Plan Review Details - Project Z13120015
Plan Review Stops For Project Z13120015
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 01-07-2014 Cont ID  
Sent By rbrown Date 01-07-2014 Time 20:53 Rev Time 0.00
Received By rbrown Date 01-07-2014 Time 20:53 Sent To  
Notes
2014-01-07 20:54:43DEVELOPMENT SERVICES DEPARTMENT, BUILDING DIVISION,
 COMMENTS:
  
 NO COMMENTS ON THE PROPOSAL TO WAIVE THE MIDDLE THIRD
 REQUIREMENT FOR THE EXISTING DOCK.

Review Stop ENG - PPRC ENGINEERING - PPRC
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop L LANDSCAPING
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop PARK PARKING
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop POLICE POLICE
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop PW PUBLIC WORKS
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop STORM STORMWATER
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop SURVEY SURVEYING
Rev No 2 Status P Date 01-28-2014 Cont ID  
Sent By eschneid Date 01-28-2014 Time 08:46 Rev Time 0.00
Received By eschneid Date   Time   Sent To  
Notes
***NONE***

Review Stop SURVEY SURVEYING
Rev No 1 Status F Date 01-02-2014 Cont ID  
Sent By vnoel Date 01-02-2014 Time 06:57 Rev Time  
Received By vnoel Date   Time   Sent To  
Notes
2014-01-02 06:59:041. NO PLAN WAS PROVIDED SHOWING EXISTING DOCK
 DIMENSIONS TO PROPOSED LOTS.

Review Stop TRAFFIC TRAFFIC ENGINEERING
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 01-28-2014 Cont ID  
Sent By eschneid Date 01-28-2014 Time 08:48 Rev Time 0.00
Received By eschneid Date 01-28-2014 Time 08:48 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 01-08-2014 Cont ID  
Sent By eschneid Date 01-08-2014 Time 09:03 Rev Time 1.00
Received By eschneid Date 01-08-2014 Time 09:03 Sent To  
Notes
2014-01-08 09:03:58CASE NO. 1645A
 CHURCHILL ESTATES LOT 3 DOCK WAIVER
 101 CHURCHILL ROAD
  
 - CONTACT ERIC SCHNEIDER @ (561) 822-1446
  
 - PLEASE PROVIDE RESPONSES TO REVIEW COMMENTS IN
 WRITTEN FORMAT.
  
 - WHEN RESUBMITTING, PLEASE PROVIDE A MINIMUM OF TEN
 (10) PAPER COPIES AND AN ELECTRONIC COPY IN .PNG FORMAT
 OF ALL PLANS. PLEASE NOTE THAT CHANGES ON THE
 RESUBMITTED PLANS MAY RESULT IN ADDITIONAL COMMENTS.
  
 - THE PPRC COMMENTS SHALL BE SUFFICIENTLY ADDRESSED AND
 SUBMITTED TO THE PLANNING DIVISION BY 5 PM ON FRIDAY,
 JANUARY 17, 2014, TO BE SCHEDULED FOR THE FEBRUARY 19,
 2014 PLANNING BOARD MEETING.
  
 - PLEASE NOTE THAT IF THE PLANNING DIVISION HAS NOT
 RECEIVED A RESPONSE TO THE PPRC COMMENTS WITHIN 60 DAYS
 FROM THE DATE OF THE PPRC MEETING (MARCH 8, 2014), THE
 CASE SHALL BE CONSIDERED WITHDRAWN. ANY FURTHER ACTION
 SHALL REQUIRE A NEW DEVELOPMENT APPLICATION.
  
 - PLEASE NOTE THAT YOU WILL BE PERMITTED ONE (1)
 RESUBMITTAL AT NO ADDITIONAL COST. IF PREVIOUSLY-ISSUED
 COMMENTS CONTINUE TO NOT BE SUFFICIENTLY ADDRESSED, THE
 APPLICANT WILL BE ACCESSED A RESUBMITTAL FEE. SUCH FEE
 WILL BE 20% OF THE ORIGINAL APPLICATION FEE ($720).
  
 - PUBLIC HEARING NOTIFICATION SIGNAGE SHALL BE POSTED
 IN ACCORDANCE WITH THE REQUIREMENTS OF ORDINANCE NO.
 4357-11.
  
 1) THE PLANS WERE NOT PROVIDED IN ELECTRONIC FORMAT.
  
 2) PROVIDE THE SETBACKS ON THE SURVEY FROM THE EXISTING
 DOCK TO THE EXISTING NORTH AND SOUTH PROPERTY LINES
 EXTENDED.
  
 3) PROVIDE A GRAPHIC, TO SCALE, WHICH SHOWS THE
 PROPOSED SETBACK OF THE EXISTING DOCK, INCLUDING
 PILINGS, BOAT LIFT AND SIDE OF THE DOCK TO THE NEWLY
 PROPOSED LOT LINE EXTENSION BETWEEN LOTS 3A AND 3B.
  
 4) PROVIDE A GRAPHIC, TO SCALE, WHICH SHOWS THE MIDDLE
 ONE THIRD DIMENSIONS FOR PROPOSED LOTS 3A AND 3B AND
 INCLUDES THE EXISTING DOCK.
  
 SUBMITTAL OF THE INFORMATION REQUIRED ABOVE MAY
 GENERATE ADDITIONAL COMMENTS.
  
  

  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved