| Plan Review Stops For Project Z14090006 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
10-07-2014 |
|
|
Cont ID |
|
| Sent By |
rbrown |
Date |
10-07-2014 |
Time |
20:02 |
Rev Time |
0.00 |
| Received By |
rbrown |
Date |
10-07-2014 |
Time |
20:02 |
Sent To |
|
|
| Notes |
| 2014-10-07 20:02:47 | DEVELOPMENT SERVICES DEPARTMENT, BUILDING DIVISION, | | | COMMENTS: | | | | | | NO COMMENTS ON PROPOSED MINOR AMENDMENT. |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
1 |
Status |
P |
Date |
10-06-2014 |
|
|
Cont ID |
|
| Sent By |
cranford |
Date |
10-06-2014 |
Time |
12:56 |
Rev Time |
0.00 |
| Received By |
cranford |
Date |
10-06-2014 |
Time |
12:55 |
Sent To |
|
|
| Notes |
| 2014-10-06 12:56:22 | ENGINEERING/PUBLIC WORKS DEPT. | | | LAND DEVELOPMENT AND STORMWATER | | | | | | NO OBJECTIONS TO THE LOBBY MODIFICATION. | | | | | | KELLY CRANFORD, P.E. | | | LAND DEVELOPMENT ENGINEER | | | ENGINEERING & PUBLIC WORKS DEPARTMENT | | | CITY OF WEST PALM BEACH | | | [email protected] | | | 561-494-1098 (OFFICE) | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
11-10-2014 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
11-10-2014 |
Time |
14:54 |
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
11-10-2014 |
Time |
14:54 |
Sent To |
|
|
| Notes |
| 2014-11-10 14:55:07 | THE PREVIOUSLY SUBMITTED FIRE PREVENTION BUREAU | | | COMMENTS HAVE BEEN ADDRESSED. | | | | | | THE BUREAU'S APPROVAL OF THIS SUBMITTED PROJECT DOES | | | NOT CONSTITUTE IT'S FINAL REVIEW OR APPROVAL. | | | | | | THE BUREAU SHALL REVIEW ALL SUBMITTED BUILDING PLANS AT | | | THE APPROPRIATE TIME AND IN ACCORDANCE WITH THE | | | REQUIREMENTS OF ALL APPLICABLE CODES AND STANDARDS. | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | WEST PALM BEACH FIRE RESCUE | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
10-07-2014 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
10-07-2014 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
10-07-2014 |
Time |
09:22 |
Sent To |
|
|
| Notes |
| 2014-10-07 09:26:15 | THE FOLLOWING COMMENTS WERE SUBMITTED BY PETER LEDUC, | | | FIRE MARSHAL, BUREAU OF FIRE PREVENTION, WEST PALM | | | BEACH FIRE RESCUE. | | | | | | THIS REVIEW CAN ONLY BE CONSIDERED PRELIMINARY AS THE | | | DRAWINGS THAT WERE REVIEWED WERE NOT COMPLETE. | | | ADDITIONAL COMMENTS CAN BE EXPECTED WHEN FULL DRAWINGS | | | ARE SUBMITTED FOR PERMIT. | | | | | | THE FIRE PREVENTION BUREAU HAS NO OBJECTIONS TO THE | | | PROPOSED PROJECT. | | | | | | THE NATURE OF THE REMODEL REQUIRES AN EVALUATION OF THE | | | FIRE ALARM AND SPRINKLER SYSTEM FOR CODE COVERAGE AND | | | COMPLIANCE. | | | | | | THE LIFE SAFETY SYSTEMS, FIRE ALARM AND/OR FIRE | | | SPRINKLER SHALL REMAIN ACTIVE THROUGHOUT THE | | | CONSTRUCTION PERIOD. | | | | | | ANY AND ALL WORK ON THE FIRE ALARM AND FIRE SPRINKLER | | | SYSTEMS SHALL BE DONE UNDER SEPARATE SHOP DRAWINGS AND | | | BY CERTIFIED LIFE SAFETY CONTRACTORS. | | | | | | ANY TIME THAT WORK ON THE LIFE SAFETY SYSTEMS, | | | SPRINKLER AND/OR FIRE ALARM, EXCEEDS 4 HOURS, A FIRE | | | WATCH SHALL BE IMPLEMENTED AND MAINTAINED UNTIL FULL | | | AND COMPLETE PROTECTION IS RETURNED. | | | | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
PARK |
PARKING |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
POLICE |
POLICE |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
PW |
PUBLIC WORKS |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
2 |
Status |
P |
Date |
11-07-2014 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
11-07-2014 |
Time |
10:03 |
Rev Time |
0.00 |
| Received By |
vnoel |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
1 |
Status |
F |
Date |
10-06-2014 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
10-06-2014 |
Time |
09:41 |
Rev Time |
|
| Received By |
vnoel |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2014-10-06 09:44:37 | 1. NO SURVEY PROVIDED. | | | 2. SEPARATE SUBMITTAL WILL BE REQUIRED FOR SITE/CIVIL | | | PLANS. | | | 3. RIGHT-OF-WAY PERMIT WILL BE REQUIRED FOR CLOSURE. | | | 4. PLANS DO NOT SHOW REVISED EXIT TO FLAGLER DR./6TH | | | STREET. |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
1 |
Status |
F |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
10-07-2014 |
Time |
|
Rev Time |
0.00 |
| Received By |
bcollins |
Date |
10-07-2014 |
Time |
08:19 |
Sent To |
|
|
| Notes |
| 2014-10-07 08:20:17 | SITE PLAN DOES NOT SHOW DRIVEWAY MODIFICATIONS IN | | | CONJUNCTION WITH FLAGLER BRIDGE PROJECT. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
10-08-2014 |
|
|
Cont ID |
|
| Sent By |
aaponte |
Date |
10-08-2014 |
Time |
11:09 |
Rev Time |
0.00 |
| Received By |
aaponte |
Date |
10-08-2014 |
Time |
11:09 |
Sent To |
|
|
| Notes |
| 2014-10-08 11:18:33 | 1. FPL IS REQUESTING THE RELOCATION OF SOME EXISTING | | | PALMS LOCATED ALONG OLIVE AVENUE DUE TO ITS PROXIMITY | | | TO THE POWER LINES. BASED ON CURRENT CONDITIONS, THE | | | PALMS CAN BE RELOCATED ADJACENT TO THE BUILDING WALL. | | | 2. PROPOSED HANDICAP SPACES HAVE THE ACCESSIBLE AISLE | | | ON THE DRIVE AISLE. PLEASE STUDY A DIFFERENT OPTION TO | | | ENSURE THE SAFETY OF HANDICAP USERS. |
|
|
| |
Print |