | | | | | 7. PER SECTION 208.3 OF FLORIDA ACCESSIBILITY CODE, | | | ACCESSIBLE PARKING SPACES ARE TO BE LOCATED ON THE | | | SHORTEST POSSIBLE ROUTE OF TRAVEL FROM ADJACENT PARKING | | | TO AN ACCESSIBLE ENTRANCE FOR EACH BUILDING. THE DESIGN | | | OF ACCESSIBLE PARKING SPACES SHALL COMPLY WITH SECTION | | | 502 OF FLORIDA ACCESSIBILITY CODE | | | | | | 8. PER SECTION 208.2.4 OF FLORIDA ACCESSIBILITY CODE, | | | ONE IN EVERY SIX ACCESSIBLE SPACES (AT LEAST ONE) IN A | | | PARKING STRUCTURE, SHALL BE ?VAN ACCESSIBLE? AND | | | DESIGNED IN ACCORDANCE WITH SECTION OF 502 OF FLORIDA | | | ACCESSIBILITY CODE (VERTICAL CLEARANCE NOT LESS THAN 98 | | | INCHES AT SPACE AND VEHICULAR ACCESS ROUTE) | | | | | | 9. ACCESSIBLE PARKING SPACE ACCESS AISLES SHALL BE | | | LOCATED SO THAT THE USER IS NOT COMPELLED TO WALK OR | | | WHEEL BEHIND ANOTHER PARKED VEHICLE OR IN THE TRAVEL | | | LANE. THE ACCESS AISLES SHALL ALSO COMPLY WITH THE | | | OTHER PROVISIONS OF SECTION OF 502.3 OF FLORIDA | | | ACCESSIBILITY CODE. | | | | | | 10. WHEN SUBMITTED FOR BUILDING PERMIT, THE PLANS SHALL | | | SHOW THAT THE TYPE OF CONSTRUCTION FOR THE BUILDINGS | | | WILL BE IN ACCORDANCE WITH THE HEIGHT, AREA AND | | | OCCUPANCY LIMITATIONS IN CHAPTER 5 OF THE FLORIDA | | | BUILDING CODE. | | | | | | 11. WHEN SUBMITTED FOR BUILDING PERMIT, COMPLIANCE WITH | | | ALL BUILDING SEPARATION, PERCENTAGE OF OPENINGS AND | | | OPENING PROTECTIVE REQUIREMENTS OF CHAPTERS 6 AND 7 OF | | | THE FLORIDA BUILDING CODE SHALL BE VERIFIED. | | | | | | 12. ENCLOSED PARKING GARAGES. IF THE PARKING GARAGE | | | DOES NOT HAVE WALL OPENINGS, OR SUFFICIENT WALL | | | OPENINGS TO MEET THE DEFINITION OF AN OPEN PARKING | | | GARAGE, IT WILL BE CONSIDERED AN ENCLOSED PARKING | | | GARAGE AND MUST HAVE EXHAUST SYSTEMS. THE EXHAUST | | | SYSTEMS SHALL BE DESIGNED TO MINIMIZE NOISE LEVELS | | | USING INLINE FAN SILENCERS OR OTHER APPROVED METHODS. | | | | | | 13. SEPARATE PERMITS REQUIRED. ALL APPLICABLE PERMITS | | | AND SUB-PERMITS MUST BE OBTAINED BEFORE COMMENCING THE | | | WORK. SEPARATE PERMITS, PLANS AND FEES, ARE REQUIRED | | | FOR SIGNS, SWIMMING POOLS AND SPAS, GAS SYSTEMS, | | | GENERATORS, FIRE ALARM SYSTEMS, FIRE SPRINKLER AND | | | OTHER FIRE SUPPRESSION SYSTEMS, GREASE INTERCEPTORS, | | | SITE LIGHTING, SITE LANDSCAPE, SITE IRRIGATION, ETC. | | | | | | 14. EACH SEPARATE BUILDING SHALL HAVE A SEPARATE | | | ADDRESS. FOR STREET ADDRESSING, CONTACT MICHAEL ORIO, | | | GIS SUPPORT SPECIALIST, AT (561) 494 1080, OR BY EMAIL: | | | [email protected] | | | | | | 15. THIS PROJECT WILL BE SUBJECT TO ART IN PUBLIC | | | PLACES (AIPP) ASSESSMENT. FOR ADVICE ON THE PROVISION | | | OF PUBLIC ARTWORK IN LIEU OF THE AIPP ASSESSMENT, | | | CONTACT SYBILLE WELTER, ART IN PUBLIC PLACES | | | COORDINATOR, AT (561) 822-1521, OR BY EMAIL: | | | [email protected] | | | | | | ROBERT BROWN | | | BUILDING OFFICIAL | | | TEL: 561 805 6652 | | | EMAIL: [email protected] | | | |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
2 |
Status |
P |
Date |
11-25-2015 |
|
|
Cont ID |
|
| Sent By |
cranford |
Date |
11-25-2015 |
Time |
10:50 |
Rev Time |
0.00 |
| Received By |
cranford |
Date |
11-25-2015 |
Time |
10:46 |
Sent To |
|
|
| Notes |
| 2015-11-25 10:48:54 | CITY OF WEST PALM BEACH | | | PUBLIC WORKS DEPARTMENT | | | | | | SEE COMMENTS UNDER TRAFFIC FOR COMMENTS ON THE | | | SUBMITTED TRAFFIC STUDY. | | | | | | PROPOSED PEAK WATER DEMAND/WASTE WATER FLOW = 470 GPM | | | (PF OF 2.5) | | | SOLID WASTE = 40,800 LB/DAY = 20 YD/DAY COMPACTED | | | | | | | | | KELLY CRANFORD, P.E. | | | LAND DEVELOPMENT ENGINEER | | | [email protected] | | | 561-494-1098 (OFFICE) |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
1 |
Status |
F |
Date |
09-08-2015 |
|
|
Cont ID |
|
| Sent By |
cranford |
Date |
09-08-2015 |
Time |
13:53 |
Rev Time |
0.00 |
| Received By |
cranford |
Date |
09-08-2015 |
Time |
13:51 |
Sent To |
|
|
| Notes |
| 2015-09-08 13:53:25 | CITY OF WEST PALM BEACH | | | PUBLIC WORKS DEPARTMENT | | | | | | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL | | | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION | | | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE | | | BUILDING PERMIT APPLICATION PROCESSES. | | | | | | 1. A TRAFFIC STUDY WILL BE REQUIRED FOR THIS PROJECT | | | SHOWING HOW THE PROPOSED DEVELOPMENT WILL AFFECT THE | | | TRAFFIC VOLUME AND SURROUNDING LOCAL ROADWAYS. INCLUDE | | | TRAFFIC ACCIDENT DATA FOR AFFECTED STREET CORRIDORS. | | | ESTIMATE INCREASED OR DECREASED POTENTIAL. SAFETY | | | IMPROVEMENTS SHALL BE RECOMMENDED WHERE NECESSARY. | | | PLEASE SCHEDULE A MEETING WITH THE CITY TRAFFIC | | | ENGINEER TO DISCUSS DETAILS OF THE STUDY REQUIREMENTS. | | | | | | 2. FDOT APPROVAL OF THE PROPOSED DRIVEWAY ON QUADRILLE | | | WILL BE REQUIRED PRIOR TO FINAL SITE PLAN APPROVAL. | | | | | | 3. ALL STRIPING WITHIN THE CITY RIGHTS-OF-WAY TO BE | | | THERMOPLASTIC. | | | | | | 4. STOP BARS WILL BE REQUIRED WHERE STOP SIGNS ARE | | | PROPOSED. | | | | | | 5. PLEASE EVALUATE THE TRAFFIC PATTERNS FOR THE | | | PROPOSED INTERNAL DROP OFF AND PARKING ENTRANCE. | | | CONSIDER NARROWING THE DRIVE TO ONE LANE TO AVOID LANE | | | CHANGE CONFLICTS. | | | | | | 6. PLEASE SHOW THE PROPOSED STRIPING AT THE EXIT ONTO | | | 4TH STREET. THE LANES SHOULD BE DEDICATED AS EITHER | | | LEFT OR RIGHT TURN. | | | | | | 7. EXISTING UTILITY LATERALS AND SERVICES WHICH WILL | | | NOT REMAIN IN USE MUST BE REMOVED BACK TO THE MAIN | | | RATHER THAN BEING CUT AND CAPPED AT THE RIGHT-OF-WAY | | | LINE. | | | | | | 8. THE CITY WILL EVALUATE THE CONDITION OF THE EXISTING | | | OFF-SITE UTILITIES WITHIN THE NEXT 30 DAYS. THE | | | PROPOSED ABANDONMENT OF A PORTION OF THE CITY?S | | | SANITARY SEWER WILL BE REVIEWED AT THAT TIME. | | | | | | 9. THE EXISTING UTILITY STRUCTURE LOCATIONS ON THE | | | SUBMITTED SURVEY AND THE LOCATIONS SHOWN ON THE | | | SUBMITTED PRELIMINARY UTILITY PLANS DO NOT MATCH. | | | PLEASE VERIFY WHICH PLAN SHOWS THE CORRECT EXISTING | | | UTILITY STRUCTURE LOCATIONS. | | | | | | 10. PLEASE SUBMIT ESTIMATES FOR THE PEAK POTABLE WATER | | | DEMAND, SANITARY SEWER FLOW, AND SOLID WASTE COLLECTION | | | YARDAGE. | | | | | | 11. VERIFY THAT THE PROPOSED SIZE AND QUANTITY OF TRASH | | | BINS IS APPROPRIATE FOR THE WASTE YARDAGE ANTICIPATED | | | TO BE GENERATED BY THE COMPLEX. CONSIDER USING A | | | COMPACTOR TO REDUCE THE YARDAGE OF WASTE THAT WILL NEED | | | TO BE COLLECTED. IF A COMPACTOR LARGER THAN 8 CUBIC | | | YARDS IS PROPOSED, PLEASE PROVIDE A LETTER FROM THE | | | APPROPRIATE PRIVATE SERVICE PROVIDER STATING THEY HAVE | | | REVIEWED THE PROPOSED SITE PLAN AND WILL BE ABLE TO | | | SERVICE THE COMPACTOR IN THE PROPOSED LOCATION. | | | | | | 12. A MAINTENANCE AGREEMENT WILL BE REQUIRED FOR THE | | | NON-STANDARD ELEMENTS (PAVERS AND LANDSCAPING) PROPOSED | | | WITHIN THE 4TH STREET AND NORTH DIXIE RIGHTS-OF-WAY. | | | | | | 13. PAVEMENT RESTORATION WILL NEED TO BE IN ACCORDANCE | | | WITH CITY STANDARD DETAIL GC-9. THE ROAD SHALL BE | | | MILLED/RESURFACED FOR FULL LANE WIDTH OF THE TRAVEL | | | LANE(S) ENCROACHED BY THE TRENCH AREA, INCLUDING A | | | TRANSITION