| Plan Review Stops For Project Z13040037 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
06-12-2013 |
|
|
Cont ID |
|
| Sent By |
mcarsill |
Date |
06-04-2013 |
Time |
06:07 |
Rev Time |
0.00 |
| Received By |
lmartine |
Date |
06-12-2013 |
Time |
11:12 |
Sent To |
|
|
| Notes |
| 2013-06-12 11:26:58 | BUILDING REVIEW COMMENTS | | | | | | | | | : THE PLANS LOOK FINE. | | | | | | : THE SURVEY PROVIDED CALLING FOR FLOOD ZONE 'A-5' MAY | | | BE INCORRECT. THE PROPOSED ADDITION SHOULD BE NOTED IN | | | ZONE 'C'. | | | | | | : SHEET A-2 WIND DESIGN, SEE DEFINITION FOR EXPOSURE | | | 'D', 2010 FBC SECTION 1609.4.3 | | | | | | | | | | | | LUIS MARTINEZ | | | 561-805-6710 | | | | | | | | | |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
1 |
Status |
F |
Date |
06-10-2013 |
|
|
Cont ID |
|
| Sent By |
mgonzale |
Date |
06-10-2013 |
Time |
|
Rev Time |
1.00 |
| Received By |
mgonzale |
Date |
06-10-2013 |
Time |
|
Sent To |
Z |
|
| Notes |
| 2013-06-10 09:16:34 | INFORMAL SITE PLAN REVIEW NO. 13-03 (Z13040037) | | | | | | #1 EASEMENT WILL BE REQUIRED ALONG THE SOUTH PROPERTY | | | LINE OVER CITY'S WATERMAIN. VERIFY LOCATION OF | | | WATERMAIN AS THE LOCATION IS UNCERTAIN. | | | | | | #2 PROVIDE PERVIOUS AND IMPERVIOUS CALCULATIONS TO | | | UPDATE CITY'S STORM WATER ACCOUNT. STORM CALCULATIONS | | | FOR TREATING WATER IN NEW IMPERVIOUS AREAS. | | | PROVIDE FINISH FLOOR ELEVATION FOR PROPOSED ADDITION. | | | | | | #3 WATER DETAILS ON PLAN REFLECT PALM BEACH COUNTY | | | STANDARD AND NOT CITY OF WPB. | | | | | | #4 ADA ACCESIBILITY TO CLOSEST PUBLIC R.O.W. | | | | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
F |
Date |
06-04-2013 |
|
|
Cont ID |
|
| Sent By |
mcarsill |
Date |
06-04-2013 |
Time |
06:07 |
Rev Time |
0.00 |
| Received By |
mcarsill |
Date |
06-04-2013 |
Time |
06:07 |
Sent To |
|
|
| Notes |
| 2013-06-04 06:06:54 | INFORMAL SITE PLAN REVIEW 13-03 (Z13040037) | | | TEMPLE BETH EL | | | 2815 NORTH FLAGLER DRIVE | | | ANGELLA VANN, PLANNING AND ZONING ADMINISTRATOR | | | | | | 1. PLEASE DECLARE CONSTRUCTION TYPE FOR NEW BUILDING | | | ADDITION. PLEASE DECLARE CONSTRUCTION TYPE FOR EXISTING | | | CHAPEL. | | | | | | 2. BUILDING ADDRESS REQUIRED. A MINIMUM OF AT LEAST 6" | | | HIGH NUMBERS ARE REQUIRED THAT CONTRAST WITH THE | | | BACKGROUND THEY ARE AFFIXED TO. | | | | | | 3. PLEASE INDICATE PRESCRIPTIVE STRENGTH REQUIREMENTS | | | FOR ALL HANDRAILS AND GUARDRAILS. | | | | | | 4. PLEASE INDICATE ALL ILLUMINATED EXIT SIGNS AND | | | EMERGENCY LIGHTS. | | | | | | 5. PLEASE PROVIDE A LIFE SAFETY PLAN. | | | | | | 6. PLEASE PROVIDE A DOOR AND HARDWARE SCHEDULE. | | | | | | 7. DEMOLITION, RENOVATION AND CONSTRUCTION TO COMPLY | | | WITH NFPA 241. | | | | | | 8. ALL NEW RAMPS AND STAIRS ARE TO BE PROVIDED WITH | | | HANDRAILS. | | | | | | 9. PLEASE PROVIDE FLAMESPREAD DETAILS ON THE ACCORDION | | | ROOM DIVIDER. | | | | | | 10. PLEASE INDICATE ALL VERTICAL AND HORIZONTAL FIRE | | | SEPARATIONS. | | | | | | 11. PLEASE PROVIDE THE LOCATIONS OF ALL PORTABLE FIRE | | | EXTINGUISHERS ON THE PLANS. | | | | | | DENIED | | | | | | | | | MICHAEL E. CARSILLO, ASSISTANT FIRE CHIEF | | | WEST PALM BEACH FIRE RESCUE |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
PARK |
PARKING |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
POLICE |
POLICE |
| Rev No |
1 |
Status |
F |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
0.00 |
| Received By |
ktucker |
Date |
06-06-2013 |
Time |
13:55 |
Sent To |
|
|
| Notes |
| 2013-06-06 13:55:31 | * ALARM DOORS, AND WINDOWS AND CONSIDER CCT | | | * ROOMS THAT CONTAIN EXPENSIVE PROPERTY SHOULD BE | | | LOCKED WITH CONTROLLED ACCESS | | | | | | | | | CONDITIONS FOR APPROVAL | | | PRIOR TO ISSUANCE OF THE FIRST BUILDING PERMIT, THE | | | APPLICANT SHALL PREPARE A CONSTRUCTION SITE SECURITY | | | AND MANAGEMENT PLAN FOR APPROVAL BY THE CITY OF WEST | | | PALM BEACH POLICE DEPARTMENT CPTED OFFICIAL. | | | A. AFTER SITE CLEARING AND PLACEMENT OF CONSTRUCTION | | | TRAILERS, THE DEVELOPER/PROJECT MANAGER SHALL INSTITUTE | | | SECURITY MEASURES TO REDUCE OR ELIMINATE OPPORTUNITIES | | | FOR THEFT. THE MANAGEMENT PLAN SHALL INCLUDE, BUT NOT | | | BE LIMITED TO, TEMPORARY LIGHTING, SECURITY PERSONNEL, | | | VEHICLE BARRIERS, CONSTRUCTION/VISITOR PASS, | | | REDUCE/MINIMIZE ENTRY/EXIT POINTS, ENCOURAGE | | | SUBCONTRACTORS TO SECURE MACHINERY, TOOLS AT END OF | | | WORK DAY, FENCING WITH SCREENING AND OR ANY OTHER | | | MEASURE DEEMED APPROPRIATE TO PROVIDE A SAFE AND SECURE | | | WORKING ENVIRONMENT. | | | B. THE SECURITY MANAGEMENT PLAN SHALL BE MAINTAINED | | | THROUGHOUT THE CONSTRUCTION PHASE OF THE PROJECT. | | | NON-COMPLIANCE WITH THE APPROVED PLAN SHALL RESULT IN A | | | STOP-WORK ORDER FOR THE ENTIRE PLANNED UNIT | | | DEVELOPMENT. | | | C. PROPERTY SHALL BE POST ?NO TRESPASSING? SIGNS EVERY | | | 500 FEET AROUND THE PERIMETER OF THE SITE. | | | | | | | | | A. EXTERIOR DOORS SHALL ALL BE EQUIPPED WITH SECURITY | | | HINGES AND SHALL BE REINFORCED WITH CASE HARDENED | | | STRIKE PLATES. CASE HARDENED DEADBOLT LOCKS SHALL BE | | | PROVIDED ON ALL EXTERIOR DOORS WITH A MINIMUM (1) INCH | | | THROW OR MECHANICAL INTERLOCK. | | | B. GLASS PERIMETER DOORS SHALL BE EQUIPPED WITH CASE | | | HARDENED GUARD RINGS TO PROTECT THE MORTISE LOCK | | | CYLINDER. | | | C. EXIT DOORS SHALL BE EQUIPPED WITH 180-DEGREE | | | PEEPHOLE/ SECURITY VIEWER. | | | D. LANDSCAPING SHALL BE MAINTAINED AT 3 FEET OR LESS. | | | TREES SHALL BE INSTALLED SO AS NOT TO CONFLICT WITH THE | | | LIGHTING SYSTEM. LOWER CANOPY LIMBS ON TREES SHALL BE | | | MAINTAINED AT 8 FEET OR HIGHER. | | | | | | |
|
|
| Review Stop |
PW |
PUBLIC WORKS |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
2 |
Status |
P |
Date |
10-01-2013 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
10-01-2013 |
Time |
00:43 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2013-10-01 00:53:43 | 1. WATER METER MAY NEED TO BE LOCATED OUTSIDE FENCE | | | AREA FOR ACCESS BY CITY STAFF. | | | 2. CONSIDER UTILIZING CONCRETE WALK AS HANDICAP AISLES | | | TO REDUCE THE AMOUNT OF NEW PAVEMENT. | | | 3. SIDE SLOPES OF WEST DRY RETENTION AREA APPEAR TO BE | | | 3:1. CONSIDER CHANGING TO 4:1 OR FLATTER (HOLDING TOE | | | OF SLOPE). | | | 4. ANY REASON WHY RETENTION AREAS CANNOT BE ENLARGED TO | | | PROVIDE STORAGE/TREATMENT OF RUNOFF FROM EXISTING | | | PARKING LOT. | | | 5. SPOT GRADE ON RAMP SLOPE NORTH OF H.C. PARKING SPACE | | | APPEARS TO BE MISLABELED. SHOULD IT BE 11.90 INSTEAD OF | | | 10.90? IS A RAMP NEEDED HERE? | | | | | | TRACY L. WARD, P.E. | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING AND PUBLIC WORKS DEPARTMENT | | | 561-494-1120 |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
1 |
Status |
F |
Date |
06-06-2013 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
06-06-2013 |
Time |
18:40 |
Rev Time |
|
| Received By |
tward |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2013-06-06 19:05:18 | 1. CIVIL PLAN IS A COPY OF A SIGNED AND SEALED PLAN. | | | 2. CIVIL PLAN DOES NOT MATCH SITE PLAN. SITE PLAN SHOWS | | | A SIDEWALK CONNECTION TO NORTH DIXIE HIGHWAY SIDEWALK. | | | THIS SIDEWALK WILL AFFECT THE PROPOSED DRAINAGE SWALE. | | | 3. INDICATE VERTICAL DATUM ON CIVIL PLAN AND SITE | | | PLAN.SURVEY INDICATES NGVD 1929. | | | 4. SIGNED AND SEALED DRAINAGE CALCULATIONS TO BE | | | PROVIDED SHOWING WATER QUALITY TREATMENT IS BEING | | | PROVIDED (PER SFWMD CRITERIA). | | | 5. ENTRANCE GATE WILL BLOCK THE FIRST REGULAR AND | | | HANDICAP PARKING SPACES. | | | 6. CHECK PAVEMENT SLOPE OF EXISTING PARKING SO THAT NEW | | | CURBING OF LANDSCAPE ISLANDS DOESN'T TRAP RUNOFF. | | | 7. SUGGEST THE 10' WIDE SIDEWALK BETWEEN HANDICAP | | | PARKING SPACES BE 6" THICK IN CASE IT IS INADVERTENTLY | | | USED FOR PARKING. | | | 8. SWPPP NEEDED WITH ENGINEERING PERMIT APPLICATION. | | | | | | TRACY L. WARD, P.E. | | | ENGINEERING AND PUBLIC WORKS DEPARTMENT | | | 561-494-1120 | | | |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
2 |
Status |
P |
Date |
09-23-2013 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
09-23-2013 |
Time |
09:42 |
Rev Time |
0.00 |
| Received By |
vnoel |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2013-09-23 09:46:31 | PASSED, BUT WITH CONDITION THAT A 10' UTILITY EASEMENT | | | BE GRANTED OVER THE SOUTH 10 FEET OF THE PROPERTY PRIOR | | | TO C.O. APPLICANT NEEDS TO CONTACT ENGINEERING SERVICES | | | FOR FURTHER INFORMATION. |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
1 |
Status |
F |
Date |
06-10-2013 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
06-10-2013 |
Time |
09:58 |
Rev Time |
|
| Received By |
vnoel |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2013-06-10 09:58:01 | 1. SURVEY SHOULD BE DATED WITHIN 1 YEAR. | | | 2. RELOCATED BUILDING NEEDS TO BE SHOWN ON SURVEY WITH | | | FINISHED FLOOR ELEVATION. | | | 3. LEGAL DESCRIPTION CALLS FOR LESS-OUT OF WEST 30 | | | FEET, BUT SURVEY SHOWING PROPERTY LINE AT BACK OF WALK. | | | SIDEWALK EASEMENT MAY BE REQUIRED. | | | 4. SITE CIVIL PLANS WILL NEED TO BE SUBMITTED. |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
1 |
Status |
F |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
06-13-2013 |
Time |
|
Rev Time |
0.00 |
| Received By |
bcollins |
Date |
06-12-2013 |
Time |
08:13 |
Sent To |
|
|
| Notes |
| 2013-06-12 08:18:30 | NO TRAFFIC CONTROL (STOP SIGNS AND STOP BARS, ONE WAY | | | SIGNS/MARKINGS) SHOWN ON PLAN. NEED TO DELINEATE | | | TRAFFIC PATH THROUGH FIRST INTERSECTION ON SITE EAST OF | | | POINSETTIA. THERE IS A JOG IN THE DRIVE AISLE WHICH | | | COULD CAUSE DRIVERS TO HIT THE LANDSCAPED ISLAND. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
06-10-2013 |
|
|
Cont ID |
|
| Sent By |
ajones |
Date |
06-10-2013 |
Time |
14:42 |
Rev Time |
0.00 |
| Received By |
ajones |
Date |
06-10-2013 |
Time |
14:41 |
Sent To |
|
|
| Notes |
| 2013-06-10 14:50:51 | 6-6-13 | | | GENERAL COMMENTS: WHEN RESUBMITTING: | | | A. PROVIDE WRITTEN RESPONSES TO REVIEW COMMENTS MADE BY | | | DEPARTMENTS IN A WRITTEN FORMAT WHEN RESUBMITTING. | | | B. 15 SETS OF REVISED PLANS AND/OR DOCUMENTS SHALL BE | | | PROVIDED, ALONG WITH ONE REDUCED COPY AND AN ELECTRONIC | | | COPY OF ALL PLANS. | | | C. IF NO RESPONSE IS RECEIVED WITHIN 60 DAYS OF THE | | | ISSUANCE OF THESE COMMENTS, THE APPLICATION WILL BE | | | CONSIDERED WITHDRAWN AND ANY FURTHER ACTION WILL | | | REQUIRE SUBMISSION OF A NEW DEVELOPMENT APPLICATION. | | | D. PLEASE NOT THAT YOU WILL BE PERMITTED ONE (1) | | | RESUBMITTAL AT NO ADDITIONAL COST. IF PREVIOUSLY-ISSUED | | | COMMENTS CONTINUE TO NOT BE SUFFICIENTLY ADDRESSED, THE | | | APPLICANT WILL BE ACCESSED A RESUBMITTAL FEE. SUCH FEE | | | WILL BE 20% OF THE ORIGINAL APPLICATION FEE. | | | | | | SITE PLAN: | | | A. APPLICANT MUST SHOW THAT THE SITE IS MEETING THE | | | MINIMUM 15% LANDSCAPE REQURIEMENT FOR THE SITE. | | | B. PROVIDE A DETAIL LANDSCAPE PLAN MEETING THE | | | REQUIREMENTS OFSECTION 94-442 OF THE ZONING AND LAND | | | DEVELOPMENT REGULATIONS FOR THE NEW AREA. | | | C. THE EXISTING GATE ALONG DIXIE MAY BLACK THE 2 ON THE | | | PROPOSED PARKING SPACES. | | | D. ALL TERMINALS ISLANDS MUST BE THE LENGTH OF THE | | | PARKING SPACE. | | | | | | ANGELLA VANN | | | 561-822-1441 | | | [email protected] |
|
|
| |