| Plan Review Stops For Project Z12110023 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
12-11-2012 |
|
|
Cont ID |
|
| Sent By |
lmartine |
Date |
12-11-2012 |
Time |
17:16 |
Rev Time |
0.00 |
| Received By |
lmartine |
Date |
12-11-2012 |
Time |
17:16 |
Sent To |
|
|
| Notes |
| 2012-12-11 17:46:22 | BUILDING REVIEW COMMENTS | | | | | | | | | : SEE ENCLOSED GARAGE REQUIREMENTS 2010 FLORIDA | | | BUILDING CODE SECTION 406. | | | | | | : VAN ACCESSIBLE PARKING WILL BE REQUIRED, FBC | | | ACCESSIBILITY CODE, SECTION 502. | | | | | | | | | | | | | | | LUIS MARTINEZ | | | 561-805-6710 | | | | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
0.00 |
| Received By |
ktucker |
Date |
12-10-2012 |
Time |
13:45 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
3 |
Status |
F |
Date |
03-11-2013 |
|
|
Cont ID |
|
| Sent By |
bmoree |
Date |
03-11-2013 |
Time |
09:52 |
Rev Time |
0.00 |
| Received By |
bmoree |
Date |
03-11-2013 |
Time |
09:50 |
Sent To |
|
|
| Notes |
| 2013-03-11 09:52:35 | 1. A SEPARATE SUBMITTAL OF CIVIL DRAWINGS SHALL BE MADE | | | TO THE ENGINEERING & PUBLIC WORKS DEPARTMENT. | | | 2. CONDITIONAL PASSING APPROVAL GRANTED. | | | 3. STREET LIGHTS NEED TO BE CHANGED TO CITY UNIFORM | | | FIXTURE AND POLE. CHANGE WILL IMPACT PROJECT COST AND | | | LIGHTING DESIGN LAYOUT. | | | 4. OTHER PROJECTS ELEMENTS WITHIN THE CITY RIGHT-OF-WAY | | | MAY REQUIRE MODIFICATION FOR UNIFORMITY. SPECIFIC | | | COMMENTS PROVIDED DURING CIVIL PLAN REVIEW. | | | 5. NO RESPONSE TO ENGINEERING AND PUBLIC WORKS COMMENTS | | | IN FEBRUARY 15 UDK CORRESPONDENCE. | | | | | | BRIAN R. MOREE, MPA, FCHP | | | ENGINEERING CONSTRUCTION MANAGER | | | CONSTRUCTION ADMINISTRATION | | | ENGINEERING SERVICES & PUBLIC WORKS DEPARTMENT | | | 401 CLEMATIS STREET | | | FOURTH FLOOR | | | WEST PALM BEACH, FLORIDA 33401 | | | OFFICE: 561-494-1098 | | | MOBILE: 561-644-7270 | | | EMAIL: [email protected] | | | WEB: WWW.WPB.ORG/ENGINEERING | | | |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
2 |
Status |
|
Date |
02-11-2013 |
|
|
Cont ID |
|
| Sent By |
bmoree |
Date |
02-11-2013 |
Time |
14:52 |
Rev Time |
0.00 |
| Received By |
bmoree |
Date |
02-11-2013 |
Time |
14:47 |
Sent To |
|
|
| Notes |
| 2013-02-11 14:52:17 | 1. A SEPARATE SUBMITTAL OF CIVIL DRAWINGS SHALL BE MADE | | | TO THE ENGINEERING & PUBLIC WORKS DEPARTMENT. | | | 2. CONDITIONAL PASSING APPROVAL GRANTED. | | | 3. STREET LIGHTS NEED TO BE CHANGED TO CITY UNIFORM | | | FIXTURE AND POLE. CHANGE WILL IMPACT PROJECT COST AND | | | LIGHTING DESIGN LAYOUT. | | | 4. OTHER PROJECTS ELEMENTS WITHIN THE CITY RIGHT-OF-WAY | | | MAY REQUIRE MODIFICATION FOR UNIFORMITY. SPECIFIC | | | COMMENTS PROVIDED DURING CIVIL PLAN REVIEW. | | | | | | BRIAN R. MOREE, MPA, FCHP | | | ENGINEERING CONSTRUCTION MANAGER | | | CONSTRUCTION ADMINISTRATION | | | ENGINEERING SERVICES & PUBLIC WORKS DEPARTMENT | | | 401 CLEMATIS STREET | | | FOURTH FLOOR | | | WEST PALM BEACH, FLORIDA 33401 | | | OFFICE: 561-494-1098 | | | MOBILE: 561-644-7270 | | | EMAIL: [email protected] | | | WEB: WWW.WPB.ORG/ENGINEERING | | | |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
1 |
Status |
F |
Date |
12-13-2012 |
|
|
Cont ID |
|
| Sent By |
bmoree |
Date |
12-13-2012 |
Time |
16:26 |
Rev Time |
0.00 |
| Received By |
bmoree |
Date |
12-13-2012 |
Time |
16:25 |
Sent To |
|
|
| Notes |
| 2012-12-13 16:26:27 | 1. SPECIFIC COMMENTS ARE NOT AVAILABLE UNTIL CIVIL SITE | | | DRAWINGS ARE SUBMITTED TO THE ENGINEERING SERVICES & | | | PUBLIC WORKS DEPARTMENT FOR FORMAL REVIEW AND | | | PERMITTING. | | | 2. A STORMWATER POLLUTION PREVENTION PLAN (SWPPP) WILL | | | BE REQUIRED PRIOR TO COMMENCEMENT OF SITE WORK. | | | 3. A RIGHT-OF-WAY PERMIT WILL BE REQUIRED FOR ALL | | | PROJECT RELATED WORK IN THE ADJACENT PUBLIC | | | RIGHT-OF-WAY. | | | | | | BRIAN R. MOREE, MPA, FCHP | | | ENGINEERING CONSTRUCTION MANAGER | | | CONSTRUCTION ADMINISTRATION | | | ENGINEERING SERVICES & PUBLIC WORKS DEPARTMENT | | | 401 CLEMATIS STREET | | | FOURTH FLOOR | | | WEST PALM BEACH, FLORIDA 33401 | | | OFFICE: 561-494-1098 | | | MOBILE: 561-644-7270 | | | EMAIL: [email protected] | | | WEB: WWW.WPB.ORG/ENGINEERING | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
F |
Date |
03-01-2013 |
|
|
Cont ID |
|
| Sent By |
ddaniels |
Date |
03-01-2013 |
Time |
09:00 |
Rev Time |
0.00 |
| Received By |
ddaniels |
Date |
03-01-2013 |
Time |
09:00 |
Sent To |
|
|
| Notes |
| 2013-03-01 09:00:44 | 1. DESIGN SHALL CONFORM TO THE 2010 EDITION OF THE | | | FLORIDA FIRE PREVENTION CODE WHICH CONTAINS THE FLORIDA | | | EDITION OF NFPA 1 AND NFPA 101. | | | | | | 2. SEPARATE PLANS AND PERMITS ARE REQUIRED FOR THE | | | INSTALLATION OR MODIFICATION OF THE FIRE SPRINKLER | | | SYSTEM AND/OR FIRE ALARM SYSTEM. | | | | | | 3. ALL DEMOLITION WORK SHALL CONFORM TO THE | | | REQUIREMENTS OF NFPA 241. TRASH AND CONSTRUCTION DEBRIS | | | SHALL BE REMOVED FROM THE SITE DAILY. | | | | | | | | | DERRICK L. DANIELS, BATTALION CHIEF / FIRE MARSHAL | | | WEST PALM BEACH FIRE RESCUE | | | OFFICE OF THE FIRE MARSHAL | | | (561) 804-4709 | | | [email protected] | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
F |
Date |
03-01-2013 |
|
|
Cont ID |
|
| Sent By |
ddaniels |
Date |
12-11-2012 |
Time |
09:10 |
Rev Time |
0.00 |
| Received By |
ddaniels |
Date |
12-11-2012 |
Time |
09:10 |
Sent To |
|
|
| Notes |
| 2013-03-01 08:18:42 | 1. DESIGN SHALL CONFORM TO THE 2010 EDITION OF THE | | | FLORIDA FIRE PREVENTION CODE WHICH CONTAINS THE FLORIDA | | | EDITION OF NFPA 1 AND NFPA 101. | | | | | | 2. SEPARATE PLANS AND PERMITS ARE REQUIRED FOR THE | | | INSTALLATION OR MODIFICATION OF THE FIRE SPRINKLER | | | SYSTEM AND/OR FIRE ALARM SYSTEM. | | | | | | 3. ALL DEMOLITION WORK SHALL CONFORM TO THE | | | REQUIREMENTS OF NFPA 241. TRASH AND CONSTRUCTION DEBRIS | | | SHALL BE REMOVED FROM THE SITE DAILY. | | | | | | DERRICK L. DANIELS, BATTALION CHIEF / FIRE MARSHAL | | | WEST PALM BEACH FIRE RESCUE | | | OFFICE OF THE FIRE MARSHAL | | | (561) 804-4709 | | | [email protected] | | | |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
0.00 |
| Received By |
gmihalko |
Date |
12-11-2012 |
Time |
16:11 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
PARK |
PARKING |
| Rev No |
2 |
Status |
P |
Date |
03-01-2013 |
|
|
Cont ID |
|
| Sent By |
ssamuels |
Date |
03-01-2013 |
Time |
12:43 |
Rev Time |
0.00 |
| Received By |
ssamuels |
Date |
03-01-2013 |
Time |
12:42 |
Sent To |
|
|
| Notes |
| 2013-03-01 12:47:31 | DEVELOPER/APPLICANT HAD A MEETING WITH THE PARKING | | | ADMINSTRATOR AND IS ADVISED OF THE METERED PARKING | | | REQUIREMENT FOR METER RENTAL,REMOVAL AND REPLACEMENT | | | PER RESOLUTION NO. 24 - 13. | | | |
|
|
| Review Stop |
PARK |
PARKING |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
POLICE |
POLICE |
| Rev No |
2 |
Status |
P |
Date |
03-28-2013 |
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2013-02-05 15:38:00 | WILL WANT TO SEE THE CONSTRUCTION SITE SECURITY PLAN. | | | AFFIDAVIT WILL NEED TO BE SIGNED AND ON FILE WITH THE | | | POLICE DEPARTMENT FOR THE NO TRESPASS SIGNS. PASSED | | | | | | PLEASE FOLLOW THE ORIGINAL CPTED REVIEW FOR BUILDING | | | SECURITY, PARKING GARAGE, LIGHTING AND ACCESS CONTROL. | | | THERE WILL NEED TO BE ACCESS CONTROL ENTERING THE | | | BUILDING, CCTV WILL NEED TO BE THROUGH OUT THE PUBLIC | | | AREAS OF THE BUILDING. (CARD, MAIL, POOL, BACKSTAIRS | | | LEADING UP TO THE POOL AREA FROM THE STREET, EXERCISE | | | ROOM.) ACCESS CONTROL FOR THE LAUNDRY ROOM FOR | | | EMPLOYEES ONLY. | | | | | | | | | |
|
|
| Review Stop |
POLICE |
POLICE |
| Rev No |
1 |
Status |
F |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
0.00 |
| Received By |
ktucker |
Date |
12-10-2012 |
Time |
13:45 |
Sent To |
|
|
| Notes |
| 2012-12-12 11:26:56 | CONDITIONS FOR APPROVAL | | | PRIOR TO ISSUANCE OF THE FIRST BUILDING PERMIT, THE | | | APPLICANT SHALL PREPARE A CONSTRUCTION SITE SECURITY | | | AND MANAGEMENT PLAN FOR APPROVAL BY THE CITY OF WEST | | | PALM BEACH POLICE DEPARTMENT CPTED OFFICIAL. OFC. | | | CARSILLO (561) 822-1620 | | | A. AFTER SITE CLEARING AND PLACEMENT OF CONSTRUCTION | | | TRAILERS, THE DEVELOPER/PROJECT MANAGER SHALL INSTITUTE | | | SECURITY MEASURES TO REDUCE OR ELIMINATE OPPORTUNITIES | | | FOR THEFT. THE MANAGEMENT PLAN SHALL INCLUDE, BUT NOT | | | BE LIMITED TO, TEMPORARY LIGHTING, SECURITY PERSONNEL, | | | VEHICLE BARRIERS, CONSTRUCTION/VISITOR PASS, | | | REDUCE/MINIMIZE ENTRY/EXIT POINTS, ENCOURAGE | | | SUBCONTRACTORS TO SECURE MACHINERY, TOOLS AT END OF | | | WORK DAY, FENCING WITH SCREENING AND OR ANY OTHER | | | MEASURE DEEMED APPROPRIATE TO PROVIDE A SAFE AND SECURE | | | WORKING ENVIRONMENT. | | | B. THE SECURITY MANAGEMENT PLAN SHALL BE MAINTAINED | | | THROUGHOUT THE CONSTRUCTION PHASE OF THE PROJECT. | | | NON-COMPLIANCE WITH THE APPROVED PLAN SHALL RESULT IN A | | | STOP-WORK ORDER FOR THE ENTIRE PLANNED UNIT | | | DEVELOPMENT. | | | C. PROPERTY SHALL BE POST ?NO TRESPASSING? SIGNS EVERY | | | 500 FEET AROUND THE PERIMETER OF THE SITE. | | | | | | PARKING GARAGE | | | | | | * WILL THERE BE ACCESS CONTROLLED GATES AT THE GARAGE | | | ENTRANCE? | | | * BIKE PEN NEEDS TO BE WELL LIT, CCTV, OR FENCED/GATED | | | FOR RESIDENTS ONLY | | | | | | A. PARKING GARAGE FIRST LEVEL SHALL HAVE RESTRICTED | | | ACCESS FROM EXTERIOR COMMON GROUND AREA. | | | B. GROUND LEVEL PEDESTRIAN EXITS THAT OPEN INTO | | | NON-SECURE AREAS SHALL BE EMERGENCY EXITS ONLY AND | | | FITTED WITH PANIC BAR HARDWARE. | | | C. CENTER OF THE GARAGE SHALL HAVE CONNECTIVITY TO ALL | | | CROSSWALKS. | | | D. DIRECTIONAL ARROWS AND SIGNAGE INDICATING EXITS, | | | STAIRS, AND ELEVATORS SHALL BE PROVIDED. | | | E. PEDESTRIAN ENTRANCES SHALL BE ADJACENT TO VEHICLE | | | ENTRANCES, OPEN