AREA OF 50 FEET ON EACH SIDE OF THE TRENCH. | | | PLEASE REVISE THE PLANS TO SHOW THE EXTENT OF THE | | | MILLING AND RESURFACING. | | | | | | 14. PLEASE REVISE THE DRIVEWAY APRONS TO MEET THE | | | CITY?S ENGINEERING DESIGN STANDARDS. PLEASE ALSO | | | INCLUDE THE DETAILS FOR THE SIDEWALK RAMPS, HTTP://WPB. | | | ORG/ENGINEERING/ENGINEERING-SERVICES/ENGINEERING-STANDA | | | RDS/ | | | | | | 15. PLEASE REVISE THE LANDSCAPE PLAN TO SHOW LOCATIONS | | | OF ALL WATER METERS, VALVES, CLEAN-OUTS, LIGHT POLES, | | | ETC. ROOT BARRIERS MAY BE REQUIRED WHERE PLANTINGS ARE | | | NEAR UNDERGROUND STORMWATER, SANITARY, OR POTABLE WATER | | | LINES. ALSO CLEARLY INDICATE ALL EXISTING AND PROPOSED | | | EASEMENTS ON THE LANDSCAPE PLAN. | | | | | | 16. PLEASE SHOW THE SIGHT TRIANGLES ON THE GROUND FLOOR | | | LANDSCAPING PLAN FOR THE INTERSECTIONS AND VEHICULAR | | | EXITS. (SECTION 94-305E, CODE OF ORDINANCES) | | | | | | 17. PRELIMINARY, UPDATED FEMA FLOOD INSURANCE MAPS ARE | | | AVAILABLE AT HTTP://WWW.CO.PALM-BEACH.FL.US/NEWSROOM/08 | | | 14/08-26-14-FLOOD_MAPS.HTM PLEASE REVIEW THE MAPS AND | | | VERIFY THAT THE NEW MAPS WILL NOT IMPACT THE PROPOSED | | | PROJECT. | | | | | | 18. THE PROPOSED PARKING LEVELS ARE LOWER THAN THE | | | ADJACENT ROADWAYS. HOW WILL FLOOD PROTECTION AND | | | DRAINAGE BE PROVIDED FOR THESE LEVELS? | | | | | | 19. THE PROPOSED IMPROVEMENTS MAY REQUIRE A PORTION OF | | | THE SOUTHEAST CORNER NEAR DIXIE HIGHWAY TO BE DEDICATED | | | TO THE CITY. | | | | | | 20. THE SITE PLAN PROPOSED MOVING THE EXISTING CURB | | | LINE ON 4TH STREET TO THE SOUTH AND A REDUCTION IN THE | | | NUMBER OF ON-STREET, METERED PARKING SPOTS. | | | | | | 21. PROPERTY WILL BE REQUIRED TO BE REPLATTED. | | | | | | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO | | | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING | | | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. | | | | | | 1. A SEPARATE SUBMITTAL WILL BE REQUIRED TO THE | | | ENGINEERING DIVISION OF THE PUBLIC WORKS DEPARTMENT FOR | | | ENGINEERING DEVELOPMENT APPROVAL. THE ENGINEERING | | | DEVELOPMENT APPROVAL APPLICATION FORMS CAN BE | | | DOWNLOADED AT | | | HTTP://WPB.ORG/ENGINEERING/FORMS-AND-PUBLICATIONS/ | | | | | | 2. A SEPARATE SUBMITTAL WILL BE REQUIRED TO THE | | | ENGINEERING DIVISION OF THE PUBLIC WORKS DEPARTMENT FOR | | | PLAT APPROVAL. PLEASE CONTACT VINCE NOEL AT | | | [email protected] TO GET A COPY OF THE PLAT APPLICATION. | | | | | | 3. SOLID WASTE YARDAGE WILL NEED TO BE ESTIMATED AS | | | PART OF THE FINAL DESIGN TO VERIFY THAT THE DESIGN | | | INCLUDES APPROPRIATE NUMBER AND SIZE OF TRASH BINS. | | | | | | 4. IDENTIFY THE SOURCE OF THE AS-BUILT INFORMATION | | | UTILIZED FOR THE POTABLE WATER, SANITARY SEWER, AND | | | STORM SEWER DESIGN. | | | | | | 5. DETAILS SHEETS WILL NEED TO UTILIZE STANDARD CITY OF | | | WEST PALM BEACH DETAILS, WHICH MAY BE DOWNLOADED AT | | | HTTP://WPB.ORG/ENGINEERING/FORMS-AND-PUBLICATIONS/ | | | | | | KELLY CRANFORD, P.E. | | | LAND DEVELOPMENT ENGINEER | | | [email protected] | | | 561-494-1098 (OFFICE) | | | | | | VINCE NOEL, PSM | | | CITY SURVEYOR / REAL ESTATE SUPERVISOR | | | [email protected] | | | 561-494-1096 | | | | | | BRIAN COLLINS, PE | | | CITY TRAFFIC ENGINEER | | | [email protected] | | | 561-494-1040 | | | | | | FERDINAND RIVERA | | | PUBLIC WORKS OPERATIONS MANAGER | | | [email protected] | | | 561-822-2076 | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | 561-494-1120 | | | [email protected] | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
11-13-2015 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
11-13-2015 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
11-13-2015 |
Time |
12:47 |
Sent To |
|
|
| Notes |
| 2015-11-13 13:15:59 | THE FOLLOWING COMMENTS WERE SUBMITTED BY PETER LEDUC, | | | FIRE MARSHAL, BUREAU OF FIRE PREVENTION, WEST PALM | | | BEACH FIRE RESCUE. | | | | | | THE PLANS RE- SUBMITTED FOR THIS REVIEW WERE OF | | | DIFFERENT DESIGN THAN THE FIRST. | | | | | | THIS REVIEW CAN ONLY BE CONSIDERED PRELIMINARY AS THE | | | DRAWINGS THAT WERE REVIEWED WERE NOT COMPLETE. | | | ADDITIONAL COMMENTS CAN BE EXPECTED WHEN FULL DRAWINGS | | | ARE SUBMITTED FOR PERMIT. | | | | | | THE FIRE PREVENTION BUREAU HAS NO OBJECTIONS TO THE | | | PROPOSED PROJECT. | | | | | | | | | 1. CONSTRUCTION, DEMOLITION, AND RENOVATION TO COMPLY | | | WITH NFPA 241. EXTRA ATTENTION SHALL BE GIVEN TO THE | | | PERMITTING AND LOCATION OF CONSTRUCTION TRAILERS. A | | | PERMIT IS REQUIRED FOR ANY CONSTRUCTION TRAILER RELATED | | | TO THIS PROJECT. SEPARATION DISTANCES FROM MAIN | | | STRUCTURES AS WELL AS OTHER TRAILERS SHALL BE CLOSELY | | | MONITORED FOR THE REQUIREMENTS OF FIRE SPRINKLER | | | PROTECTION. | | | | | | 2. SITE ACCESS AND EXIT POINTS ARE TO BE CLEARLY | | | IDENTIFIED AND MAINTAINED FOR EMERGENCY VEHICLES DURING | | | ALL CONSTRUCTION ACTIVITIES. | | | | | | 3. THE BUILDING ADDRESS SHALL BE CLEARLY VISIBLE FROM | | | ALL ACCESS ROADWAYS, INCLUDING DURING CONSTRUCTION. | | | ADDRESS NUMBERS SHALL CONTRAST WITH THEIR BACKGROUND | | | AND SHALL NOT BE LESS THAN SIX (6) INCHES IN HEIGHT | | | WITH A ONE (1) INCH STROKE FOR ALL BUILDINGS. | | | | | | 4. DURING CONSTRUCTION, TRASH AND DEBRIS IS TO BE | | | REMOVED FROM THE SITE DAILY OR MORE OFTEN TO REDUCE THE | | | ACCUMULATION OF POTENTIAL LIFE AND FIRE SAFETY HAZARDS. | | | | | | 5. THE CONSTRUCTION OF THE BUILDING SHALL COMPLY WITH | | | THE 5TH EDITION OF THE FLORIDA FIRE PREVENTION CODE, | | | INCLUDING NFPA 1 & 101, AND ALL ASSOCIATED FIRE CODES. | | | | | | FIRE SPRINKLER WORK SHALL COMPLY WITH THE REQUIREMENTS | | | OF NFPA 13, 2010 EDITION. | | | | | | FIRE ALARM WORK SHALL COMPLY WITH THE REQUIREMENTS OF | | | NFPA 72, 2010 EDITION. | | | | | | CONSTRUCTION WORK SHALL COMPLY WITH THE REQUIREMENTS OF | | | NFPA 241, 2009 EDITION. | | | | | | FIRE EXTINGUISHERS SHALL COMPLY WITH THE REQUIREMENTS | | | OF NFPA 10, 2010 EDITION. | | | | | | ELECTRIC WORK SHALL COMPLY WITH NFPA 70, 2011 EDITION. | | | | | | | | | 6. ALL PARKING STRUCTURES SHALL COMPLY WITH NFPA 88A, | | | PARKING STRUCTURES AND NFPA 101, THE LIFE SAFETY CODE, | | | INCLUDING MORE SPECIFICALLY, CHAPTER 42 STORAGE | | | OCCUPANCIES (PARKING STRUCTURES) | | | | | | 7. THE SEPARATION AND OPENING PROTECTION BETWEEN THE | | | PARKING GARAGE AND HOTE/APARTMENTS/OFFICES SHALL BE IN | | | ACCORDANCE AND COMPLIANCE WITH THE SPECIFIC AND MOST | | | STRINGENT PROVISION REQUIREMENT OF EITHER CHAPTER. | | | | | | 8. A NFPA 13 COMPLAINT FIRE SPRINKLER SYSTEM AND NFPA | | | 14 COMPLIANT WET STANDPIPE SYSTEM ARE REQUIRED FOR THIS | | | STRUCTURE. TEMPORARY STANDPIPES ARE REQUIRED WHEN THE | | | BUILDING REACHES THREE LEVELS OR THIRTY FEET WHILE | | | BEING CONSTRUCTED. SEPARATE SHOP DRAWINGS, ARE REQUIRED | | | TO BE SUBMITTED, REVIEWED AND APPROVED BY THE FIRE | | | PREVENTION BUREAU PRIOR TO ANY INSTALLATION. | | | | | | PER NFPA 14 SECTION 7.12.2, HIGH-RISE BUILDINGS SHALL | | | HAVE AT LEAST TWO REMOTELY LOCATED FIRE DEPARTMENT | | | CONNECTIONS FOR EACH ZONE. | | | | | | DUE TO THE SIZE AND COMPLEXITY OF THE PROPOSED WATER | | | SUPPLY CALCULATIONS, HYDRANT LOCATIONS, FIRE PUMPS(S), | | | AND FIRE LOAD CALCULATIONS SHALL BE SUBMITTED TO ENSURE | | | ADAQUATE PROTECTION. | | | | | | FOR THE PROPOSED FIRE PUMP(S) , WHAT IS(ARE) THE | | | PRIMARY AND SECONDARY POWER SOURCES? | | | | | | 9. A CLASS A NFPA 72 COMPLIANT MONITORED FIRE ALARM | | | SYSTEM IS REQUIRED FOR THIS STRUCTURE. TWO SEPARATE | | | SYSTEMS ARE REQUIRED, ONE FOR EACH TOWER. SEPARATE SHOP | | | DRAWINGS, ARE REQUIRED TO BE SUBMITTED, REVIEWED AND | | | APPROVED BY THE FIRE PREVENTION BUREAU PRIOR TO ANY | | | INSTALLATION. | | | | | | 10. COMPLETE LIFE SAFETY PLANS FOR EACH OCCUPANCY SHALL | | | BE PROVIDED THAT ILLUSTRATE OCCUPANT LOADS, TRAVEL | | | DISTANCES, COMMON PATHS OF TRAVEL, DEAD-END CORRIDORS, | | | EXIT SIGNS, EMERGENCY LIGHTING, EXITS LEADING TO A | | | PUBLIC WAY, FIRE EXTINGUISHER LOCATIONS, AND ALL FIRE | | | SAFETY FEATURES AND EQUIPMENT. | | | | | | 11. ALL EXIT DISCHARGE LOCATIONS SHALL BE CLEARLY | | | ILLUSTRATED ON THE PLAN. | | | | | | 12. ALL ILLUMINATED EXIT SIGNS AND EMERGENCY LIGHTING | | | EQUIPMENT SHALL BE ILLUSTRATED ON THE PLAN. | | | | | | FOR THE PROSED EMERGENCY POWER GENERATOR(S), WHAT IS | | | (ARE) THE PRIMARY AND SECONDARY POWER SOURCES? | | | | | | 13. ALL ELEVATORS SHALL BE EQUIPPED WITH A REGION 7 | | | KEYWAY SYSTEM. | | | | | | ANY BUILDING THAT IS MORE THAN THREE STORIES HIGH OR IN | | | WHICH THE VERTICAL DISTANCE BETWEEN THE BOTTOM TERMINAL | | | LANDING AND THE TOP TERMINAL LANDING EXCEEDS 25 FEET | | | MUST BE CONSTRUCTED TO CONTAIN AT LEAST ONE PASSENGER | | | ELEVATOR THAT IS OPERATIONAL AND WILL ACCOMMODATE AN | | | AMBULANCE STRETCHER 76 INCHES LONG AND 24 INCHES WIDE | | | IN THE HORIZONTAL POSITION. | | | | | | 14. ALL EXISTING AND NEW FIRE HYDRANTS PLANNED FOR THIS | | | DEVELOPMENT SHALL BE CLEARLY INDICATED AND IDENTIFIED | | | ON THE PLAN AND CLOSELY COORDINATED WITH THE BUREAU OF | | | FIRE PREVENTION. | | | | | | 15. ALL FIRE DEPARTMENT SPRINKLER SYSTEM CONNECTIONS | | | (FDC,S) FOR THE PROJECT SHALL BE IDENTIFIED AND | | | COORDINATED WITH THE BUREAU OF FIRE PREVENTION. | | | | | | 16. ALL FIRE WATER MAINS, SIZES AND THEIR VALVE | | | ASSEMBLIES SHALL BE CLEARLY IDENTIFIED AND ILLUSTRATED | | | ON THE PLAN. TWO SEPARATE WATER SUPPLIES SHALL BE | | | PROVIDED. | | | | | | 17. COMMAND ROOM | | | | | | THE FIRE COMMAND CENTER SHALL COMPLY WITH NFPA 1, | | | CHAPTER 11, BUILDING SERVICES; 11.9 AND SHALL CONTAIN | | | THE FOLLOWING FEATURES: | | | 1. SHALL BE A MINIMUM OF 200 FT SQUARED WITH A MINIMUM | | | DIMENSION OF 10 FT. | | | 2. THE FIRE DEPARTMENT COMMUNICATIONS SYSTEM. | | | 3. A TELEPHONE FOR FIRE DEPARTMENT USE WITH CONTROLLED | | | ACCESS TO THE PUBLIC TELEPHONE SYSTEM | | | 4. SCHEMATIC BUILDING PLANS INDICATING THE TYPICAL | | | FLOOR PLAN AND DETAILING THE BUILDING CORE, MEANS OF | | | EGRESS, FIRE PROTECTION SYSTEMS, FIRE-FIGHTING | | | EQUIPMENT AND FIRE DEPARTMENT ACCESS AND THE LOCATION | | | OF FIRE WALLS, FIRE BARRIERS, FIRE PARTITIONS, SMOKE | | | BARRIERS AND SMOKE PARTITIONS | | | 5. A WORK TABLE. | | | 6. IF APPLICABLE, A HAZARDOUS MATERIAL MANAGEMENT PLAN | | | FOR THE BUILDING. | | | 7. THE EMERGENCY VOICE/ALARM COMMUNICATION SYSTEM | | | CONTROL UNIT. | | | 8. ANNUNCIATOR UNIT VISUALLY INDICATING THE LOCATION OF | | | THE ELEVATORS AND WHETHER THEY ARE OPERATIONAL | | | 9. STATUS INDICATORS AND CONTROLS FOR AIR DISTRIBUTION | | | SYSTEMS. | | | 10. CONTROLS FOR UNLOCKING STAIRWAY DOORS | | | SIMULTANEOUSLY | | | 11. SPRINKLER VALVE AND WATER FLOW DETECTOR DISPLAY | | | PANELS | | | 12. EMERGENCY AND STANDBY POWER STATUS INDICATORS | | | 13. FIRE PUMP STATUS INDICATORS | | | 14. GENERATOR SUPERVISION DEVICES AND MANUAL START AND | | | TRANSFER FEATURES. | | | 15. PUBLIC ADDRESS SYSTEM, WHERE SPECIFICALLY REQUIRED | | | BY OTHER SECTIONS OF THIS CODE | | | 16. CONTROLS REQUIRED FOR SMOKE CONTROL | | | 17. ELEVATOR FIRE RECALL SWITCH IN ACCORDANCE WITH ASME | | | A17.1. | | | 18. ELEVATOR EMERGENCY OR STANDBY POWER SELECTOR | | | SWITCH(ES), WHERE EMERGENCY OR STANDBY POWER IS | | | PROVIDED | | | | | | | | | 18. RADIO | | | | | | NFPA 1, CHAPTER 11, BUILDING SERVICES; 11.10 TWO-WAY | | | RADIO ENHANCEMENT SERVICES. | | | 11.10.1 IN ALL NEW AND EXISTING BUILDINGS, MINIMUM | | | RADIO SIGNAL STRENGTH FOR FIRE DEPARTMENT | | | COMMUNICATIONS SHALL BE MAINTAINED AT A LEVEL | | | DETERMINED BY THE AHJ. | | | MAINTAIN A MINIMUM RADIO SIGNAL STRENGTH OF 102.0 DBM | | | FOR THE RADIO SYSTEM USED BY WEST PALM BEACH FIRE | | | RESCUE. IF THE MINIMUM CANNOT BE MAINTAINED, A | | | BI-DIRECTIONAL AMPLIFIED SYSTEM SHALL BE INSTALLED WITH | | | A MINIMUM 2-HOUR RUN TIME BATTERY BACK-UP. | | | | | | 19. THE BUREAU'S APPROVAL OF THIS SUBMITTED PROJECT | | | DOES NOT CONSTITUTE IT'S FINAL REVIEW OR APPROVAL. | | | | | | 20. THE BUREAU SHALL REVIEW ALL SUBMITTED BUILDING | | | PLANS AT THE APPROPRIATE TIME AND IN ACCORDANCE WITH | | | THE REQUIREMENTS OF ALL APPLICABLE CODES AND STANDARDS. |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
09-02-2015 |
Time |
09:52 |
Sent To |
|
|
| Notes |
| 2015-09-02 11:36:53 | THE FOLLOWING COMMENTS WERE SUBMITTED BY PETER LEDUC, | | | FIRE MARSHAL, BUREAU OF FIRE PREVENTION, WEST PALM | | | BEACH FIRE RESCUE. | | | | | | THIS REVIEW CAN ONLY BE CONSIDERED PRELIMINARY AS THE | | | DRAWINGS THAT WERE REVIEWED WERE NOT COMPLETE. | | | ADDITIONAL COMMENTS CAN BE EXPECTED WHEN FULL DRAWINGS | | | ARE SUBMITTED FOR PERMIT. | | | | | | THE FIRE PREVENTION BUREAU HAS NO OBJECTIONS TO THE | | | PROPOSED PROJECT. | | | | | | | | | 1. CONSTRUCTION, DEMOLITION, AND RENOVATION TO COMPLY | | | WITH NFPA 241. EXTRA ATTENTION SHALL BE GIVEN TO THE | | | PERMITTING AND LOCATION OF CONSTRUCTION TRAILERS. A | | | PERMIT IS REQUIRED FOR ANY CONSTRUCTION TRAILER RELATED | | | TO THIS PROJECT. SEPARATION DISTANCES FROM MAIN | | | STRUCTURES AS WELL AS OTHER TRAILERS SHALL BE CLOSELY | | | MONITORED FOR THE REQUIREMENTS OF FIRE SPRINKLER | | | PROTECTION. | | | | | | 2. SITE ACCESS AND EXIT POINTS ARE TO BE CLEARLY | | | IDENTIFIED AND MAINTAINED FOR EMERGENCY VEHICLES DURING | | | ALL CONSTRUCTION ACTIVITIES. | | | | | | 3. THE BUILDING ADDRESS SHALL BE CLEARLY VISIBLE FROM | | | ALL ACCESS ROADWAYS, INCLUDING DURING CONSTRUCTION. | | | ADDRESS NUMBERS SHALL CONTRAST WITH THEIR BACKGROUND | | | AND SHALL NOT BE LESS THAN SIX (6) INCHES IN HEIGHT | | | WITH A ONE (1) INCH STROKE FOR ALL BUILDINGS. | | | | | | 4. DURING CONSTRUCTION, TRASH AND DEBRIS IS TO BE | | | REMOVED FROM THE SITE DAILY OR MORE OFTEN TO REDUCE THE | | | ACCUMULATION OF POTENTIAL LIFE AND FIRE SAFETY HAZARDS. | | | | | | 5. THE CONSTRUCTION OF THE BUILDING SHALL COMPLY WITH | | | THE 5TH EDITION OF THE FLORIDA FIRE PREVENTION CODE, | | | INCLUDING NFPA 1 & 101, AND ALL ASSOCIATED FIRE CODES. | | | | | | FIRE SPRINKLER WORK SHALL COMPLY WITH THE REQUIREMENTS | | | OF NFPA 13, 2010 EDITION. | | | | | | FIRE ALARM WORK SHALL COMPLY WITH THE REQUIREMENTS OF | | | NFPA 72, 2010 EDITION. | | | | | | CONSTRUCTION WORK SHALL COMPLY WITH THE REQUIREMENTS OF | | | NFPA 241, 2009 EDITION. | | | | | | FIRE EXTINGUISHERS SHALL COMPLY WITH THE REQUIREMENTS | | | OF NFPA 10, 2010 EDITION. | | | | | | ELECTRIC WORK SHALL COMPLY WITH NFPA 70, 2011 EDITION. | | | | | | | | | 6. ALL PARKING STRUCTURES SHALL COMPLY WITH NFPA 88A, | | | PARKING STRUCTURES AND NFPA 101, THE LIFE SAFETY CODE, | | | INCLUDING MORE SPECIFICALLY, CHAPTER 42 STORAGE | | | OCCUPANCIES (PARKING STRUCTURES) | | | | | | 7. THE SEPARATION AND OPENING PROTECTION BETWEEN THE | | | PARKING GARAGE AND HOTEL SHALL BE IN ACCORDANCE AND | | | COMPLIANCE WITH THE SPECIFIC AND MOST STRINGENT | | | PROVISION REQUIREMENT OF EITHER CHAPTER. | | | | | | 8. A NFPA 13 COMPLAINT FIRE SPRINKLER SYSTEM AND NFPA | | | 14 COMPLIANT WET STANDPIPE SYSTEM ARE REQUIRED FOR THIS | | | STRUCTURE. TEMPORARY STANDPIPES ARE REQUIRED WHEN THE | | | BUILDING REACHES THREE LEVELS OR THIRTY FEET WHILE | | | BEING CONSTRUCTED. SEPARATE SHOP DRAWINGS, ARE REQUIRED | | | TO BE SUBMITTED, REVIEWED AND APPROVED BY THE FIRE | | | PREVENTION BUREAU PRIOR TO ANY INSTALLATION. | | | | | | PER NFPA 14 SECTION 7.12.2, HIGH-RISE BUILDINGS SHALL | | | HAVE AT LEAST TWO REMOTELY LOCATED FIRE DEPARTMENT | | | CONNECTIONS FOR EACH ZONE. | | | | | | DUE TO THE SIZE AND COMPLEXITY OF THE PROPOSED WATER | | | SUPPLY CALCULATIONS, HYDRANT LOCATIONS, FIRE PUMPS(S), | | | AND FIRE LOAD CALCULATIONS SHALL BE SUBMITTED TO ENSURE | | | ADAQUATE PROTECTION. | | | | | | FOR THE PROPOSED FIRE PUMP(S) , WHAT IS(ARE) THE | | | PRIMARY AND SECONDARY POWER SOURCES? | | | | | | 9. COMPLETE LIFE SAFETY PLANS FOR EACH OCCUPANCY SHALL | | | BE PROVIDED THAT ILLUSTRATE OCCUPANT LOADS, TRAVEL | | | DISTANCES, COMMON PATHS OF TRAVEL, DEAD-END CORRIDORS, | | | EXIT SIGNS, EMERGENCY LIGHTING, EXITS LEADING TO A | | | PUBLIC WAY, FIRE EXTINGUISHER LOCATIONS, AND ALL FIRE | | | SAFETY FEATURES AND EQUIPMENT. | | | | | | 10. ALL EXIT DISCHARGE LOCATIONS SHALL BE CLEARLY | | | ILLUSTRATED ON THE PLAN. | | | | | | 11. ALL ILLUMINATED EXIT SIGNS AND EMERGENCY LIGHTING | | | EQUIPMENT SHALL BE ILLUSTRATED ON THE PLAN. | | | | | | FOR THE PROSED EMERGENCY POWER GENERATOR(S), WHAT IS | | | (ARE) THE PRIMARY AND SECONDARY POWER SOURCES? | | | | | | 12. ALL ELEVATORS SHALL BE EQUIPPED WITH A REGION 7 | | | KEYWAY SYSTEM. | | | | | | ANY BUILDING THAT IS MORE THAN THREE STORIES HIGH OR IN | | | WHICH THE VERTICAL DISTANCE BETWEEN THE BOTTOM TERMINAL | | | LANDING AND THE TOP TERMINAL LANDING EXCEEDS 25 FEET | | | MUST BE CONSTRUCTED TO CONTAIN AT LEAST ONE PASSENGER | | | ELEVATOR THAT IS OPERATIONAL AND WILL ACCOMMODATE AN | | | AMBULANCE STRETCHER 76 INCHES LONG AND 24 INCHES WIDE | | | IN THE HORIZONTAL POSITION. | | | | | | 13. ALL EXISTING AND NEW FIRE HYDRANTS PLANNED FOR THIS | | | DEVELOPMENT SHALL BE CLEARLY INDICATED AND IDENTIFIED | | | ON THE PLAN AND CLOSELY COORDINATED WITH THE BUREAU OF | | | FIRE PREVENTION. | | | | | | 14. ALL FIRE DEPARTMENT SPRINKLER SYSTEM CONNECTIONS | | | (FDC,S) FOR THE PROJECT SHALL BE IDENTIFIED AND | | | COORDINATED WITH THE BUREAU OF FIRE PREVENTION. | | | | | | 15. ALL FIRE WATER MAINS, SIZES AND THEIR VALVE | | | ASSEMBLIES SHALL BE CLEARLY IDENTIFIED AND ILLUSTRATED | | | ON THE PLAN. | | | | | | 16. FOR EACH TOWER, THE FIRE COMMAND CENTER SHALL | | | COMPLY WITH NFPA 72 AND SHALL CONTAIN THE FOLLOWING | | | FEATURES: | | | | | | 1. SHALL BE A MINIMUM OF 96 FT SQUARED WITH A MINIMUM | | | DIMENSION OF 8 FT. | | | 2. THE FIRE DEPARTMENT COMMUNICATIONS SYSTEM. | | | 3. A TELEPHONE FOR FIRE DEPARTMENT USE WITH CONTROLLED | | | ACCESS TO THE PUBLIC TELEPHONE SYSTEM | | | 4. SCHEMATIC BUILDING PLANS INDICATING THE TYPICAL | | | FLOOR PLAN AND DETAILING THE BUILDING CORE, MEANS OF | | | EGRESS, FIRE PROTECTION SYSTEMS, FIRE-FIGHTING | | | EQUIPMENT AND FIRE DEPARTMENT ACCESS AND THE LOCATION | | | OF FIRE WALLS, FIRE BARRIERS, FIRE PARTITIONS, SMOKE | | | BARRIERS AND SMOKE PARTITIONS | | | 5. A WORK TABLE. | | | 6. IF APPLICABLE, A HAZARDOUS MATERIAL MANAGEMENT PLAN | | | FOR THE BUILDING. | | | 7. THE EMERGENCY VOICE/ALARM COMMUNICATION SYSTEM | | | CONTROL UNIT. | | | 8. ANNUNCIATOR UNIT VISUALLY INDICATING THE LOCATION OF | | | THE ELEVATORS AND WHETHER THEY ARE OPERATIONAL | | | 9. STATUS INDICATORS AND CONTROLS FOR AIR DISTRIBUTION | | | SYSTEMS. | | | 10. CONTROLS FOR UNLOCKING STAIRWAY DOORS | | | SIMULTANEOUSLY | | | 11. SPRINKLER VALVE AND WATER FLOW DETECTOR DISPLAY | | | PANELS | | | 12. EMERGENCY AND STANDBY POWER STATUS INDICATORS | | | 13. FIRE PUMP STATUS INDICATORS | | | 14. GENERATOR SUPERVISION DEVICES AND MANUAL START AND | | | TRANSFER FEATURES. | | | 15. PUBLIC ADDRESS SYSTEM, WHERE SPECIFICALLY REQUIRED | | | BY OTHER SECTIONS OF THIS CODE | | | 16. CONTROLS REQUIRED FOR SMOKE CONTROL | | | 17. ELEVATOR FIRE RECALL SWITCH IN ACCORDANCE WITH ASME | | | A17.1. | | | 18. ELEVATOR EMERGENCY OR STANDBY POWER SELECTOR | | | SWITCH(ES), WHERE EMERGENCY OR STANDBY POWER IS | | | PROVIDED | | | | | | 16. MAINTAIN A MINIMUM RADIO SIGNAL STRENGTH OF 102.0 | | | DBM FOR THE RADIO SYSTEM USED BY WEST PALM BEACH FIRE | | | RESCUE. IF THE MINIMUM CANNOT BE MAINTAINED, A | | | BI-DIRECTIONAL AMPLIFIED SYSTEM SHALL BE INSTALLED WITH | | | A MINIMUM 2-HOUR RUN TIME BATTERY BACK-UP. | | | | | | 17. THE BUREAU'S APPROVAL OF THIS SUBMITTED PROJECT | | | DOES NOT CONSTITUTE IT'S FINAL REVIEW OR APPROVAL. | | | | | | 18. THE BUREAU SHALL REVIEW ALL SUBMITTED BUILDING | | | PLANS AT THE APPROPRIATE TIME AND IN ACCORDANCE WITH | | | THE REQUIREMENTS OF ALL APPLICABLE CODES AND STANDARDS. | | | | | | | | | | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
3 |
Status |
F |
Date |
01-07-2016 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
01-07-2016 |
Time |
11:22 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
01-07-2016 |
Time |
11:22 |
Sent To |
|
|
| Notes |
| 2016-01-07 11:26:48 | PENDING FINAL CALCULATIONS OF PUBLIC AND PRIVATE OPEN | | | SPACE AND TREE GRATE ADJUSTMENTS. | | | | | | FROM: RAY CARANCI, LANDSCAPE PLANNER | | | PROJECT: 550 QUADRILLE RESUBMITTAL 1/7 | | | JANUARY 7, 2016 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | 1. SATISFIED. PLEASE PROVIDE AN OPEN SPACE DIAGRAM TO | | | SHOW QUALIFIED OPEN SPACE AREAS FOR: | | | ? PUBLIC OPEN SPACE: GARDEN PLAZA (LP-1). PLEASE | | | INCLUDE APPLICABLE AREAS WITH SQUARE FOOTAGE BROKEN | | | DOWN AS SEPARATE AREAS. | | | ? PRIVATE OPEN SPACE: TERRACE AND ROOFTOP GARDENS | | | (LP-2, 3 AND 4) | | | AREAS ON LEVELS 6 AND 8 ARE ROOFTOP GARDENS, NOT | | | TERRACES PER THE DEFINITIONS FOUND IN SECTION 94-109. | | | | | | 2. NOT SATISFIED. PLEASE PROVIDE A DIAGRAM AND | | | CALCULATIONS TO SHOW THE OPEN SPACE AREAS BY CATEGORY, | | | AND PERCENTAGE OF VEGETATED AREA AND TREE CANOPY TO | | | MEET THE REQUIREMENTS OF SECTION 94-109 TABLE IV-7. | | | PUBLIC OPEN SPACE GARDEN PLAZA REQUIRES 50% VEGETATED | | | AREA AND 50% TREE CANOPY AREA WITHIN THE OPEN SPACE. | | | AREAS OUTSIDE THE AREA OF THE INDIVIDUAL PLAZA DO NOT | | | APPLY. SEE FIGURE IV-18. THE CHART CAN BE CORRECTED TO | | | REFLECT THESE FIGURES AND INCLUDE THE PERCENTAGES. | | | 1/6/16 THE REQUIRED PUBLIC OPEN SPACE IS BEING MET WITH | | | THE SOUTHWEST PLAZA. THIS MAY BE A GARDEN PLAZA OR | | | PLAZA. THE AREA SPECIFICALLY COUNTED TO MEET THE | | | REQUIRED PUBLIC OPEN SPACE AS A PLAZA MUST ON ITS OWN | | | MEET THE REQUIRED 25%VEGETATED AREA, 10% MINIMUM | | | OVERHEAD COVER, AND 30% TREE CANOPY AREA. OTHER AREAS | | | SHOULD NOT BE SHOWN ON THE DIAGRAM. | | | | | | AREAS ON LEVELS 6 AND 8 ARE ROOFTOP GARDENS PER THE | | | DEFINITIONS FOUND IN SECTION 94-109, NOT TERRACES. THEY | | | REQUIRE 30% VEGETATED AREA AND 20% TREE CANOPY. SEE | | | FIGURE IV-23, AND AMEND THE OPEN SPACE CHART. | | | 1/6/16 THE OPEN SPACE DIAGRAM FOR THE PRIVATE OPEN | | | SPACE ROOFTOP GARDENS MUST BE INCLUDED AND DELINEATE | | | THE REQUIRED AREA, AND SHOW THE REQUIRED 30% VEGETATED | | | AREA AND 20% TREE CANOPY WITHIN THAT AREA. OTHER AREAS | | | SHOULD NOT BE SHOWN ON THE DIAGRAM. | | | | | | 3. SATISFIED. PLEASE SHOW THE CALCULATIONS FOR TREE | | | CANOPY BY SPECIES PER SECTION 94-109 TABLE IV-8. | | | | | | 1. SATISFIED. PLEASE PROVIDE WATER NEEDS CATEGORY FOR | | | EACH SPECIES ON THE PLANT LIST FROM THE SFWMD WATERWISE | | | GUIDE TO SHOW COMPLIANCE WITH THE FLORIDA FRIENDLY | | | LANDSCAPE CHART SECTION 94-446 (G). | | | | | | 4. SATISFIED. PLEASE PROVIDE A TREE SURVEY AND TREE | | | DISPOSITION PLAN INCLUDING THE CANOPY SIZES AND | | | INDICATING WHETHER THE EXISTING TREES AND PALMS WILL BE | | | PRESERVED, RELOCATED OR REMOVED. | | | | | | 5. SATISFIED. STREET TREES LOCATED IN A SIDEWALK THAT | | | IS ADJACENT TO A PERVIOUS LANDSCAPE AREA SHALL HAVE THE | | | STRUCTURAL SOIL EXTENDED UNDER THE SIDEWALK TO MEET THE | | | LANDSCAPE AREA IF THE DISTANCE BETWEEN THE 5 FOOT | | | REQUIRED STRUCTURAL SOIL AND THE LANDSCAPE AREA IS LESS | | | THAN 4 FEET. PLEASE SHOW THESE AREAS ON THE LANDSCAPE | | | PLAN. | | | | | | 6. SATISFIED. PLEASE SHOW SAFE SIGHT TRIANGLE AT | | | VEHICLE ENTRANCES AND EXITS. THE ENTRANCES NEED TO BE | | | ENGINEERED TO ALLOW ANY TREES AND SHRUBS AND | | | GROUNDCOVER TO BE PLANTED IN ANY LANDSCAPE AREAS | | | LOCATED ADJACENT TO THEM, AND STILL ALLOW SAFE SIGHT | | | TRIANGLES TO BE CLEAR. | | | | | | 7. SATISFIED. PLEASE INDICATE AND CLARIFY PLANTING | | | AREAS FOR THE TREES ALONG QUADRILLE AND 5TH STREET, AS | | | TREE GRATES AND STRUCTURAL SOIL IS NOT SHOWN. PLEASE | | | SHOW LOCATIONS OF STRUCTURAL SOIL ON SHEET LP-1, | | | EXTENDING 5 FEET IN ALL DIRECTIONS FROM THE TREE GRATE | | | EXCEPT THE CURB. | | | | | | ADDITIONAL COMMENTS 11/18/15: | | | 8. SATISFIED. SOME CORRECTIONS TO THE TREE MITIGATION | | | CHART ARE NEEDED. STAFF WOULD PREFER TO MEET WITH THE | | | APPLICANT TO IDENTIFY THESE ISSUES AND FACILITATE | | | CORRECTION. | | | | | | 9. SATISFIED. PLEASE ADD STREET TREES ALONG THE SOUTH | | | SIDE OF 5TH STREET. | | | | | | 10. SATISFIED. PLEASE EXPLAIN WHY THE 28TH FLOOR | | | TERRACE QUALIFIES AS PUBLIC OPEN SPACE. ALSO BREAK DOWN | | | PROVIDED OPEN SPACE CATEGORIES AND IDENTIFY ON THE | | | DIAGRAM. SOME AREAS ARE COUNTED AND OTHERS ARE NOT. | | | THIS JUST NEEDS TO BE CLARIFIED. AREA HAS BEEN REMOVED | | | FROM OPEN SPACE CALCULATIONS. | | | | | | 11. SATISFIED. PLEASE PROVIDE A DETAIL OF THE LIVING | | | WALL INCLUDING PLANTING DETAIL AND PLANT SPECIES. | | | | | | NOTE: TREE GRATES MAY BE DELETED ADJACENT TO SIDEWALK | | | PLANTING AREAS, AND GREEN ISLAND FICUS EXTENDED AROUND | | | TREES. NOT APPLICABLE TO AREAS ADJACENT TO ON STREET | | | PARKING. | | | | | | | | | | | | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | 2. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE | | | RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE | | | STREET TREES AND RIGHT OF WAY LANDSCAPING AND | | | IRRIGATION APPROVED WITH THIS PETITION. | | | 3. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE | | | RESPONSIBLE FOR THE MAINTENANCE OF THE ROAD RIGHT OF | | | WAY LANDSCAPING AND IRRIGATION. THIS WILL BE THROUGH A | | | SEPARATE MAINTENANCE AGREEMENT WITH THE CITY. | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
2 |
Status |
F |
Date |
11-19-2015 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
11-19-2015 |
Time |
13:01 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
11-19-2015 |
Time |
13:01 |
Sent To |
|
|
| Notes |
| 2015-11-19 13:04:00 | FROM: RAY CARANCI, LANDSCAPE PLANNER, 561-822-1462 | | | PROJECT: 550 QUADRILLE RESUBMITTAL 11/18 | | | NOVEMBER 18, 2015 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | 1. NOT SATISFIED. PLEASE PROVIDE AN OPEN SPACE DIAGRAM | | | TO SHOW QUALIFIED OPEN SPACE AREAS FOR: | | | ? PUBLIC OPEN SPACE: GARDEN PLAZA (LP-1). PLEASE | | | INCLUDE APPLICABLE AREAS WITH SQUARE FOOTAGE BROKEN | | | DOWN AS SEPARATE AREAS. | | | ? PRIVATE OPEN SPACE: TERRACE AND ROOFTOP GARDENS | | | (LP-2, 3 AND 4) | | | AREAS ON LEVELS 6 AND 8 ARE ROOFTOP GARDENS, NOT | | | TERRACES PER THE DEFINITIONS FOUND IN SECTION 94-109. | | | | | | 2. NOT SATISFIED. PLEASE PROVIDE A DIAGRAM AND | | | CALCULATIONS TO SHOW THE OPEN SPACE AREAS BY CATEGORY, | | | AND PERCENTAGE OF VEGETATED AREA AND TREE CANOPY TO | | | MEET THE REQUIREMENTS OF SECTION 94-109 TABLE IV-7. | | | PUBLIC OPEN SPACE GARDEN PLAZA REQUIRES 50%VEGETATED | | | AREA AND 50% TREE CANOPY AREA WITHIN THE OPEN SPACE. | | | AREAS OUTSIDE THE AREA OF THE INDIVIDUAL PLAZA DO NOT | | | APPLY. SEE FIGURE IV-18. THE CHART CAN BE CORRECTED TO | | | REFLECT THESE FIGURES AND INCLUDE THE PERCENTAGES. | | | AREAS ON LEVELS 6 AND 8 ARE ROOFTOP GARDENS PER THE | | | DEFINITIONS FOUND IN SECTION 94-109, NOT TERRACES. THEY | | | REQUIRE 30% VEGETATED AREA AND 20% TREE CANOPY. SEE | | | FIGURE IV-23, AND AMEND THE OPEN SPACE CHART. | | | | | | 3. SATISFIED. PLEASE SHOW THE CALCULATIONS FOR TREE | | | CANOPY BY SPECIES PER SECTION 94-109 TABLE IV-8. | | | | | | 1. SATISFIED. PLEASE PROVIDE WATER NEEDS CATEGORY FOR | | | EACH SPECIES ON THE PLANT LIST FROM THE SFWMD WATERWISE | | | GUIDE TO SHOW COMPLIANCE WITH THE FLORIDA FRIENDLY | | | LANDSCAPE CHART SECTION 94-446 (G). | | | | | | 4. SATISFIED. PLEASE PROVIDE A TREE SURVEY AND TREE | | | DISPOSITION PLAN INCLUDING THE CANOPY SIZES AND | | | INDICATING WHETHER THE EXISTING TREES AND PALMS WILL BE | | | PRESERVED, RELOCATED OR REMOVED. | | | | | | 5. ONGOING. STREET TREES LOCATED IN A SIDEWALK THAT IS | | | ADJACENT TO A PERVIOUS LANDSCAPE AREA SHALL HAVE THE | | | STRUCTURAL SOIL EXTENDED UNDER THE SIDEWALK TO MEET THE | | | LANDSCAPE AREA IF THE DISTANCE BETWEEN THE 5 FOOT | | | REQUIRED STRUCTURAL SOIL AND THE LANDSCAPE AREA IS LESS | | | THAN 4 FEET. PLEASE SHOW THESE AREAS ON THE LANDSCAPE | | | PLAN. | | | | | | 6. ONGOING. PLEASE SHOW SAFE SIGHT TRIANGLE AT VEHICLE | | | ENTRANCES AND EXITS. THE ENTRANCES NEED TO BE | | | ENGINEERED TO ALLOW ANY TREES AND SHRUBS AND | | | GROUNDCOVER TO BE PLANTED IN ANY LANDSCAPE AREAS | | | LOCATED ADJACENT TO THEM, AND STILL ALLOW SAFE SIGHT | | | TRIANGLES TO BE CLEAR. | | | | | | 7. NOT SATISFIED. PLEASE INDICATE AND CLARIFY PLANTING | | | AREAS FOR THE TREES ALONG QUADRILLE AND 5TH STREET, AS | | | TREE GRATES AND STRUCTURAL SOIL IS NOT SHOWN. PLEASE | | | SHOW LOCATIONS OF STRUCTURAL SOIL ON SHEET LP-1, | | | EXTENDING 5 FEET IN ALL DIRECTIONS FROM THE TREE GRATE | | | EXCEPT THE CURB. | | | | | | ADDITIONAL COMMENTS 11/18/15: | | | 8. SOME CORRECTIONS TO THE TREE MITIGATION CHART ARE | | | NEEDED. STAFF WOULD PREFER TO MEET WITH THE APPLICANT | | | TO IDENTIFY THESE ISSUES AND FACILITATE CORRECTION. | | | | | | 9. PLEASE ADD STREET TREES ALONG THE SOUTH SIDE OF 5TH | | | STREET. | | | | | | 10. PLEASE EXPLAIN WHY THE 28TH FLOOR TERRACE QUALIFIES | | | AS PUBLIC OPEN SPACE. ALSO BREAK DOWN PROVIDED OPEN | | | SPACE CATEGORIES AND IDENTIFY ON THE DIAGRAM. SOME | | | AREAS ARE COUNTED AND OTHERS ARE NOT. THIS JUST NEEDS | | | TO BE CLARIFIED. | | | 11. PLEASE PROVIDE A DETAIL OF THE LIVING WALL, | | | INCLUDING PLANTING DETAILS AND PLANT SPECIES. | | | | | | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | 2. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE | | | RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE | | | STREET TREES AND RIGHT OF WAY LANDSCAPING AND | | | IRRIGATION APPROVED WITH THIS PETITION. | | | 3. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE | | | RESPONSIBLE FOR THE MAINTENANCE OF THE ROAD RIGHT OF | | | WAY LANDSCAPING AND IRRIGATION. THIS WILL BE THROUGH A | | | SEPARATE MAINTENANCE AGREEMENT WITH THE CITY. | | | | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
1 |
Status |
F |
Date |
09-08-2015 |
|
|
Cont ID |
|
| Sent By |
rcaranci |
Date |
09-08-2015 |
Time |
12:00 |
Rev Time |
0.00 |
| Received By |
rcaranci |
Date |
09-08-2015 |
Time |
12:00 |
Sent To |
|
|
| Notes |
| 2015-09-08 12:01:35 | FROM: RAY CARANCI, LANDSCAPE PLANNER 561-822-1462 | | | PROJECT: 550 QUADRILLE | | | SEPTEMBER 8, 2015 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | 1. PLEASE PROVIDE AN OPEN SPACE DIAGRAM TO SHOW | | | QUALIFIED OPEN SPACE AREAS FOR: | | | ? PUBLIC OPEN SPACE: GARDEN PLAZA (LP-1) | | | ? PRIVATE OPEN SPACE: TERRACE AND ROOFTOP GARDENS | | | (LP-2, 3 AND 4) | | | | | | 2. PLEASE PROVIDE A DIAGRAM AND CALCULATIONS TO SHOW | | | THE OPEN SPACE AREAS BY CATEGORY, AND PERCENTAGE OF | | | VEGETATED AREA AND TREE CANOPY TO MEET THE REQUIREMENTS | | | OF SECTION 94-109 TABLE IV-7. | | | | | | 3. PLEASE SHOW THE CALCULATIONS FOR TREE CANOPY BY | | | SPECIES PER SECTION 94-109 TABLE IV-8. | | | | | | 1. PLEASE PROVIDE WATER NEEDS CATEGORY FOR EACH SPECIES | | | ON THE PLANT LIST FROM THE SFWMD WATERWISE GUIDE TO | | | SHOW COMPLIANCE WITH THE FLORIDA FRIENDLY LANDSCAPE | | | CHART SECTION 94-446 (G). | | | | | | 4. PLEASE PROVIDE A TREE SURVEY AND TREE DISPOSITION | | | PLAN INCLUDING THE CANOPY SIZES AND INDICATING WHETHER | | | THE EXISTING TREES AND PALMS WILL BE PRESERVED, | | | RELOCATED OR REMOVED. | | | | | | 5. STREET TREES LOCATED IN A SIDEWALK THAT IS ADJACENT | | | TO A PERVIOUS LANDSCAPE AREA SHALL HAVE THE STRUCTURAL | | | SOIL EXTENDED UNDER THE SIDEWALK TO MEET THE LANDSCAPE | | | AREA IF THE DISTANCE BETWEEN THE 5 FOOT REQUIRED | | | STRUCTURAL SOIL AND THE LANDSCAPE AREA IS LESS THAN 4 | | | FEET. PLEASE SHOW THESE AREAS ON THE LANDSCAPE PLAN. | | | | | | 6. PLEASE SHOW SAFE SIGHT TRIANGLE AT VEHICLE ENTRANCES | | | AND EXITS. THE ENTRANCES NEED TO BE ENGINEERED TO ALLOW | | | ANY TREES AND SHRUBS AND GROUNDCOVER TO BE PLANTED IN | | | ANY LANDSCAPE AREAS LOCATED ADJACENT TO THEM, AND STILL | | | ALLOW SAFE SIGHT TRIANGLES TO BE CLEAR. | | | | | | 7. PLEASE INDICATE AND CLARIFY PLANTING AREAS FOR THE | | | TREES ALONG QUADRILLE AND 5TH STREET, AS TREE GRATES | | | AND STRUCTURAL SOIL IS NOT SHOWN. | | | | | | | | | | | | | | | CONDITIONS OF APPROVAL | | | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON | | | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE | | | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT | | | SERVICES DEPARTMENT, PLANNING DIVISION. | | | 2. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE | | | RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE | | | STREET TREES AND RIGHT OF WAY LANDSCAPING AND | | | IRRIGATION APPROVED WITH THIS PETITION. | | | 3. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE | | | RESPONSIBLE FOR THE MAINTENANCE OF THE ROAD RIGHT OF | | | WAY LANDSCAPING AND IRRIGATION. THIS WILL BE THROUGH A | | | SEPARATE MAINTENANCE AGREEMENT WITH THE CITY. | | | | | | |
|
|
| Review Stop |
PARK |
PARKING |
| Rev No |
1 |
Status |
F |
Date |
09-11-2015 |
|
|
Cont ID |
|
| Sent By |
ssamuels |
Date |
09-11-2015 |
Time |
12:50 |
Rev Time |
0.00 |
| Received By |
ssamuels |
Date |
09-11-2015 |
Time |
12:50 |
Sent To |
|
|
| Notes |
| 2015-09-11 12:57:25 | SEAN SAMUELS | | | PARKING DEPARTMENT | | | 561-822-1507 | | | Z - 15080039 | | | | | | PLEASE PROVIDE NUMBER OF HANDICAP SPACES NEEDED FOR THE | | | PROJECT. | | | PARKING SPECIFICATION IS REQUIRED PER CITY OF WEST PALM | | | BEACH CODE. | | | ON - STREET METERS REMOVAL COST DETAIL : | | | | | | CITY OF WEST PALM BEACH | | | PARKING ADMINISTRATION DEPARTMENT | | | 500 BANYAN BLVD., | | | WEST PALM BEACH | | | FL, 33401 | | | | | | METER AND METER HOOD | | | | | | REMOVAL OF ON ? STREET METERED PARKING SPACE OR SPACES, | | | WILL COST A FEE AS ESTABLISH BY THE PARKING | | | ADMINISTRATOR. ALL PAYMENT WILL BE REQUIRED TO BE MADE | | | TO THE PARKING DEPARTMENT. | | | | | | FEE: | | | | | | METER PERMANENT REMOVED - COST - $16,800 PER METER | | | | | | METER TEMPORARY REMOVED - COST - $100 PER REMOVE / | | | REPLACED | | | | | | METER HOOD RENTAL PER ZONE | | | | | | ZONE A ------------------------ $350 PER MONTH / PER | | | METER | | | | | | ZONE B ________________ $250 PER MONTH / PER METER | | | | | | ZONE C ------------------------ $ 150 PER MONTH / PER | | | METER | | | | | | METER HOOD RENTAL PER DAY | | | | | | ZONE A ------------------------ $20 PER DAY / PER METER | | | (INCLUDED SUNDAY AND HOLIDAY) | | | | | | ZONE B ________________ $ 15 PER MONTH / PER METER | | | | | | ZONE C ------------------------ $ 10 PER MONTH / PER | | | METER | | | | | | |
|
|
| Review Stop |
POLICE |
POLICE |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
PU |
PUBLIC UTILITIES |
| Rev No |
1 |
Status |
P |
Date |
06-28-2016 |
|
|
Cont ID |
|
| Sent By |
lle |
Date |
06-28-2016 |
Time |
12:55 |
Rev Time |
0.00 |
| Received By |
lle |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2016-06-28 07:56:29 | THIS IS A CONCEPTUAL LEVEL REVIEW OF WATER AND SEWER | | | PLANS. ADDITIONAL COMMENTS ARE EXPECTED WHEN FULL | | | DRAWINGS ARE SUBMITTED FOR ENGINEERING DEVELOPMENT | | | APPROVAL. THE FOLLOWING COMMENTS INCLUDE THOSE | | | DISCUSSED AT THE JUNE 6, 2016 PRE-ENGINEERING | | | COORDINATION MEETING: | | | | | | PASSED WITH CONDITIONS FOR FOUNDATION PERMIT, SEE | | | BELOW: | | | | | | 1. PLEASE FIELD VERIFIY ALL WATER AND SEWER SERVICES | | | PRIOR TO DEMOLITION. CUT AND CAP ALL INACTIVE SERVICES | | | AND MAINS AT THE PROPERTY LINE FOR DEMOLITION PHASE. | | | PERMANENT ABANDONMENT ARE TO BE CUT AND CAP AT THE | | | MAINS. INACTIVE PIPELINES LARGER THAN 2" DIAMETER WILL | | | BE REMOVED. | | | 2. PLEASE PROVIDE CCTV OF THE EXIST SANITARY SEWER ON | | | 5TH STREET | | | 3. THERE ARE ACTIVE WATER SERVICE CONNECTIONS ON THE | | | NORTH SIDE OF 5TH STREET. THE EXISTING WATER MAIN ON | | | 5TH STREET IS TO BE REMAINED ACTIVE UNTIL THE NEW | | | 12-INCH WATER MAIN IS ACTIVATED AND RELEASED FOR NEW | | | CONNECTIONS. | | | | | | GENERAL: | | | 1. RESEARCH AND OBTAIN ALL UTILITY FRANCHISE | | | INFORRMATION WITHIN PROJECT LIMITS. | | | 2. PLEASE ADD EXISTING DRAINAGE INFORMATION. | | | 3. PLEASE SHOW ALL EXISTING UTILITIES (SERVICES AND | | | MAIN LINES), CONFLICTS, AND CROSSINGS. | | | 4. OBTAIN SOFTDIGS TO CONFIRM VERTIVAL AND HORIZONTAL | | | CLEARANCE AT UTILITY CROSSINGS BETWEEN PROPOSED AND | | | EXISTING UTILITIES. | | | 5. PLEASE PROVIDE MEP CALCULATION (AVERAGE AND PEAK) TO | | | SUPPORT METER SIZE SELECTION. PLEASE PROVIDE FIRE | | | DEMAND. | | | 6. PLEASE PROVIDE WASTEWATER DEMAND (AVERAGE AND PEAK). | | | 7. PLEASE CALL OUT THE POINT OF SERVICE (WATER AND | | | SEWER). | | | 8. PLEASE PROVIDE FIRE HYDRANT FLOW TEST DATA USED FOR | | | DESIGN. | | | 9. PLEASE PROVIDE 5 FEET MINIMUM HORIZONTAL SEPARATION | | | BETWEEN PROPOSED PIPELINES/STRUCTURES AND EXISTING | | | WATER AND SEWER MAINS TO FACILITATE FURTURE | | | MAINTENANCE/REPAIRS. | | | 10. PLEASE CALL OUT PRIVATE FACILITIES (FIRE HYDRANTS, | | | ETC.), IF APPLICABLE. | | | 11. PLEASE MOVE THE PROPOSED DDCV, REDUCER ASSEMBLY, | | | AND METER VAULT ADJACENT TO THE ROADWAY R/W. | | | 12. PLEASE MOVE THE PROPOSED CLEAN-OUTS ADJACENT TO THE | | | ROADWAY R/W. | | | 13. PLEASE PROVIDE ENGINEERING CALCULATION FOR THE | | | PROPOSED 12-INCH WM SIZING ON 5TH STREET. THE CITY'S | | | SPECS CALLS FOR THE USE OF GATE VALVE, NOT BUTTERFLY | | | VALVE. | | | 14. PLEASE PROVIDE ENGINEERING CALCULATION FOR THE | | | PROPOSED 10-INCH GRAVITY MAIN SIZING ON 5TH STREET. | | | 15. PLEASE ADD THE PROFILE FOR THE PROPOSED 12-INCH | | | WATER AND 10-INCH SANITARY SEWER MAINS ON 5TH STREET. | | | 16. CCTV RECORD (VIDEO AND TV LOG) OF THE PROPOSED SAN | | | SEWER MAIN (FULLLENGTH FROMMH TO MH) AND SERVICES | | | WITHIN THE ROADWAY R/W WILL BE REQUIRED AS PART OF THE | | | PROJECT CLOSE-OUT SUBMITTAL. | | | 17. PLEASE INCLUDE APPLICABLE CITY OF WEST PALM BEACH | | | STANDARD WATER AND SEWER DETAILS TO THE DETAILS SHEET | | | (PIPE THRUST RESTRAINTTABLE, ETC). CONTACT THE | | | ENGINEERING SERVICES DEPARTMENT (561) 494-1040 FOR THE | | | LATEST REVISED DETAILS. | | | 18. THE CITY IS EVALUATING IMPACTS TO THE WATER AND | | | SEWER SYSTEMS DUE TO INCREASED DEMAND. | | | | | | LAURA LE | | | PUBLIC UTILITIES ENGINEER | | | 561-494-1093 | | | [email protected] |
|
|
| Review Stop |
PW |
PUBLIC WORKS |
| Rev No |
1 |
Status |
F |
Date |
09-08-2015 |
|
|
Cont ID |
|
| Sent By |
cranford |
Date |
09-08-2015 |
Time |
13:54 |
Rev Time |
0.00 |
| Received By |
cranford |
Date |
09-08-2015 |
Time |
13:54 |
Sent To |
|
|
| Notes |
| 2015-09-08 13:54:05 | SEE COMMENTS UNDER ENG PPRC. |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
1 |
Status |
P |
Date |
09-08-2015 |
|
|
Cont ID |
|
| Sent By |
cranford |
Date |
09-08-2015 |
Time |
13:54 |
Rev Time |
0.00 |
| Received By |
cranford |
Date |
09-08-2015 |
Time |
13:54 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
1 |
Status |
P |
Date |
09-08-2015 |
|
|
Cont ID |
|
| Sent By |
cranford |
Date |
09-08-2015 |
Time |
13:55 |
Rev Time |
0.00 |
| Received By |
cranford |
Date |
09-08-2015 |
Time |
13:55 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
3 |
Status |
P |
Date |
12-11-2015 |
|
|
Cont ID |
|
| Sent By |
|
Date |
12-11-2015 |
Time |
|
Rev Time |
0.00 |
| Received By |
bcollins |
Date |
12-11-2015 |
Time |
12:59 |
Sent To |
|
|
| Notes |
| 2015-12-11 12:57:51 | PASSED SUBJECT TO RIGHT TURN LANE AT SITE ENTRANCE ON | | | QUADRILLE AND SIGNAL WARRANT STUDY AT 4TH/QUADRILLE | | | | | | | | | 1.DATA INDICATES THAT A NORTHBOUND RIGHT TURN LANE ON | | | QUADRILLE AT 4TH STREET IS WARRANTED. HOWEVER, THERE IS | | | INADEQUATE RIGHT OF WAY TO CONSTRUCT THIS LANE. | | | 2. A RIGHT TURN LANE IS NEEDED AT THE SITE ENTRANCE ON | | | QUADRILLE. | | | 3. BASED ON THE TRAFFIC DATA, THE LEFT TURN MOVEMENT | | | FROM 4TH STREET TO SOUTHBOUND QUADRILLE MAY EXPERIENCE | | | SIGNIFICANT DELAYS IN THE PM PEAK. A SIGNAL WARRANT | | | ANALYSIS SHOULD BE PERFORMED AT THIS LOCATION. SIGHT | | | DISTANCE FROM 4TH STREET TO THE NORTH ON QUADRILLE | | | SHOULD BE MEASURED AS PART OF THE ANALYSIS AS THE ROAD | | | CURVES JUST NORTH OF 4TH STREET.. | | | |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
2 |
Status |
F |
Date |
11-17-2015 |
|
|
Cont ID |
|
| Sent By |
|
Date |
11-17-2015 |
Time |
|
Rev Time |
0.00 |
| Received By |
bcollins |
Date |
11-17-2015 |
Time |
13:40 |
Sent To |
|
|
| Notes |
| 2015-11-17 14:01:36 | SUBMITTED TRAFFIC GENERATION STATEMENT ADDRESSES PB | | | COUNTY CONCURRENCY REQUIREMENTS, BUT DOES NOT EVALUATE | | | KEY INTERSECTIONS ADJACENT TO THE PROPERTY - | | | QUADRILLE/DIXIE, QUADRILLE/4TH, DIXIE/4TH, | | | QUADRILLE/SITE ENTRANCE. THE IMPACT OF APPROVED | | | DEVELOPMENTS THAT WOULD IMPACT THIS AREA NEEDS TO BE | | | INCLUDED. IT SHOULD BE NOTED THAT THIS SITE IS | | | PROJECTED TO GENERATE OVER 6,000 VEHICLES/DAY, AND 725 | | | PM PEAK HOUR TRIPS. A TRAFFIC IMPACT STUDY, SIMILAR TO | | | STUDIES PREPARED FOR NEARBY PROJECTS, NEEDS TO BE | | | SUBMITTED. |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
1 |
Status |
F |
Date |
09-08-2015 |
|
|
Cont ID |
|
| Sent By |
cranford |
Date |
09-08-2015 |
Time |
13:55 |
Rev Time |
0.00 |
| Received By |
cranford |
Date |
09-08-2015 |
Time |
13:55 |
Sent To |
|
|
| Notes |
| 2015-09-08 13:55:22 | SEE COMMENTS UNDER ENG PPRC. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
F |
Date |
11-19-2015 |
|
|
Cont ID |
|
| Sent By |
aaponte |
Date |
11-19-2015 |
Time |
11:40 |
Rev Time |
0.00 |
| Received By |
aaponte |
Date |
10-28-2015 |
Time |
10:39 |
Sent To |
|
|
| Notes |
| 2015-11-19 11:40:10 | 2ND REVIEW - ISSUED 11/19/15 | | | 1. ACTIVE USES ARE REQUIRED ALONG DIXIE HWAY AND | | | QUADRILLE BOULEVARD. NUMBERS ON TABLE DO NOT MATCH | | | DIAGRAMS. WHAT ARE THE USES PROPOSED ON LINER AREAS | | | ABOVE FIRST FLOOR? ACTIVE USES ON QUADRILLE ARE NOT | | | SHOWN ON FLOOR PLANS. NOT SATISFIED- THE PERCENTAGE OF | | | ACTIVE USES ON QUADRILLE BLVD. (FLOORS 1-5), AND DIXIE | | | HWAY (FLOORS 2-5) DO NOT COMPLY WITH THE CODE. ACTIVE | | | USES ARE MEASURED AS A PERCENTAGE OF THE BUILDABLE | | | FRONTAGE, AND BUILDABLE FRONTAGE IS THE LINE GENERALLY | | | PARALLEL TO THE ROAD. THE BUILDING IS DESIGNED WITH | | | BUILDING FRONTAGES THAT ARE NOT PARALLEL TO THE ROAD, | | | BUT THE PERCENTAGE SHALL BE CALCULATED PARALLEL AND THE | | | BUILDING FRONTAGE MEASUREMENT SHALL BE EXTENDED FOR THE | | | PURPOSES OF CALCULATING THE COMPLIANCE WITH THE CODE. | | | 2. PROPOSED DROP-OFF AREA ALONG DIXIE HWAY IS | | | NEGATIVELY IMPACTING THE PEDESTRIAN ENVIRONMENT ALONG | | | DIXIE HWAY. ACTIVE USES SHALL BE PLACED DIRECTLY ON THE | | | BUILDING FRONTAGE AND NOT BEHIND A DROP-OFF AREA.- | | | SATISFIED. | | | 3. REQUIRED PUBLIC OPEN SPACE SHALL BE PROVIDED | | | ADJACENT TO A BUILDING ENTRANCE AND CONSOLIDATED INTO | | | ONE SINGLE SPACE. OPEN SPACE SHOWN ON SHEET AO.O1 DOES | | | NOT QUALIFY AS OPEN SPACE. - SATISFIED- PLEASE ADJUST | | | CURRENT GRAPHIC TO IDENTIFY PROPOSED PLAZA AT QUADRILLE | | | BLVD AND 4TH ST. AS THE REQUIRED PUBLIC OPEN SPACE. SEE | | | LANDSCAPE COMMENTS FOR MORE DETAIL ON SPECIFIC | | | CALCULATIONS. | | | 4. PLEASE CONFIRM COMPLIANCE WITH CONDITIONAL SETBACKS | | | ALONG QUADRILLE BLVD AND DIXIE HWAY. CONDITIONAL | | | SETBACK ABOVE 3RD FLOOR (50?) IS 31' FOR AVENUES AND | | | 27' FOR DIXIE HWAY AND SECONDARY STREETS. AN ADDITIONAL | | | 66' SETBACK IS REQUIRED ABOVE 7TH FLOOR (110') ON DIXIE | | | HWAY. NOT SATISFIED - THE CONDITIONAL SETBACKS FOR | | | DIXIE HWAY AND 4TH STREET ARE SATISFIED. THE | | | CONDITIONAL SETBACK FOR QUADRILLE BLVD IS NOT SATISFIED | | | AS THE SETBACK SHALL BE MEASURED FROM THE BACK OF THE | | | NEW DECELERATION LANE. ASSOCIATED WITH THIS COMMENT IS | | | THE NON-COMPLIANCE FOR THE ACTIVE USE REQUIREMENT ALONG | | | QUADRILLE BLVD. IF THE QUADRILLE BLVD FRONTAGE COMPLIES | | | WITH THE ACTIVE USE PERCENTAGE THE CONDITIONAL SETBACK | | | IS NOT APPLICABLE AS THE BUILDING SETBACKS MORE THAN | | | THE 31? ON THE NORTHERN PORTION. | | | 5. STREETSCAPE DESIGN ALONG QUADRILLE BOULEVARD SHALL | | | BE CONSISTENT WITH THE SOUTH CORRIDOR. FURTHER | | | DISCUSSION NECESSARY. - SATISFIED - PLEASE PROVIDE A | | | HARDSCAPE DRAWING. IT IS DIFFICULT TO IDENTIFY THE | | | SIDEWALK LOCATION IN THE LANDSCAPE DRAWINGS. | | | 6. PLEASE INDICATE EXISTING ON-STREET PARKING AND | | | PROPOSED RECONFIGURATION. - SATISFIED - 12 SPACES ARE | | | REMOVED AND APPLICANT WILL NEGOTIATE PAYMENT DURING | | | BUILDING PERMIT PROCESS. | | | 7. PLEASE INCLUDE INFORMATION TO CONFIRM COMPLIANCE | | | WITH AVERAGE AND MINIMUM UNIT SIZE. - SATISFIED - | | | PLEASE ADD SF FOR EACH UNIT AND AVERAGE UNIT SIZE FOR | | | THE PROJECT TO THE TABLE ON SHEET A0.05. | | | 8. ADDITIONAL COMMENTS: | | | A. INDICATE EXISTING CURB LINE, PROPOSED CURB LINE IF | | | CHANGED, AND SETBACK LINE IN ALL FLOOR PLANS AND | | | ELEVATIONS. NOT SATISFIED - SHEET 5 ON CIVIL DRAWINGS | | | INDICATES THE CURB ON THE WESTERN PORTION OF 4TH STREET | | | IS MOVED SOUTH. THE CENTER LINE IS ALSO MOVE AND THE | | | RESULTING EASTBOUND TRAVEL LANE IS ONLY 9-. PLEASE | | | DISCUSS WITH THE TRAFFIC ENGINEER. | | | B. PLEASE CREATE AN FAR TABLE, INCLUDE THE AMOUNT OF | | | TDRS ALREADY ON SITE. NOT SATISFIED- PLEASE INCLUDE IN | | | THE FAR CALCULATION THE AMOUNT OF TDR CURRENTLY | | | EXISTING IN THE SITE AND INDICATE THE RESULTING TDRS | | | LEFT FOR RE-TRANSFER. TDRS ALREADY TRANSFERRED TO THE | | | SITE ? 416,636SF. PROPOSED GSF =794,511SF. TDRS NEEDED | | | = 383,655SF. TDRS LEFT FOR RE-TRANSFER = 32,981SF. | | | C. PLEASE PROVIDE MORE DETAIL INFORMATION ON GREEN WALL | | | TREATMENT FOR PARKING GARAGE. -NOT SATISFIED - PARKING | | | FLOOR PLANS DO NOT SHOW ANY SPACE DEDICATED FOR | | | PLANTERS TO GROW ANY LIVE MATERIAL. IF THE GROWING | | | MEDIUM IS CONTAINED IN THE SCREENING SYSTEM PLEASE | | | PROVIDE DETAILS ON THE PROPOSED SYSTEM, INCLUDING | | | IRRIGATION SYSTEM. LANDSCAPE DRAWINGS DO NOT INCLUDE | | | ANY INFORMATION ON PROPOSED PLANT MATERIAL FOR THE | | | PARKING SCREENING. | | | 9. FOR DAC SPECIAL REVIEW: | | | A. DETAILED COLORED ELEVATION WITH CALL OUT MATERIALS | | | AND PICTURES OF REFERENCES WILL BE NEEDED. SATISFIED. | | | B. FOR DAC SPECIAL REVIEW, STREET ELEVATIONS WITH | | | BUILDING INSERTED IN CONTEXT WILL BE NEEDED. | | | RELATIONSHIP WITH HISTORIC BUILDINGS ON NORTH SIDE OF | | | PROPERTY. NOT SATISFIED- PLEASE VERIFY THE ADJACENT | | | BUILDINGS ARE DEPICTED ACCURATELY. THE EXISTING | | | COURTHOUSE BUILDING IS APROX. 154' IN HEIGHT (EMPORIUS | | | WEB SITE)BUT IT IS SHOWN IN THE CONTEXTUAL ELEVATION AT | | | LEVEL 8 (92'). | | | C. STREET LEVEL RENDERINGS. SATISFIED. | | | 10. CURB CUTS ARE SHOWN ON CIVIL DRAWING SHEET 5 WITH A | | | GRADE DIFFERENCE TO THE SIDEWALK. PLEASE ADJUST TO | | | ENSURE THE SIDEWALK LEVEL IS MAINTAINED AT THE CURB CUT | | | CROSSINGS. ADJUST THE DETAIL ON SHEET 7 IF NECESSARY. | | | 11. SHEET 9 ON CIVIL DRAWINGS INDICATE A GRADE | | | DIFFERENCE BETWEEN THE CURB AND THE BUILDING FRONTAGE | | | ON DIXIE AND 4TH STREET THAT REQUIRED STEPS. THOSE | | | STEPS ARE NOT INDICATED IN ANY OTHER DRAWINGS (FLOOR | | | PLANS OR LANDSCAPE) PLEASE INDICATE HOW THAT GRADE | | | DIFFERENCE IS TREATED. THE STEPS SHALL NOT BE LOCATED | | | WITHIN THE MINIMUM REQUIRED SETBACK AREA. PLEASE | | | PROVIDE A HARDSCAPE PLAN. | | | 12. PLEASE CONFIRM THE PROPOSED RELOCATION OF THE BUS | | | SHELTER ADJACENT TO THE DECELERATION LANE IS ACCEPTABLE | | | BY PALM TRAN. | | | 13. DIXIE HWAY ELEVATION DOES NOT INDICATE THE | | | EXISTENCE OF ANY ACTIVE USES ABOVE THE 2ND STORY AS IT | | | IS SHOWN IN THE FLOOR PLANS. PLEASE CONFIRM VIABILITY | | | OF PROPOSED USE ACCESSIBLE EXCLUSIVELY THROUGH THE | | | PARKING GARAGE. | | | 14. 5TH STREET SHALL INCLUDE STREET TREES ALONG THE | | | CURB LINE ON THE SOUTH SIDE AND IF POSSIBLE ON THE | | | NORTH SIDE. | | | | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
09-09-2015 |
|
|
Cont ID |
|
| Sent By |
aaponte |
Date |
09-09-2015 |
Time |
13:16 |
Rev Time |
0.00 |
| Received By |
aaponte |
Date |
09-09-2015 |
Time |
13:16 |
Sent To |
|
|
| Notes |
| 2015-09-09 13:17:02 | - ACTIVE USES ARE REQUIRED ALONG DIXIE HWAY AND | | | QUADRILLE BOULEVARD. NUMBERS ON TABLE DO NOT MATCH | | | DIAGRAMS. WHAT ARE THE USES PROPOSED ON LINER AREAS | | | ABOVE FIRST FLOOR? ACTIVE USES ON QUADRILLE ARE NOT | | | SHOWN ON FLOOR PLANS. | | | - PROPOSED DROP-OFF AREA ALONG DIXIE HWAY IS NEGATIVELY | | | IMPACTING THE PEDESTRIAN ENVIRONMENT ALONG DIXIE HWAY. | | | ACTIVE USES SHALL BE PLACED DIRECTLY ON THE BUILDING | | | FRONTAGE AND NOT BEHIND A DROP-OFF AREA. | | | - REQUIRED PUBLIC OPEN SPACE SHALL BE PROVIDED ADJACENT | | | TO A BUILDING ENTRANCE AND CONSOLIDATED INTO ONE SINGLE | | | SPACE. OPEN SPACE SHOWN ON SHEET AO.O1 DOES NOT QUALIFY | | | AS OPEN SPACE. | | | - PLEASE CONFIRM COMPLIANCE WITH CONDITIONAL SETBACKS | | | ALONG QUADRILLE BLVD AND DIXIE HWAY. CONDITIONAL | | | SETBACK ABOVE 3RD FLOOR (50?) IS 31 FOR AVENUES AND 27? | | | FOR DIXIE HWAY AND SECONDARY STREETS. AN ADDITIONAL 66? | | | SETBACK IS REQUIRED ABOVE 7TH FLOOR (110?) ON DIXIE | | | HWAY. | | | - STREETSCAPE DESIGN ALONG QUADRILLE BOULEVARD SHALL BE | | | CONSISTENT WITH THE SOUTH CORRIDOR. FURTHER DISCUSSION | | | NECESSARY. | | | - PLEASE INDICATE EXISTING ON-STREET PARKING AND | | | PROPOSED RECONFIGURATION. | | | - PLEASE INCLUDE INFORMATION TO CONFIRM COMPLIANCE WITH | | | AVERAGE AND MINIMUM UNIT SIZE. | | | ADDITIONAL COMMENTS: | | | - INDICATE EXISTING CURB LINE, PROPOSED CURB LINE IF | | | CHANGED, AND SETBACK LINE IN ALL FLOOR PLANS AND | | | ELEVATIONS. | | | - PLEASE CREATE AN FAR TABLE, INCLUDE THE AMOUNT OF | | | TDRS ALREADY ON SITE. | | | - PLEAS PROVIDE MORE DETAIL INFORMATION ON GREEN WALL | | | TREATMENT FOR PARKING GARAGE. | | | - FOR DAC SPECIAL REVIEW: | | | O DETAILED COLORED ELEVATION WITH CALL OUT MATERIALS | | | AND PICTURES OF REFERENCES WILL BE NEEDED. | | | O FOR DAC SPECIAL REVIEW, STREET ELEVATIONS WITH | | | BUILDING INSERTED IN CONTEXT WILL BE NEEDED. | | | RELATIONSHIP WITH HISTORIC BUILDINGS ON NORTH SIDE OF | | | PROPERTY. | | | O STREET LEVEL RENDERINGS. | | | |
|
|
| |
Print |
|