| Plan Review Stops For Project Z12070018 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
08-07-2012 |
|
|
Cont ID |
|
| Sent By |
lmartine |
Date |
08-07-2012 |
Time |
16:20 |
Rev Time |
0.00 |
| Received By |
|
Date |
09-20-2012 |
Time |
15:08 |
Sent To |
|
|
| Notes |
| 2012-08-07 16:40:37 | BUILDING REVIEW COMMENTS | | | | | | | | | PLEASE SEE 2010 FLORIDA BUILDING CODE. | | | | | | THE PLANS WERE REVIEWED AS ONE BUILDING. | | | | | | CHAPTER 3 DEFINES YOUR PROPOSED USE AS R-4. | | | | | | CHAPTER 5 WILL REGULATE THE ALLOWABLE HEIGHT AND AREA, | | | PLEASE SEE TYPE 1B OR 3B AND 504.2 FOR ANY HEIGHT | | | INCREASES. | | | | | | TABLE 601 WILL DETERMINE THE FIRE RESISTANCE (HOUR) | | | RATINGS FOR YOUR BUILDING ELEMENTS. | | | | | | | | | | | | | | | LUIS MARTINEZ | | | 561-805-6710 |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
3 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
2 |
Status |
F |
Date |
11-05-2012 |
|
|
Cont ID |
|
| Sent By |
bmoree |
Date |
11-05-2012 |
Time |
|
Rev Time |
0.00 |
| Received By |
bmoree |
Date |
11-05-2012 |
Time |
|
Sent To |
|
|
| Notes |
| 2012-11-05 15:39:18 | 1. SPECIFIC COMMENTS ARE NOT AVAILABLE UNTIL CIVIL SITE | | | DRAWINGS ARE SUBMITTED TO THE ENGINEERING SERVICES & | | | PUBLIC WORKS DEPARTMENT FOR FORMAL REVIEW. | | | 2. A STORMWATER POLLUTION PREVENTION PLAN (SWPPP) WILL | | | BE REQUIRED PRIOR TO COMMENCEMENT OF SITE WORK. | | | 3. A RIGHT-OF-WAY PERMIT WILL BE REQUIRED FOR ALL | | | PROJECT RELATED WORK IN THE ADJACENT PUBLIC | | | RIGHT-OF-WAY. | | | 4. SOLID WASTE COLLECTION TRAFFIC CIRCULATION IS | | | OBSTRUCTED BY THE BUILDING FOR THE EAST PARKING EXIT. | | | CURRENT DUMPSTER LOCATION REQUIRES MULTI-POINT TURN FOR | | | EXITING. DUMPSTER RELOCATION AND/OR DEDICATED | | | TURN-AROUND AREA REQUIRED. | | | | | | BRIAN R. MOREE, MPA, FCHP | | | ENGINEERING CONSTRUCTION MANAGER | | | CONSTRUCTION ADMINISTRATION | | | ENGINEERING SERVICES & PUBLIC WORKS DEPARTMENT | | | 401 CLEMATIS STREET | | | FOURTH FLOOR | | | WEST PALM BEACH, FLORIDA 33401 | | | OFFICE: 561-494-1098 | | | MOBILE: 561-644-7270 | | | EMAIL: [email protected] | | | WEB: WWW.WPB.ORG/ENGINEERING | | | |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
1 |
Status |
F |
Date |
08-08-2012 |
|
|
Cont ID |
|
| Sent By |
bmoree |
Date |
08-08-2012 |
Time |
12:52 |
Rev Time |
0.00 |
| Received By |
bmoree |
Date |
08-08-2012 |
Time |
|
Sent To |
|
|
| Notes |
| 2012-08-08 12:52:17 | 1. SPECIFIC COMMENTS ARE NOT AVAILABLE UNTIL CIVIL SITE | | | DRAWINGS ARE SUBMITTED TO THE ENGINEERING SERVICES & | | | PUBLIC WORKS DEPARTMENT FOR FORMAL REVIEW. | | | 2. A STORMWATER POLLUTION PREVENTION PLAN (SWPPP) WILL | | | BE REQUIRED PRIOR TO COMMENCEMENT OF SITE WORK. | | | 3. A RIGHT-OF-WAY PERMIT WILL BE REQUIRED FOR ALL | | | PROJECT RELATED WORK IN THE ADJACENT PUBLIC | | | RIGHT-OF-WAY. | | | 4. DUMPSTER LOCATION NEEDS TO BE RECOFIGURE FOR ONSITE | | | PICK-UP. | | | | | | BRIAN R. MOREE, MPA, FCHP | | | ENGINEERING CONSTRUCTION MANAGER | | | CONSTRUCTION ADMINISTRATION | | | ENGINEERING SERVICES & PUBLIC WORKS DEPARTMENT | | | 401 CLEMATIS STREET | | | FOURTH FLOOR | | | WEST PALM BEACH, FLORIDA 33401 | | | OFFICE: 561-494-1098 | | | MOBILE: 561-644-7270 | | | EMAIL: [email protected] | | | WEB: WWW.WPB.ORG/ENGINEERING | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
3 |
Status |
P |
Date |
10-19-2012 |
|
|
Cont ID |
|
| Sent By |
ddaniels |
Date |
10-19-2012 |
Time |
13:10 |
Rev Time |
0.00 |
| Received By |
ddaniels |
Date |
10-19-2012 |
Time |
13:10 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
F |
Date |
09-11-2012 |
|
|
Cont ID |
|
| Sent By |
ddaniels |
Date |
09-11-2012 |
Time |
17:52 |
Rev Time |
0.00 |
| Received By |
ddaniels |
Date |
09-11-2012 |
Time |
17:52 |
Sent To |
|
|
| Notes |
| 2012-09-11 17:57:51 | 09/11/2012 PLANS REVIEWED BY FIRE ***DENIED*** | | | | | | FIRE COMMENTS HAVE NOT BEEN ADDRESSED. SECOND REVIEW | | | | | | | | | DERRICK L. DANIELS, BATTALION CHIEF | | | WEST PALM BEACH FIRE RESCUE | | | OFFICE OF THE FIRE MARSHAL | | | (561) 804-4709 | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
F |
Date |
07-30-2012 |
|
|
Cont ID |
|
| Sent By |
ddaniels |
Date |
07-30-2012 |
Time |
23:17 |
Rev Time |
0.00 |
| Received By |
|
Date |
08-02-2012 |
Time |
14:13 |
Sent To |
|
|
| Notes |
| 2012-07-30 23:28:35 | 7/30/12 PANS REVIEWED BY FIRE **DENIED** | | | | | | 1. SHOW SCOPE OF WORK ON PLANS. | | | | | | 2. DESIGN SHALL CONFORM TO THE 2010 EDITION OF THE | | | FLORIDA FIRE PREVENTION CODE WHICH CONTAINS THE FLORIDA | | | EDITION OF NFPA 1 AND NFPA 101. | | | | | | 3. ALL DEMOLITION WORK SHALL CONFORM TO THE | | | REQUIREMENTS OF NFPA 241. TRASH AND CONSTRUCTION DEBRIS | | | SHALL BE REMOVED FROM THE SITE DAILY. | | | | | | 4. SEPARATE PLANS AND PERMITS ARE REQUIRED FOR THE | | | INSTALLATION OR MODIFICATION OF THE FIRE SPRINKLER | | | SYSTEM AND/OR FIRE ALARM SYSTEM. | | | | | | 5. PROVIDE A LIFE SAFETY PLAN SHOWING ALL OCCUPANCY | | | TYPES, OCCUPANT LOADS, FIRE RATED WALLS, EXIT SIGNS, | | | EMERGENCY LIGHTING, TRAVEL DISTANCES, COMMON PATH OF | | | TRAVEL ETC. | | | | | | | | | | | | DERRICK L. DANIELS, BATTALION CHIEF | | | WEST PALM BEACH FIRE RESCUE | | | OFFICE OF THE FIRE MARSHAL | | | (561) 805-6733 | | | |
|
|
| Review Stop |
PARK |
PARKING |
| Rev No |
3 |
Status |
N |
Date |
10-23-2012 |
|
|
Cont ID |
|
| Sent By |
ssamuels |
Date |
10-23-2012 |
Time |
17:58 |
Rev Time |
0.00 |
| Received By |
ssamuels |
Date |
10-23-2012 |
Time |
17:57 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
PARK |
PARKING |
| Rev No |
2 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
PARK |
PARKING |
| Rev No |
1 |
Status |
F |
Date |
08-08-2012 |
|
|
Cont ID |
|
| Sent By |
ssamuels |
Date |
08-08-2012 |
Time |
11:57 |
Rev Time |
0.00 |
| Received By |
ssamuels |
Date |
08-08-2012 |
Time |
11:56 |
Sent To |
|
|
| Notes |
| 2012-08-08 11:58:40 | PLEASE PROVIDE PARKING DETAIL SPECIFICATION | | | | | | HANDICAP LOGO | | | HANDICAP SIGN |
|
|
| Review Stop |
POLICE |
POLICE |
| Rev No |
3 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
POLICE |
POLICE |
| Rev No |
2 |
Status |
P |
Date |
09-20-2012 |
|
|
Cont ID |
|
| Sent By |
|
Date |
09-20-2012 |
Time |
|
Rev Time |
0.00 |
| Received By |
ktucker |
Date |
09-20-2012 |
Time |
15:08 |
Sent To |
|
|
| Notes |
| 2012-09-20 15:06:09 | ALL COMMENTS WERE ADDRESSED AS "WILL COMPLY" NOTHING | | | SHOWN ON THE PLANS | | | WILL BE LOOKING FORT THE CONSTRUCTION SITE SECURITY | | | PLAN |
|
|
| Review Stop |
POLICE |
POLICE |
| Rev No |
1 |
Status |
F |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
08-02-2012 |
Time |
|
Rev Time |
0.00 |
| Received By |
ktucker |
Date |
08-02-2012 |
Time |
14:13 |
Sent To |
|
|
| Notes |
| 2012-08-02 14:15:39 | CARD ACCESS INTO THE BUILDING SHOULD BE USED TO CONTROL | | | ENTRY INTO THE BUILDING FOR RESIDENTS AND EMPLOYEES. | | | VIDEO-CAMERAS SHOULD BE USED TO MONITOR THE PREMISES, | | | THE LIVING ROOM AREAS, DINING ROOM, ENTRY DOORS, | | | ELEVATOR AND STAIRWELL ENTRIES. | | | THE ASSISTED LIVING FACILITY WILL NEED ANY AUXILIARY | | | ENTRANCES LOCKED OR REQUIRE A CARD KEY OR NUMERIC CODE | | | TO GAIN ACCESS. | | | EMERGENCY BUTTONS IN THE APARTMENTS. | | | | | | RESIDENT DOORS SHOULD HAVE PEEPHOLES AND LOCKS THAT ARE | | | EASY TO OPERATE, FOR PATIENTS WHO ARE WEAK OR WHO MAY | | | HAVE ARTHRITIS. | | | | | | ALL DOORS RESIDENT DOORS SHALL BE EQUIPPED WITH SINGLE | | | CYLINDER DEAD BOLT LOCK WITH A MINIMUM THROW OF ONE | | | INCH AND AN EMBEDMENT OF NOT LESS 5/8 INCH INTO THE | | | HOLDING DEVICE. PICK PLATES SHOULD ALSO BE PLACED ALL | | | EXTERIOR DOORS. DOORS LEADING INTO A RESIDENTIAL UNIT | | | SHALL BE SOLID CORE. | | | | | | WILL THERE BE A RECEPTIONIST?S DESK IN BOTH LIVING ROOM | | | AREAS? VISITORS WILL NEED TO CHECK-IN BEFORE SEEING | | | RESIDENTS | | | | | | EXIT DOOR ALARMS OR OTHER SYSTEM MUST BE PROVIDED FOR | | | SECURITY PURPOSES AND TO ALERT STAFF WHEN RESIDENTS | | | EXIT THE FACILITY | | | | | | CONVEX MIRRORS SHALL BE INSTALLED IN STAIRWELL ENABLING | | | VIEWS OF UPPER AND LOWER STAIRWAYS. | | | | | | TIMER CLOCK OR PHOTOCELL SENSOR-ENGAGED LIGHTING FOR | | | ABOVE OR NEAR ENTRYWAYS TO RESIDENCES PROVIDE FOR DUSK | | | TO DAWN OPERATION. | | | | | | ENTRANCE SIGN LIGHTING SHALL BE PROVIDED. DIRECTORY | | | SHOULD BE AT ALL ENTRANCES WITH LIGHTING. | | | | | | BUILDING LIGHTING (NON GLARE) SHALL BE AROUND PERIMETER | | | ON ALL SIDES. | | | | | | NUMERICAL ADDRESS | | | A. ILLUMINATION FOR NIGHTTIME VISIBILITY IS REQUIRED. | | | ADDRESS SHOULD BE PLACED UNDER A LIGHT FIXTURE OR BE | | | BACK LIT. | | | B. ADDRESS NUMERALS SHALL BE OF A CONTRASTING COLOR TO | | | THE BUILDING COLOR | | | C. BI-DIRECTIONAL VISIBILITY FROM THE ROADWAY IS | | | REQUIRED. | | | D. ADDRESS NUMBERS ON DOORS OF MULTI-UNITS AND SINGLE | | | FAMILY HOMES NEED TO BE A MINIMUM OF 6 INCHES HIGH. | | | E. BUILDING NUMBERS FOR MULTI-UNIT BUILDINGS SHALL BE A | | | MINIMUM OF 12 INCHES HIGH AND PLACED IN A CONSPICUOUS | | | LOCATION ON ALL SIDES WITH PUBLIC ACCESS, AWAY FROM | | | LANDSCAPING. | | | | | | 10.1 CONDITIONS FOR APPROVAL | | | PRIOR TO ISSUANCE OF THE FIRST BUILDING PERMIT, THE | | | APPLICANT SHALL PREPARE A CONSTRUCTION SITE SECURITY | | | AND MANAGEMENT PLAN FOR APPROVAL BY THE CITY OF WEST | | | PALM BEACH POLICE DEPARTMENT CPTED OFFICIAL. | | | A.AFTER SITE CLEARING AND PLACEMENT OF CONSTRUCTION | | | TRAILERS, THE DEVELOPER/PROJECT MANAGER SHALL INSTITUTE | | | SECURITY MEASURES TO REDUCE OR ELIMINATE OPPORTUNITIES | | | FOR THEFT. THE MANAGEMENT PLAN SHALL INCLUDE, BUT NOT | | | BE LIMITED TO, TEMPORARY LIGHTING, SECURITY PERSONNEL, | | | VEHICLE BARRIERS, CONSTRUCTION/VISITOR PASS, | | | REDUCE/MINIMIZE ENTRY/EXIT POINTS, ENCOURAGE | | | SUBCONTRACTORS TO SECURE MACHINERY, TOOLS AT END OF | | | WORK DAY, FENCING WITH SCREENING AND OR ANY OTHER | | | MEASURE DEEMED APPROPRIATE TO PROVIDE A SAFE AND SECURE | | | WORKING ENVIRONMENT. | | | B.THE SECURITY MANAGEMENT PLAN SHALL BE MAINTAINED | | | THROUGHOUT THE CONSTRUCTION PHASE OF THE PROJECT. | | | NON-COMPLIANCE WITH THE APPROVED PLAN SHALL RESULT IN A | | | STOP-WORK ORDER FOR THE ENTIRE PLANNED UNIT | | | DEVELOPMENT. | | | C.PROPERTY SHALL BE POST ?NO TRESPASSING? SIGNS EVERY | | | 500 FEET AROUND THE PERIMETER OF THE SITE. | | | | | | | | | |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
3 |
Status |
F |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2012-10-24 07:52:00 | 1. COMPLETE DRAINAGE SYSTEM NOT SHOWN ON LANDSCAPE PLAN | | | (AS-1). | | | 2. SITE PLAN (SHEET C-1) SHOWS CLUSTER OF TWO TREES IN | | | LANDSCAPE AREA WEST OF WEST BUILDING; LANDSCAPE PLAN | | | (SHEET AS-1) SHOWS CLUSTER OF 3 TREES. | | | 3. WILL EXISTING 18" TREE IN HEDGE LINE OF LANDSCAPE | | | AREA WEST OF WEST BUILDING BE AFFECTED BY THE PROPOSED | | | EXFILTRATION TRENCH? SUGGEST USING ROOT BARRIER OR | | | RELOCATING THE EXFILTRATION TRENCH. | | | 4. COMMENTS 5 - 8 FROM FIRST STORMWATER REVIEW STILL | | | VALID (SUBMITTALS WILL BE REQUIRED WITH ENGINEERING | | | PERMIT APPLICATION). | | | | | | TRACY L. WARD, P.E. | | | SENIOR STORM WATER ENGINEER | | | ENGINEERING AND PUBLIC WORKS DEPARTMENT | | | 561-494-1120 |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
2 |
Status |
F |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2012-09-11 08:50:24 | 1. DRAINAGE ON LANDSCAPE PLANS DO NOT MATCH CIVIL | | | PLANS. | | | 2. WIL EXISTING TREES ON WEST SIDE OF WEST BUILDING BE | | | AFFECTED BY THE CONSTRUCTION OF THE DRAINAGE SYSTEM? | | | | | | TRACY L. WARD, P.E. | | | SENIOR STORM WATER ENGINEER | | | ENGINEERING AND PUBLIC WORKS DEPARTMENT | | | (561) 494-1120 | | | |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
1 |
Status |
F |
Date |
08-01-2012 |
|
|
Cont ID |
|
| Sent By |
tward |
Date |
08-01-2012 |
Time |
13:15 |
Rev Time |
0.00 |
| Received By |
tward |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2012-08-01 11:22:08 | 8/1/2012 | | | 1. ARCHITECTURAL GROUND FLOOR SITE PLAN, CIVIL SITE | | | PLAN AND LANDSCAPE PLAN DO NOT MATCH: | | | A. SOUTH AND WEST PARKING SPACES DIFFERENT DIMENSIONS | | | B. WHEEL STOPS SHOWN ON ARCHITECTURAL PLAN | | | C. HANDICAP PARKING ACCESS AISLE LOCATION | | | D. SIDEWALK WIDTH ALONG SOUTH SIDE OF WEST BUILDING | | | E. PALM TREES VS. HEDGE ALONG SOUTH PROPERTY LINE. | | | | | | 2. CIVIL SITE PLAN NOT SIGNED AND SEALED. | | | 3. EXISTING / PROPOSED DRAINAGE SYSTEM NOT SHOWN. | | | 4. PROPOSED GRADING PATTERNS NOT PROVIDED. | | | 5. STORMWATER WATER QUALITY TREATMENT VOLUME TO BE | | | PROVIDED ON SITE (MINIMUM OF 1" OF RUNOFF FROM SITE OR | | | 2.5" RUNOFF TIMES PERCENT IMPERVIOUS). | | | 6. SFWMD ENVIRONMENTAL RESOURCES PERMIT WILL BE NEEDED | | | BEFORE START OF CONSTRUCTION. | | | 7. EROSION CONTROL PLAN WILL BE REQUIRED WITH FINAL | | | ENGINEERING PLANS. | | | 8. DRAINAGE CALCULATIONS WILL BE REQUIRED FOR | | | ENGINEERING PERMITS. | | | | | | TRACY L. WARD, P.E. | | | SENIOR STORM WATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | (561) 494-1120 | | | |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
3 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
2 |
Status |
P |
Date |
09-11-2012 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
09-11-2012 |
Time |
14:08 |
Rev Time |
0.00 |
| Received By |
vnoel |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2012-09-11 14:08:38 | PASSED, BUT WITH PROVISION THAT UNITY OF TITLE PRIOR TO | | | C.O. | | | APPLICATION IS TO BE MADE THROUGH AND APPROVED BY | | | ENGINEERING SERVICES. |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
1 |
Status |
F |
Date |
07-31-2012 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
07-31-2012 |
Time |
10:42 |
Rev Time |
0.00 |
| Received By |
vnoel |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2012-07-31 11:32:12 | 1. PROPOSED DUMPSTER SHOULD NOT OPEN INTO ALLEY.WHERE | | | IS EXISTING DUMPSTER? | | | 2. SITE PLAN SHOWS TREES ALONG ALLEY WHICH DO NOT SHOW | | | ON LANDSCAPE PLAN. | | | 3. PROPOSED TREES ALONG ALLEY MAY INTERFERE WITH | | | OVERHEAD LINES. | | | 4. UNITY OF TITLE WILL BE REQUIRED. APPLICATION IS MADE | | | THROUGH THE ENGINEERING SERVICES DEPT. |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
3 |
Status |
P |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
0.00 |
| Received By |
bcollins |
Date |
10-16-2012 |
Time |
16:17 |
Sent To |
|
|
| Notes |
| 2012-10-16 16:17:43 | NO NOTES |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
2 |
Status |
P |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
09-17-2012 |
Time |
|
Rev Time |
0.00 |
| Received By |
bcollins |
Date |
09-17-2012 |
Time |
08:20 |
Sent To |
|
|
| Notes |
| 2012-09-17 08:21:14 | PRIOR COMMENTS ADDRESSED. PASSED, HOWEVER DIRECTIONAL | | | ARROWS ON SOUTH SIDE OF PARKING LOT NEED TO BE | | | REVERSED. |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
1 |
Status |
F |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
08-07-2012 |
Time |
|
Rev Time |
0.00 |
| Received By |
bcollins |
Date |
08-07-2012 |
Time |
15:35 |
Sent To |
|
|
| Notes |
| 2012-08-07 15:39:02 | STRIPING (CROSS HATCHING) WILL NEED TO BE REMOVED TO | | | DELINEATE THE ENTRANCE AND EXIT ON PALM BEACH LAKES | | | BLVD. EXISTING AND PROPOSED STRIPING NEEDS TO BE SHOWN | | | ON THE PLAN. EASTERNMOST HANDICAPPED PARKING SPACE WILL | | | REQUIRE VEHICLE TO BACK OUT INTO ONCOMING TRAFFIC. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
3 |
Status |
P |
Date |
10-25-2012 |
|
|
Cont ID |
|
| Sent By |
aaponte |
Date |
10-25-2012 |
Time |
10:21 |
Rev Time |
0.00 |
| Received By |
aaponte |
Date |
10-11-2012 |
Time |
10:20 |
Sent To |
|
|
| Notes |
| 2012-10-25 12:20:53 | PROVISO: PLEASE PROVIDE A REVISED LANDSCAPE SHEET | | | ADDRESSING THE FOLLOWING COMMENT: | | | 1. THE REQUIRED LANDSCAPE BUFFER ALONG THE SOUTH SIDE | | | OF THE PARKING LOT SHALL INCLUDE TREES. IF POWER LINES | | | ABOVE, SMALL TREE SPECIES SHALL BE SELECTED (COMMENT NO | | | 3 ON THE 9/13/12 REVIEW). | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
F |
Date |
09-13-2012 |
|
|
Cont ID |
|
| Sent By |
aaponte |
Date |
09-13-2012 |
Time |
13:34 |
Rev Time |
0.00 |
| Received By |
aaponte |
Date |
09-13-2012 |
Time |
13:33 |
Sent To |
|
|
| Notes |
| 2012-09-13 14:15:12 | 1. PARKING LOT STRIPING DETAIL SHALL BE INCLUDED IN THE | | | SITE PLAN DRAWING. PLEASE INCLUDE DIMENSIONS FOR | | | REGULAR AND HANDICAP SPACES, AND THE CITY STRIPING | | | DETAIL. | | | 2. PLEASE CLEARLY INDICATE THE LOCATION, NAME, SIZE AND | | | CALIPER OF EXISTING TREES AND PALM ON THE PROPERTY. | | | SOME OF THE EXISTING TREES ALONG PALM BEACH LAKES | | | BOULEVARD HAVE CONFLICT WITH THE POWER LINES. CITY | | | RECOMMENDS REMOVING THEM AND REPLACE THEM WITH NEW | | | SMALL TREES APPROPRIATE FOR LOCATION. | | | 3. SHADE TREES SHALL BE PLANTED ALONG THE ENTIRE | | | PARKING LOT LANDSCAPE BUFFER (30 FEET ON CENTER). IF | | | CONLICT WITH UTILITIES SMALL TREES SHALL BE SELECTED. | | | 4. ALL NON-PAVED AREAS SHALL BE COVERED BY GRASS OR A | | | NON-DUSTING SURFACE. | | | 5. A HEDGE SHALL BE PLANTED AROUND THE ENTIRE SURFACE | | | PARKING LOT WITHIN THE LANDSCAPE BUFFER AREA (BOUNARIES | | | ADJACENT TO PROPERTY LINE OR ROW). | | | 6. THE REMOVAL OF ANY EXISTING TREES OR PALMS WILL | | | REQUIRE A TREE/PALM RELOCATION PERMIT FROM THE CITY. | | | 7. PARKING LOT TERMINAL ISLANDS SHALL BE 5' MINIMUM. | | | 8. PLEASE CHECK THE TRAFFIC DIRECTION ARROW, THEY ARE | | | NOT PLACED CORRECTLY ON THE DRIVE AISLE. | | | 9. EASTERN CURB CUT WIDTH SHALL BE ADJUSTED TO NEW | | | DRIVEWAY DIMENSION. | | | 10. PLEASE PROVIDE ARCHITECTURAL DRAWINGS FOR ALL | | | ELEVATIONS, IDENTIFIYING HEIGHTS AND BUILDING | | | MATERIALS. | | | 11. ALL PARKING SPACES REQUIRE A WHEEL STOP ACCORDING | | | TO CITY STANDARDS. | | | FOR ADDITIONAL INFORMATION PLEASE CALL ANA MARIA APONTE | | | AT 561-822-1439 |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
08-07-2012 |
|
|
Cont ID |
|
| Sent By |
aaponte |
Date |
08-07-2012 |
Time |
17:07 |
Rev Time |
0.00 |
| Received By |
aaponte |
Date |
08-07-2012 |
Time |
17:07 |
Sent To |
|
|
| Notes |
| 2012-08-07 17:25:39 | 1. PLEASE PROVIDE DETAIL DRAWIGNS INDICATING EXISTING | | | SQUARE FOOTAGE FOR EACH FLOOR AND PROPOSED CHANGES. | | | 2. PARKING LOT STRIPING SHALL COMPLY WITH CITY STRIPING | | | DETAILS. | | | 3. PLEASE PROVIDE DRAWINGS INDICATING EXISTING PLANT | | | MATERIAL TO BE MAINTAIN AND PROPOSED NEW PLANT | | | MATERIAL. | | | 4. PROPOSED FENCE ALONG THE FRONTAGE LINE CANNOT EXCEED | | | 4 FEET IN HEIGHT AS MEASURED FROM THE SIDEWALK | | | ELEVATION. | | | 5. SITE PLAN DRAWINGS DO NOT MATH LANDSCAPE DRAWINGS. | | | 6. SHADE TREES SHALL BE PLANTED ALONG THE PARKING LOT | | | LANDSCAPE BUFFER (1/30 FEET ON CENTER). | | | 7. DUMPSTER DIMENSIONS AND ENCLOSURE SHALL MEET CITY | | | STANDARDS IN SECTION 94-444(B) AND FIGURE XIV-3. | | | 8. PROJECT DATE SHEET C-1 INDICATED AND ADULT DAY CARE | | | USE. SUCH USE IS NOT PERMITTED IN THE PPD-R-PO. | | | 9. PLEASE SPECIFY THE EXACT SQUARE FOOTAGE DEDICATED TO | | | OFFICE/MANAGEMENT IN THE DRAWINGS. | | | FOR ADDITIONAL INFORMATION PLEASE CONTACT ANA MARIA | | | APONTE AT 561-822-1439 | | | |
|
|
| |
Print |