Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 06-12-2013 Cont ID  
Sent By mcarsill Date 06-04-2013 Time 06:07 Rev Time 0.00
Received By lmartine Date 06-12-2013 Time 11:12 Sent To  
Notes
2013-06-12 11:26:58BUILDING REVIEW COMMENTS
  
  
 : THE PLANS LOOK FINE.
  
 : THE SURVEY PROVIDED CALLING FOR FLOOD ZONE 'A-5' MAY
 BE INCORRECT. THE PROPOSED ADDITION SHOULD BE NOTED IN
 ZONE 'C'.
  
 : SHEET A-2 WIND DESIGN, SEE DEFINITION FOR EXPOSURE
 'D', 2010 FBC SECTION 1609.4.3
  
  
  
 LUIS MARTINEZ
 561-805-6710
  
  
  

Review Stop ENG - PPRC ENGINEERING - PPRC
Rev No 1 Status F Date 06-10-2013 Cont ID  
Sent By mgonzale Date 06-10-2013 Time   Rev Time 1.00
Received By mgonzale Date 06-10-2013 Time   Sent To Z
Notes
2013-06-10 09:16:34INFORMAL SITE PLAN REVIEW NO. 13-03 (Z13040037)
  
 #1 EASEMENT WILL BE REQUIRED ALONG THE SOUTH PROPERTY
 LINE OVER CITY'S WATERMAIN. VERIFY LOCATION OF
 WATERMAIN AS THE LOCATION IS UNCERTAIN.
  
 #2 PROVIDE PERVIOUS AND IMPERVIOUS CALCULATIONS TO
 UPDATE CITY'S STORM WATER ACCOUNT. STORM CALCULATIONS
 FOR TREATING WATER IN NEW IMPERVIOUS AREAS.
 PROVIDE FINISH FLOOR ELEVATION FOR PROPOSED ADDITION.
  
 #3 WATER DETAILS ON PLAN REFLECT PALM BEACH COUNTY
 STANDARD AND NOT CITY OF WPB.
  
 #4 ADA ACCESIBILITY TO CLOSEST PUBLIC R.O.W.
  
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status F Date 06-04-2013 Cont ID  
Sent By mcarsill Date 06-04-2013 Time 06:07 Rev Time 0.00
Received By mcarsill Date 06-04-2013 Time 06:07 Sent To  
Notes
2013-06-04 06:06:54INFORMAL SITE PLAN REVIEW 13-03 (Z13040037)
 TEMPLE BETH EL
 2815 NORTH FLAGLER DRIVE
 ANGELLA VANN, PLANNING AND ZONING ADMINISTRATOR
  
 1. PLEASE DECLARE CONSTRUCTION TYPE FOR NEW BUILDING
 ADDITION. PLEASE DECLARE CONSTRUCTION TYPE FOR EXISTING
 CHAPEL.
  
 2. BUILDING ADDRESS REQUIRED. A MINIMUM OF AT LEAST 6"
 HIGH NUMBERS ARE REQUIRED THAT CONTRAST WITH THE
 BACKGROUND THEY ARE AFFIXED TO.
  
 3. PLEASE INDICATE PRESCRIPTIVE STRENGTH REQUIREMENTS
 FOR ALL HANDRAILS AND GUARDRAILS.
  
 4. PLEASE INDICATE ALL ILLUMINATED EXIT SIGNS AND
 EMERGENCY LIGHTS.
  
 5. PLEASE PROVIDE A LIFE SAFETY PLAN.
  
 6. PLEASE PROVIDE A DOOR AND HARDWARE SCHEDULE.
  
 7. DEMOLITION, RENOVATION AND CONSTRUCTION TO COMPLY
 WITH NFPA 241.
  
 8. ALL NEW RAMPS AND STAIRS ARE TO BE PROVIDED WITH
 HANDRAILS.
  
 9. PLEASE PROVIDE FLAMESPREAD DETAILS ON THE ACCORDION
 ROOM DIVIDER.
  
 10. PLEASE INDICATE ALL VERTICAL AND HORIZONTAL FIRE
 SEPARATIONS.
  
 11. PLEASE PROVIDE THE LOCATIONS OF ALL PORTABLE FIRE
 EXTINGUISHERS ON THE PLANS.
  
 DENIED
  
  
 MICHAEL E. CARSILLO, ASSISTANT FIRE CHIEF
 WEST PALM BEACH FIRE RESCUE

Review Stop L LANDSCAPING
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop PARK PARKING
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop POLICE POLICE
Rev No 1 Status F Date   Cont ID  
Sent By   Date   Time   Rev Time 0.00
Received By ktucker Date 06-06-2013 Time 13:55 Sent To  
Notes
2013-06-06 13:55:31* ALARM DOORS, AND WINDOWS AND CONSIDER CCT
 * ROOMS THAT CONTAIN EXPENSIVE PROPERTY SHOULD BE
 LOCKED WITH CONTROLLED ACCESS
  
  
  CONDITIONS FOR APPROVAL
 PRIOR TO ISSUANCE OF THE FIRST BUILDING PERMIT, THE
 APPLICANT SHALL PREPARE A CONSTRUCTION SITE SECURITY
 AND MANAGEMENT PLAN FOR APPROVAL BY THE CITY OF WEST
 PALM BEACH POLICE DEPARTMENT CPTED OFFICIAL.
 A. AFTER SITE CLEARING AND PLACEMENT OF CONSTRUCTION
 TRAILERS, THE DEVELOPER/PROJECT MANAGER SHALL INSTITUTE
 SECURITY MEASURES TO REDUCE OR ELIMINATE OPPORTUNITIES
 FOR THEFT. THE MANAGEMENT PLAN SHALL INCLUDE, BUT NOT
 BE LIMITED TO, TEMPORARY LIGHTING, SECURITY PERSONNEL,
 VEHICLE BARRIERS, CONSTRUCTION/VISITOR PASS,
 REDUCE/MINIMIZE ENTRY/EXIT POINTS, ENCOURAGE
 SUBCONTRACTORS TO SECURE MACHINERY, TOOLS AT END OF
 WORK DAY, FENCING WITH SCREENING AND OR ANY OTHER
 MEASURE DEEMED APPROPRIATE TO PROVIDE A SAFE AND SECURE
 WORKING ENVIRONMENT.
 B. THE SECURITY MANAGEMENT PLAN SHALL BE MAINTAINED
 THROUGHOUT THE CONSTRUCTION PHASE OF THE PROJECT.
 NON-COMPLIANCE WITH THE APPROVED PLAN SHALL RESULT IN A
 STOP-WORK ORDER FOR THE ENTIRE PLANNED UNIT
 DEVELOPMENT.
 C. PROPERTY SHALL BE POST ?NO TRESPASSING? SIGNS EVERY
 500 FEET AROUND THE PERIMETER OF THE SITE.
  
  
 A. EXTERIOR DOORS SHALL ALL BE EQUIPPED WITH SECURITY
 HINGES AND SHALL BE REINFORCED WITH CASE HARDENED
 STRIKE PLATES. CASE HARDENED DEADBOLT LOCKS SHALL BE
 PROVIDED ON ALL EXTERIOR DOORS WITH A MINIMUM (1) INCH
 THROW OR MECHANICAL INTERLOCK.
 B. GLASS PERIMETER DOORS SHALL BE EQUIPPED WITH CASE
 HARDENED GUARD RINGS TO PROTECT THE MORTISE LOCK
 CYLINDER.
 C. EXIT DOORS SHALL BE EQUIPPED WITH 180-DEGREE
 PEEPHOLE/ SECURITY VIEWER.
 D. LANDSCAPING SHALL BE MAINTAINED AT 3 FEET OR LESS.
 TREES SHALL BE INSTALLED SO AS NOT TO CONFLICT WITH THE
 LIGHTING SYSTEM. LOWER CANOPY LIMBS ON TREES SHALL BE
 MAINTAINED AT 8 FEET OR HIGHER.
  
  

Review Stop PW PUBLIC WORKS
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop STORM STORMWATER
Rev No 2 Status P Date 10-01-2013 Cont ID  
Sent By tward Date 10-01-2013 Time 00:43 Rev Time 0.00
Received By tward Date   Time   Sent To  
Notes
2013-10-01 00:53:431. WATER METER MAY NEED TO BE LOCATED OUTSIDE FENCE
 AREA FOR ACCESS BY CITY STAFF.
 2. CONSIDER UTILIZING CONCRETE WALK AS HANDICAP AISLES
 TO REDUCE THE AMOUNT OF NEW PAVEMENT.
 3. SIDE SLOPES OF WEST DRY RETENTION AREA APPEAR TO BE
 3:1. CONSIDER CHANGING TO 4:1 OR FLATTER (HOLDING TOE
 OF SLOPE).
 4. ANY REASON WHY RETENTION AREAS CANNOT BE ENLARGED TO
 PROVIDE STORAGE/TREATMENT OF RUNOFF FROM EXISTING
 PARKING LOT.
 5. SPOT GRADE ON RAMP SLOPE NORTH OF H.C. PARKING SPACE
 APPEARS TO BE MISLABELED. SHOULD IT BE 11.90 INSTEAD OF
 10.90? IS A RAMP NEEDED HERE?
  
 TRACY L. WARD, P.E.
 SENIOR STORMWATER ENGINEER
 ENGINEERING AND PUBLIC WORKS DEPARTMENT
 561-494-1120

Review Stop STORM STORMWATER
Rev No 1 Status F Date 06-06-2013 Cont ID  
Sent By tward Date 06-06-2013 Time 18:40 Rev Time  
Received By tward Date   Time   Sent To  
Notes
2013-06-06 19:05:181. CIVIL PLAN IS A COPY OF A SIGNED AND SEALED PLAN.
 2. CIVIL PLAN DOES NOT MATCH SITE PLAN. SITE PLAN SHOWS
 A SIDEWALK CONNECTION TO NORTH DIXIE HIGHWAY SIDEWALK.
 THIS SIDEWALK WILL AFFECT THE PROPOSED DRAINAGE SWALE.
 3. INDICATE VERTICAL DATUM ON CIVIL PLAN AND SITE
 PLAN.SURVEY INDICATES NGVD 1929.
 4. SIGNED AND SEALED DRAINAGE CALCULATIONS TO BE
 PROVIDED SHOWING WATER QUALITY TREATMENT IS BEING
 PROVIDED (PER SFWMD CRITERIA).
 5. ENTRANCE GATE WILL BLOCK THE FIRST REGULAR AND
 HANDICAP PARKING SPACES.
 6. CHECK PAVEMENT SLOPE OF EXISTING PARKING SO THAT NEW
 CURBING OF LANDSCAPE ISLANDS DOESN'T TRAP RUNOFF.
 7. SUGGEST THE 10' WIDE SIDEWALK BETWEEN HANDICAP
 PARKING SPACES BE 6" THICK IN CASE IT IS INADVERTENTLY
 USED FOR PARKING.
 8. SWPPP NEEDED WITH ENGINEERING PERMIT APPLICATION.
  
 TRACY L. WARD, P.E.
 ENGINEERING AND PUBLIC WORKS DEPARTMENT
 561-494-1120
  

Review Stop SURVEY SURVEYING
Rev No 2 Status P Date 09-23-2013 Cont ID  
Sent By vnoel Date 09-23-2013 Time 09:42 Rev Time 0.00
Received By vnoel Date   Time   Sent To  
Notes
2013-09-23 09:46:31PASSED, BUT WITH CONDITION THAT A 10' UTILITY EASEMENT
 BE GRANTED OVER THE SOUTH 10 FEET OF THE PROPERTY PRIOR
 TO C.O. APPLICANT NEEDS TO CONTACT ENGINEERING SERVICES
 FOR FURTHER INFORMATION.