AND FREE OF HIDDEN SPACES AND WIRED FOR | | | CCTV SURVEILLANCE. | | | F. PUBLIC AND PRIVATE PARKING SPACES SHALL BE | | | DESIGNATED. | | | G. WALLS AND SUPPORT STRUCTURES SHALL ALL BE | | | CONSTRUCTED WITH OPEN SIDES TO AVOID CREATION OF HIDDEN | | | SPACES. | | | H. ACCESS POINTS TO THE FACILITY SHALL BE MINIMIZED. | | | I. CEILINGS AND SOLID WALLS IN THE PARKING GARAGE SHALL | | | BE PAINTED WHITE TO INCREASE BRIGHTNESS WITHIN THE | | | FACILITY. | | | J. CONVEX MIRRORS SHALL BE INSTALLED IN STAIRWELL AND | | | ELEVATOR AREAS. | | | K. UTILIZE SECURITY VISION DOORS AT ENTRANCE TO | | | STAIRWELLS ON EACH FLOOR. | | | L. STAIRWELLS SHOULD BE WELL LIT OR HAVE AN OPEN DESIGN | | | M. LIGHTING SHOULD BE PLACED WHERE USERS REQUIRE | | | LIGHTS: OVER VEHICLES, STAIRWELLS, CCTVCAMERAS. | | | N. LIGHTING FIXTURES SHOULD BE EXTENDED PAST THE BEAMS | | | IN THE GARAGE CEILING | | | | | | | | | | | | | | | ADDRESSING/ APARTMENT SECURITY | | | | | | * WILL THE LOBBY BE MANNED? IF NO THERE WILL NEED TO BE | | | ACCESS CONTROL INTO THE BUILDING FROM THE STREET AND | | | FROM THE PARKING GARAGE. (ELEVATOR, DOORS, STAIRWELLS) | | | * POOL WILL NEED ACCESS CONTROL FOR RESIDENTS ONLY, | | | CCTV, BACK STAIRS LEADING UP TO THE POOL AREA FROM THE | | | STREET WILL BE GATED WITH ACCESS CONTROL. | | | * THE CARD ROOM, MAIL ROOM, EXERCISE ROOM AND WORKROOM | | | SHALL HAVE WINDOWS THAT LOOK OUT INTO THE MAIN FLOOR. | | | * LAUNDRY ROOM, ACCESS CONTROL FOR EMPLOYEES ONLY | | | | | | A. ILLUMINATION FOR NIGHTTIME VISIBILITY IS REQUIRED. | | | ADDRESS SHOULD BE PLACED UNDER A LIGHT FIXTURE OR BE | | | BACK LIT. | | | B. ADDRESS NUMERALS SHALL BE OF A CONTRASTING COLOR TO | | | THE BUILDING COLOR | | | C. BI-DIRECTIONAL VISIBILITY FROM THE ROADWAY IS | | | REQUIRED. | | | D. DOOR LEADING INTO A RESIDENTIAL UNIT, SHALL BE SOLID | | | CORE. | | | E. EXTERIOR DOORS SHALL BE EQUIPPED WITH A 180-DEGREE | | | PEEPHOLE AND NON-REMOVABLE SECURITY HINGES. | | | H. ANTI-LIFTING AUXILIARY LOCKS SHALL BE INSTALLED ON | | | SLIDING DOORS AND WINDOWS. | | | I. ALL DOORS SHALL BE EQUIPPED WITH SINGLE CYLINDER | | | DEAD BOLT LOCK WITH A MINIMUM THROW OF ONE INCH AND AN | | | EMBEDMENT OF NOT LESS 5/8 INCH INTO THE HOLDING DEVICE. | | | PICK PLATES SHOULD ALSO BE PLACED ALL EXTERIOR DOORS. | | | | | | | | | | | | | | | | | | | | | | | | |
|
|
| Review Stop |
PW |
PUBLIC WORKS |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
3 |
Status |
P |
Date |
03-11-2013 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
03-11-2013 |
Time |
14:52 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2013-03-11 14:56:44 | COMMENTS FROM SECOND ROUND OF REVIEW NOT ADDRESSED: | | | 1. RESPONSE TO FIRST ROUND OF COMMENTS INDICATED: | | | A. ENGINEERING CALCULATIONS WILL BE SUBMITTED WITH | | | ENGINEERING PERMIT SUBMITTAL. | | | B. SFWMD ERP OR EXEMPTION LETTER WILL BE PROVIDED | | | BEFORE START OF CONSTRUCTION. | | | C. EROSION CONTROL PLAN AND SWPPP WILL BE PROVIDED WITH | | | ENGINEERING PERMIT AND EXCAVATION PERMIT SUBMITTALS. | | | POLLUTION PREVENTION PLAN (PPP) INCLUDED WITH THIS | | | SUBMITTAL. ON THE PPP: | | | - AVOID THE USE OF HAY BALES WITHIN THE PUBLIC | | | RIGHT-OF-WAY | | | - MOST NOTES REGARDING APPROVAL FROM COUNTY SHOULD BE | | | CHANGED TO APPROVAL FROM CITY. | | | 2. RESPONSE TO FIRST ROUND OF COMMENTS AND NOTE ON SITE | | | PLAN INDICATE SIDEWALK EASEMENT ALONG WEST PROPERTY | | | LINE WOULD BE SHOWN ON THE PLAT. THE PLAT DOES NOT SHOW | | | THIS PROPOSED EASEMENT. | | | 3. CONNECT ROOF DRAINS INTO ONSITE DRAINAGE SYSTEM. | | | 4. AVOID PUTTING WATER METERS IN SIDEWALK. | | | |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
2 |
Status |
P |
Date |
02-11-2013 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
02-11-2013 |
Time |
07:14 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2013-02-11 07:44:56 | 1. RESPONSE TO FIRST ROUND OF COMMENTS INDICATED: | | | A. ENGINEERING CALCULATIONS WILL BE SUBMITTED WITH | | | ENGINEERING PERMIT SUBMITTAL. | | | B. SFWMD ERP OR EXEMPTION LETTER WILL BE PROVIDED | | | BEFORE START OF CONSTRUCTION. | | | C. EROSION CONTROL PLAN AND SWPPP WILL BE PROVIDED WITH | | | ENGINEERING PERMIT AND EXCAVATION PERMIT SUBMITTALS. | | | POLLUTION PREVENTION PLAN (PPP) INCLUDED WITH THIS | | | SUBMITTAL. ON THE PPP: | | | - AVOID THE USE OF HAY BALES WITHIN THE PUBLIC | | | RIGHT-OF-WAY | | | - MOST NOTES REGARDING APPROVAL FROM COUNTY SHOULD BE | | | CHANGED TO APPROVAL FROM CITY. | | | 2. RESPONSE TO FIRST ROUND OF COMMENTS AND NOTE ON SITE | | | PLAN INDICATE SIDEWALK EASEMENT ALONG WEST PROPERTY | | | LINE WOULD BE SHOWN ON THE PLAT. THE PLAT DOES NOT SHOW | | | THIS PROPOSED EASEMENT. | | | 3. CONNECT ROOF DRAINS INTO ONSITE DRAINAGE SYSTEM. | | | 4. AVOID PUTTING WATER METERS IN SIDEWALK. | | | |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
1 |
Status |
F |
Date |
12-10-2012 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
12-10-2012 |
Time |
14:45 |
Rev Time |
|
| Received By |
tward |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2012-12-10 14:48:30 | 1. CONCEPTUAL CIVIL PLAN AND CONCEPTUAL DEMOLITION PLAN | | | NOT SIGNED AND SEALED. | | | 2. NO DRAINAGE CALCULATIONS PROVIDED. | | | 3. PROVIDE PROPOSED FINISHED FLOOR ELEVATIONS FOR FIRST | | | (GARAGE) AND SECOND FLOORS. | | | 4. PROVIDE DETAILS OF EXFILTRATION TRENCH. | | | 5. SFWMD ERP OR EXEMPTION LETTER REQUIRED BEFORE START | | | OF CONSTRUCTION/DEMOLITION. | | | 6. EROSION CONTROL PLAN AND STORM WATER POLLUTION | | | PREVENTION PLAN REQUIRED WITH ENGINEERING PERMIT | | | APPLICATION. | | | 7. HOW WILL GARAGE DRAIN? | | | 8. NORTH STAIRWELL IN CONFLICT WITH EXISTING POWER POLE | | | AND OVERHEAD WIRES. | | | 9. WITH THE PROPOSED INSTALLATION OF THE TREE GRATES, A | | | SIDEWALK EASEMENT NEEDED ALONG THE WEST SIDE OF | | | BUILDING. | | | 10. DIFFERENT OWNERS LISTED FOR EASTERN-MOST LOT AND | | | THE OTHER FOUR LOTS, NEITHER OF WHICH IS THE APPLICANT. | | | | | | TRACY L. WARD, P.E. | | | SENIOR STORM WATER ENGINEER | | | ENGINEERING AND PUBLIC WORKS DEPARTMENT | | | 561-494-1120 |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2012-12-06 13:42:25 | 1. SIDEWALK ALONG SAPODILLA DOES NOT MATCH SURVEY. | | | 2. ADD RIGHT-OF-LINES TO ALL ELEVATIONS. IT APPEARS | | | THAT THERE MAY BE SOME AERIAL ENCROACHMENTS WHICH WILL | | | REQUIRE AN EASEMENT. | | | 3. ANY UNDERGROUND ENCROACHMENT BY FOOTERS WILL REQUIRE | | | AN EASEMENT. IF SO, TOP OF FOOTERS ARE REQUIRED TO BE | | | 6.0' BELOW GRADE. | | | 4. HOW IS SANITATION PROPOSED TO BE HANDLED? |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
2 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
02-01-2013 |
Time |
|
Rev Time |
0.00 |
| Received By |
bcollins |
Date |
02-01-2013 |
Time |
08:07 |
Sent To |
|
|
| Notes |
| 2013-02-01 08:09:24 | COMMENTS ADDRESSED. PASSED CONDITIONAL ON PROVIDING | | | STRIPED BULB OUT AND SAFETY ZONE BETWEEN SITE DRIVEWAY | | | AND FIRST PARKING SPACE TO WEST ON EVERNIA. |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
1 |
Status |
F |
Date |
12-11-2012 |
|
|
Cont ID |
|
| Sent By |
|
Date |
12-11-2012 |
Time |
|
Rev Time |
0.00 |
| Received By |
bcollins |
Date |
12-11-2012 |
Time |
09:20 |
Sent To |
|
|
| Notes |
| 2012-12-11 09:30:15 | FIRST 2 ANGLE PARKING SPACES WEST OF SITE ENTRANCE | | | SHOULD BE REMOVED TO PROVIDE ADEQUATE RIGHT TURN EGRESS | | | FROM THE SITE. THIS WOULD ALSO MITIGATE POTENTIAL | | | CONFLICTS BETWEEN VEHICLES LEAVING THE SITE AND | | | VEHICLES BACKING OUT OF THESE PARKING SPACES. WHILE THE | | | CITY CODE ALLOWS ON-STREET PARKING TO BE COUNTED TOWARD | | | PARKING REQUIREMENTS, APPLICANT SHOULD DESCRIBE HOW THE | | | METERED SPACES WILL BE UTILIZED BY RESIDENTS AS THERE | | | IS A PARKING SHORTFALL ON SITE. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
4 |
Status |
P |
Date |
03-28-2013 |
|
|
Cont ID |
|
| Sent By |
aaponte |
Date |
03-28-2013 |
Time |
10:43 |
Rev Time |
0.00 |
| Received By |
aaponte |
Date |
03-28-2013 |
Time |
10:43 |
Sent To |
|
|
| Notes |
| 2013-03-28 10:44:16 | STIE PLAN APPROVED WITH CONDITIONS |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
3 |
Status |
F |
Date |
02-28-2013 |
|
|
Cont ID |
|
| Sent By |
aaponte |
Date |
02-28-2013 |
Time |
08:39 |
Rev Time |
0.00 |
| Received By |
aaponte |
Date |
02-28-2013 |
Time |
08:39 |
Sent To |
|
|
| Notes |
| 2013-02-28 10:29:16 | 1. PLEASE PROVIDE INFORMATION TO CONFIRM THE NEW GRADE | | | FOR THE ENTRANCE ALONG EVERNIA STREET IS NOT AFFECTING | | | THE ROW ELEVATION ALONG THE SIDEWALK, ACCORDING TO THE | | | SURVEY THE BACK OF SIDEWALK ELEVATION IS 40.83' AND THE | | | BUILDING FINISHED FLOOR IS AT 43'. THE SIDEWALK | | | CROSSLOPE CANNOT EXCEED 2%. | | | 2. BIKE RACKS IN FRONT OF LOBBY ARE OK. PROPOSED BIKE | | | RACKS INSIDE PARKING GARAGE IS NOT INSTALLED TO | | | PROPERLY ALLOW 6 BIKE SPACES. PLEASE FOLLOW GUIDELINES | | | WITH DIMENSIONS (30" BEWTEEN RACKS, 24" SEPARATION FROM | | | WALLS OR OTHER OBSTRUCTIONS. PLEASE SEE GUIDELINES | | | PROVIDED). | | | 3. PLEASE CORRECT THE HATCH ON ALL FLOOR PLANS TO | | | ACCURATELY REFLECT THE FAR CALCULATIONS (HATCH ONLY | | | AREAS NOT INCLUDED IN THE FAR). STAIRS AND ELEVATOR | | | WITHIN THE PARKING LEVEL SHALL BE INCLUDED IN THE FAR, | | | PLEASE ADJUST TABLE TO REFLECT. | | | 4. ALL MECHANICAL EQUIPMENT SHALL BE ENCLOSED AND | | | SCREENED AS AN INTEGRAL PART OF THE BUILDING DESIGN AS | | | REQUIRED BY THE DAC SPECIAL REVIEW APPROVAL. THE | | | PROPOSED PARAPET WALL SHALL SCREEN THE EQUIPMENT FROM | | | THE VIEW OF A PERSON AT GROUND LEVEL. ADDITIONAL | | | SCREENING SHALL BE PROVIDED FOR AERIAL VIEW. AS THE | | | EQUIPMENT IS LOW A ROOF-LIKE SCREEN WILL MEET THE | | | INTENT OF THE CODE. | | | 5. THE TREE CANOPY REQUIRED FOR THE PRIVATE OPEN SPACE | | | SHALL BE PROVIDED WITHIN THE PRIVATE OPEN SPACE. THE | | | REQUIRED PRIVATE OPEN SPACE CALCULATION SHALL NOT | | | INCLUDE THE GRASSED AREA ADJACENT TO THE ALLEY. | | | 6. PROPOSED LANDSCAPE AREA WITHIN THE 5TH FLOOR ROOF | | | TOP TERRACE CAN BE ENHANCED TO AT LEAST MEET 50% OF THE | | | VEGETATED AREA REQUIRED FOR A PRIVATE OPEN SPACE. | | | ADDITIONAL PLANER BOXES ARE SUGGESTED. | | | 7. PLEASE UPDATE THE FACADES TO REFLECT THE CHANGES IN | | | THE BUILDING ENTRANCE. | | | FOR ADDITIONAL INFORMATION PLEASE CONTACT ANA MARIA | | | APONTE AT 561-822-1439. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2013-01-30 10:16:31 | 1. STAIRS AND RAISED PLANTERS ADJACENT TO THE MAIN | | | ENTRANCE ALONG EVERNIA STREET ENCROACH INTO THE ROW. | | | STAIRS SHALL BE MOVED INSIDE THE PROPERTY LINE. RAISED | | | PLANTERS CAN BE CHANGED TO PLANTING BEDS. | | | 2. BIKE RACKS LOCATED NEXT TO THE BUILDING ENTRANCE DO | | | NOT COMPLY WITH THE MINIMUM INSTALLATION STANDARDS. | | | 3. PLEASE ADJUST THE BUILDING TABLE ON SHEET SPA-3 TO | | | ACCURATELY REFLECT THE PERCENTAGE OF ACTIVE USES | | | PROVIDED ALONG EVERNIA STREET (NON-ACTIVE USES INCLUDE | | | USES SUCH AS PARKING, STORAGE, MECHANICAL, ELECTRICAL). | | | 4. PLEASE INCLUDE THE TOTAL GROSS BUILDING AREA | | | ACCORDING TO THE DEFINITION INCLUDED IN SECTION 94-109 | | | OF THE ZLDR IN THE BUILDING TABLE. TABLE SHALL INCLUDE | | | ALSO THE GROSS BUILDING AREA FOR EACH FLOOR AND | | | MECHANICAL AREA FOR EACH FLOOR. | | | 5. PLEASE ADJUST THE GRAPHICS THAT DEPICT AREAS COUNTED | | | AS GROSS BUILDING AREA BASED ON THE DEFINITION ON | | | SECTION 94-109 OF THE ZLDR. | | | 6. AIR RIGHT EASEMENT WILL BE REQUIRED FOR THE | | | BALCONIES ENCROACHING INTO THE ROW. | | | 7. PLEASE INDICATE THE USE OF THE ENCLOSED ROOM ON THE | | | ROOF. | | | 8. PLEASE PROVIDE A GRAPHIC THAT INDICATES HOW THE | | | COMPLIANCE WITH THE PLANAR BREAK CALCULATION WAS | | | ACHIEVED. TABLE IV-4 REQUIRES "FOR BULDING FRONTAGES | | | GREATER THAN 150', NO FACADE SHALL EXCEED 60% OF THE | | | BUILDING FRONTAGE WITHOUT PROVIDING A PLANAR BREAK OF | | | MULTIPLE PLANAR BREAKS A MINIMUM OF 3' EN DEPTH. THE | | | CUMULATIVE HOTIZONTAL LENGHT OF ALL PLANAR BREAKS SHALL | | | BE REATER THAN OR EQUAL TO 20% OF THE BUILDING | | | FRONTAGE." THE PLANAR BREAK SHALL OCCUR FOR THE FULL | | | HEIGHT OF THE PODIUM. | | | 9. PUMP ROOM DOOR ON WEST ELEVATION IS LANDING OVER 2 | | | FEET ABOVE THESIDEWALK GRADE. | | | 10. ALL MECHANICAL EQUIPMENT SHALL BE ENCLOSED AND | | | SCREENED AS AN INTEGRAL PART OF THE BUILDING DESIGN AS | | | REQUIRED BY THE DAC SPECIAL REVIEW APPROVAL. | | | 11. | | | LANDSCAPE COMMENTS: | | | 1. JAPANESE PRIVET IDENTIFIED AS THE MEDIUM TREES | | | REQUIRED FOR THE VEGETATED AREA COVERAGE IS NOT LOCATED | | | WITHIN THE ROOFTOP GARDEN. | | | 2. THE PLANT SCHEDULE DOES NOT ACCURATELY REFLECT THE | | | EXACT NUMBER OF ALEXANDER PALMS DEPICTED IN THE | | | DRAWINGS (10 SHOWN, 5 LISTED). | | | 3. LANDSCAPE PLANS SHALL BE PROVIDED FOR THE ROOFTOP | | | TERRACE LOCATED AT THE 6TH LEVEL ACCORDING TO DAC | | | SPECIAL REVIEW APPROVAL. | | | | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
12-05-2012 |
|
|
Cont ID |
|
| Sent By |
aaponte |
Date |
12-05-2012 |
Time |
16:15 |
Rev Time |
0.00 |
| Received By |
aaponte |
Date |
12-04-2012 |
Time |
12:03 |
Sent To |
|
|
| Notes |
| 2012-12-04 12:23:36 | 1. PLEASE INCLUDE A TABLE AND A SCHEMATIC GRAPHIC OF | | | EACH FLOOR INDICATING THE AREAS CALCULATED AS PART OF | | | THE GROSS BUILDING AREA. | | | 2. PROPOSED BUILDING IS ENCROACHING INTO THE 20' SIDE | | | SETBACK REQUIRED ABOVE THE 5TH STORY (STAIRS). | | | 3. PROPOSED PARKING RAMP IS ENCROACHING INTO THE FIVE | | | FEET REQUIRED LANDSCAPE BUFFER ON THE EAST SIDE.THE | | | VEHICULAR ACCESS IS REQUIRED TO PROVIDE A 5 FEET | | | LANDSCAPE BUFFER. | | | 4. TWO STORY STORAGE BUILDING SEEMS TO ENCROACH INTO | | | THE FIVE FEET REQUIRED REAR SETBACK AT THE PARKING | | | LEVEL. | | | 5. RESIDENTIAL USES ARE NOT PERMITTED IN THE 1ST FLOOR. | | | THE 2ND FLOOR WILL BE CONSIDERED ANYTHING ABOVE 5 FEET | | | GRADE FLOOR ELEVATION. | | | 6. PLEASE INCLUDE INFORMATION TO CONFIRM COMPLIANCE | | | WITH THE PLANAR BREAK AND HORIZONTAL PROJECTIONS | | | REGULATION ACCORDING TO TABLE IV-4. | | | 7. PLEASE PROVIDE ADDITIONAL INFORMATION ON THE FIRST | | | FLOOR PLAN TO INDICATE THE TERRACES, LOCATION OF LOW | | | WALLS AND PLANTING AREAS IN RELATION WITH WINDOWS AND | | | DOORS. | | | 8. RENDER INCLUDED WITH SUBMITTAL DOES NOT ACCURATELY | | | REFLECT THE PROPOSED FLOOR PLAN, PLEASE REVISE. | | | 9. PLEASE INCLUDE PROPERTY LINE AND SETBACK LINE ON ALL | | | FLOOR PLANS AND ELEVATIONS. | | | 10. STAFF HAS CONCERNS WITH THE LOCATION OF THE BIKE | | | PARKING. IT MAY BE DIFICULT FOR ELDERLY RESIDENTS TO | | | RIDE THE BIKE TO THE STREET LEVEL. A LOCATION WITHIN | | | THE FIRST FLOOR WOULD BE PREFERABLE. | | | 11 PLEASE INCLUDE SPECS FOR THE BIKE RACK AND | | | INSTALLATION DETAILS. | | | 12. PLEASE SUBMIT INFORMATION REGARDING UNIT SIZE TO | | | CONFIRM COMPLIANCE WITH MINIMUM UNIT SIZE AND AVERAGE | | | UNIT SIZE ACCORDING TO SECTION 94-109. | | | 13. PLEASE INCLUDE A TABLE INDICATING THE AMOUNT OF | | | TDRS REQUIRED FOR THE PROJECT. | | | 14. PLEASE INCLUDE INFORMATION TO CONFIRM COMPLIANCE | | | WITH MAXIMUM BUILDING FOOTPRINT, MINIMUM ACTIVE USES | | | AND MINIMUM TRANSPARENCY FOR ACTIVE USES (TABLE IV-44) | | | | | | STREETSCAPE COMMENTS: | | | 1. STREET LIGHTING SHALL BE PROVIDED ACOORDING TO | | | SECTION 94-113(D)(4). | | | 2. EXISTING OVERHEAD POWERLINES SHALL BE BURIED FOR A | | | PROJECT THIS SIZE. | | | 3. ONCE POWER LINES ARE REMOVED STREET TREES CAN BE | | | CHANGED TO LIVE OAKS. | | | 4. STREETSCAPE ALONG SAPODILLA AVENUE SHALL BE CHANGED | | | TO MEET THE EXISTING STREETSCAPE SOUTH OF EVERNIA | | | STREET (GRASS STRIP NEXT TO THE CURB). | | | | | | PROCESSING COMMENTS | | | 1. IF UTILIZING THE AFFORDABLE HOUSING INCENTIVE, THE | | | PROJECT SHALL BE PRESENTED TO THE CITY COMMISSION FOR | | | APPROVAL OF TDRS. PLEASE SUBMIT A FORMAL LETTER | | | REQUESTING THE AMOUNT OF TRD NEEDED. | | | 2. DUE TO THE APPLICATION FOR THE AFFORDABLE HOUSING | | | INCENTIVE PROGRAM, THE PROJECT IS REQUIRED IS SUBJECT | | | TO DAC SPECIAL REVIEW. AN APPLICATION WILL BE NECESSARY | | | ONCE THE MAIN COMMENTS FROM PPRC ARE ADDRESSED. | | | | | | FOR ADDITIONAL INFORMATION PLEASE CONTACT ANA MARIA | | | APONTE AT 561-822-1439 | | | | | | |
|
|
| |
Print |