Plan Review Details - Project Z15070007
| Plan Review Stops For Project Z15070007 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
PARK |
PARKING |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
POLICE |
POLICE |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
PW |
PUBLIC WORKS |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
07-29-2015 |
|
|
Cont ID |
|
| Sent By |
aaponte |
Date |
07-29-2015 |
Time |
10:16 |
Rev Time |
0.00 |
| Received By |
aaponte |
Date |
07-01-2015 |
Time |
10:16 |
Sent To |
|
|
| Notes |
| 2015-07-29 12:25:59 | 1. PLEASE VERIFY THE RETAIL SQUARE FOOTAGE IS ACCURATE. | | | PREVIOUS APPROVAL HAD 9,991 SF OF RETAIL. REVISED PLAN | | | IS REPLACING THE PREVIOUS TOWNHOUSES FOR RETAIL SPACE | | | BUT THE TOTAL SQUARE FOOTAGE IS LESS THAN BEFORE. | | | 2. PLEASE LOOK AT THE TRANSPARENCY OF THE LOBBY AREA. | | | PROPOSED LOBBY NOW HAS A SOLID WALL. | | | 3. ADDITIONAL PEDESTRIAN ENTRANCE ON DATURA STREET IS | | | SETBACK BEYOND THE MAXIMUM SETBACK ALLOWED. | | | 4. PLEASE PROVIDE A LETTER WITH A SUMMARY OF THE | | | PROPOSED CHANGES. LIST ORIGINAL SQUARE FOOTAGE AND | | | REVISED, ORIGNAL PARKING CALCULATIONS AND REVISED. | | | 5. MINIMUM HORIZONTAL PROJECTION FOR A CANOPY IS 8 | | | FEET. | | | 6. NOW THAT THE TOWNHOUSES HAVE BEEN CONVERTED INTO | | | HOTEL USES, STAFF RECOMMENDS THE DROP OFF AREA TO BE | | | FURTHER INTEGRATED INTO THE BUILDING DESIGN. | | | 7. PLEASE PROVIDE COLORED ELEVATIONS WITH MATERIALS | | | CALLED-OUT. | | | 8. SIGNAGE IS LARGER THAN PERMITTED BY CODE. PLEASE | | | INDICATE LOCATION OF RETAIL SIGNAGE. | | | |
|
|
| |