Review Stop SURVEY SURVEYING
Rev No 1 Status F Date 06-10-2013 Cont ID  
Sent By vnoel Date 06-10-2013 Time 09:58 Rev Time  
Received By vnoel Date   Time   Sent To  
Notes
2013-06-10 09:58:011. SURVEY SHOULD BE DATED WITHIN 1 YEAR.
 2. RELOCATED BUILDING NEEDS TO BE SHOWN ON SURVEY WITH
 FINISHED FLOOR ELEVATION.
 3. LEGAL DESCRIPTION CALLS FOR LESS-OUT OF WEST 30
 FEET, BUT SURVEY SHOWING PROPERTY LINE AT BACK OF WALK.
 SIDEWALK EASEMENT MAY BE REQUIRED.
 4. SITE CIVIL PLANS WILL NEED TO BE SUBMITTED.

Review Stop TRAFFIC TRAFFIC ENGINEERING
Rev No 1 Status F Date   Cont ID  
Sent By   Date 06-13-2013 Time   Rev Time 0.00
Received By bcollins Date 06-12-2013 Time 08:13 Sent To  
Notes
2013-06-12 08:18:30NO TRAFFIC CONTROL (STOP SIGNS AND STOP BARS, ONE WAY
 SIGNS/MARKINGS) SHOWN ON PLAN. NEED TO DELINEATE
 TRAFFIC PATH THROUGH FIRST INTERSECTION ON SITE EAST OF
 POINSETTIA. THERE IS A JOG IN THE DRIVE AISLE WHICH
 COULD CAUSE DRIVERS TO HIT THE LANDSCAPED ISLAND.

Review Stop Z ZONING
Rev No 1 Status F Date 06-10-2013 Cont ID  
Sent By ajones Date 06-10-2013 Time 14:42 Rev Time 0.00
Received By ajones Date 06-10-2013 Time 14:41 Sent To  
Notes
2013-06-10 14:50:516-6-13
 GENERAL COMMENTS: WHEN RESUBMITTING:
 A. PROVIDE WRITTEN RESPONSES TO REVIEW COMMENTS MADE BY
 DEPARTMENTS IN A WRITTEN FORMAT WHEN RESUBMITTING.
 B. 15 SETS OF REVISED PLANS AND/OR DOCUMENTS SHALL BE
 PROVIDED, ALONG WITH ONE REDUCED COPY AND AN ELECTRONIC
 COPY OF ALL PLANS.
 C. IF NO RESPONSE IS RECEIVED WITHIN 60 DAYS OF THE
 ISSUANCE OF THESE COMMENTS, THE APPLICATION WILL BE
 CONSIDERED WITHDRAWN AND ANY FURTHER ACTION WILL
 REQUIRE SUBMISSION OF A NEW DEVELOPMENT APPLICATION.
 D. PLEASE NOT THAT YOU WILL BE PERMITTED ONE (1)
 RESUBMITTAL AT NO ADDITIONAL COST. IF PREVIOUSLY-ISSUED
 COMMENTS CONTINUE TO NOT BE SUFFICIENTLY ADDRESSED, THE
 APPLICANT WILL BE ACCESSED A RESUBMITTAL FEE. SUCH FEE
 WILL BE 20% OF THE ORIGINAL APPLICATION FEE.
  
 SITE PLAN:
 A. APPLICANT MUST SHOW THAT THE SITE IS MEETING THE
 MINIMUM 15% LANDSCAPE REQURIEMENT FOR THE SITE.
 B. PROVIDE A DETAIL LANDSCAPE PLAN MEETING THE
 REQUIREMENTS OFSECTION 94-442 OF THE ZONING AND LAND
 DEVELOPMENT REGULATIONS FOR THE NEW AREA.
 C. THE EXISTING GATE ALONG DIXIE MAY BLACK THE 2 ON THE
 PROPOSED PARKING SPACES.
 D. ALL TERMINALS ISLANDS MUST BE THE LENGTH OF THE
 PARKING SPACE.
  
 ANGELLA VANN
 561-822-1441
 [email protected]

  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved