Plan Review Stops For Project Z11080014
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 09-13-2011 Cont ID  
Sent By lmartine Date 09-13-2011 Time 16:33 Rev Time 0.00
Received By lmartine Date 09-13-2011 Time 16:33 Sent To  
Notes
2011-09-13 16:37:16BUILDING REVIEW COMMENTS
  
  
 PLANS ARE TO PRELIMINARY FOR COMMENTS.
  
 NO BUILDING CODE DATA WAS PROVIDED.
  
 CHECK THE LENGTH OF YOUR H/C PARKING SPACES 16' OR 18'
 ?
  
  
  
 LUIS MARTINEZ
 561-805-6710

Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 12-07-2011 Cont ID  
Sent By eschneid Date 09-30-2011 Time 12:25 Rev Time 0.00
Received By eschneid Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG - PPRC ENGINEERING - PPRC
Rev No 1 Status F Date 09-13-2011 Cont ID  
Sent By bmoree Date 09-13-2011 Time   Rev Time 0.00
Received By bmoree Date 09-13-2011 Time 15:21 Sent To  
Notes
2011-09-13 15:21:381. PROPOSED CONSTRUCTION REQUIRES ENGINEERING SERVICES
 SITE DEVELOPMENT PERMIT.
  
 FOR ADDITION INFORMATION, PLEASE CONTACT ENGINEERING
 SERVICES.
  
 BRIAN R. MOREE
 CONSTRUCTION MANAGER
 ENGINEERING SERVICES DERPARTMENT
 CITY OF WEST PALM BEACH
 561-494-1098 OFFICE
 561-644-7270 MOBILE
 [email protected]

Review Stop STORM STORMWATER
Rev No 1 Status P Date 09-14-2011 Cont ID  
Sent By tward Date 09-14-2011 Time 12:43 Rev Time 0.00
Received By tward Date   Time   Sent To  
Notes
2011-09-14 12:44:15NO COMMENTS.

Review Stop SURVEY SURVEYING
Rev No 1 Status P Date 08-29-2011 Cont ID  
Sent By vnoel Date 08-29-2011 Time 08:48 Rev Time 0.00
Received By vnoel Date   Time   Sent To  
Notes
2011-08-29 08:49:17NO COMMENTS.

Review Stop Z ZONING
Rev No 2 Status P Date 12-07-2011 Cont ID  
Sent By eschneid Date 09-30-2011 Time 12:25 Rev Time 0.00
Received By eschneid Date   Time   Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 09-14-2011 Cont ID  
Sent By eschneid Date 09-14-2011 Time 08:27 Rev Time 2.00
Received By eschneid Date 09-14-2011 Time 08:27 Sent To  
Notes
2011-09-14 08:28:49CASE NOS. PB1446T & U
 OAKTON COMMONS ? DAY CARE AMENDMENT & FORMAL SITE PLAN
 8151 OKEECHOBEE BLVD.
  
 - CONTACT ERIC SCHNEIDER @ (561) 822-1446
  
 - PLEASE PROVIDE RESPONSES TO REVIEW COMMENTS IN
 WRITTEN FORMAT.
  
 - WHEN RESUBMITTING, PLEASE PROVIDE A MINIMUM OF TEN
 (10) PAPER COPIES AND AN ELECTRONIC COPY IN .PNG FORMAT
 OF ALL PLANS. PLEASE NOTE THAT CHANGES ON THE
 RESUBMITTED PLANS MAY RESULT IN ADDITIONAL COMMENTS.
  
 - THE PPRC COMMENTS SHALL BE SUFFICIENTLY ADDRESSED AND
 SUBMITTED TO THE PLANNING AND ZONING DEPARTMENT BY 5 PM
 ON SEPTEMBER 23, 2011, TO BE SCHEDULED FOR THE OCTOBER
 18, 2011 PLANNING BOARD MEETING.
  
 - PLEASE NOTE THAT IF THE PLANNING AND ZONING
 DEPARTMENT HAS NOT RECEIVED A RESPONSE TO THE PPRC
 COMMENTS WITHIN 60 DAYS FROM THE DATE OF THE PPRC
 MEETING (NOVEMBER 14, 2011), THE CASE SHALL BE
 CONSIDERED WITHDRAWN. ANY FURTHER ACTION SHALL REQUIRE
 A NEW DEVELOPMENT APPLICATION.
  
 - PLEASE NOTE THAT YOU WILL BE PERMITTED ONE (1)
 RESUBMITTAL AT NO ADDITIONAL COST. IF PREVIOUSLY-ISSUED
 COMMENTS CONTINUE TO NOT BE SUFFICIENTLY ADDRESSED, THE
 APPLICANT WILL BE ACCESSED A RESUBMITTAL FEE. SUCH FEE
 WILL BE 20% OF THE ORIGINAL APPLICATION FEE ($600).
  
 THE FOLLOWING COMMENTS ADDRESS BOTH THE MAJOR AMENDMENT
 AND THE FORMAL SITE PLAN APPLICATIONS. NOTE: NOT ALL
 COMMENTS WILL APPLY TO EACH APPLICATION, BUT FOR
 BREVITY, ALL COMMENTS WERE COMBINED.
  
 1) PLEASE PROVIDE THE FPU, FPL AND CITY OF WEST PALM
 BEACH SERVICE LETTERS.
  
 2) PLEASE PROVIDE THE TRAFFIC CONCURRENCY LETTER FROM
 PALM BEACH COUNTY APPROVING THE CHANGE IN THE MIX OF
 USES AND THE BUILD-OUT DATE EXTENSION.
  
 3) THE PRESERVE TRACT IS NO LONGER A PART OF THE OAKTON
 COMMONS CPD (HAVING BEEN REMOVED BY ORDINANCE NO.
 4327-11). PLEASE REMOVE REFERENCE TO THE PRESERVE FROM
 THE JUSTIFICATION STATEMENT AND THE DATA TABLE SHOWN ON
 THE MASTER PLAN. PLEASE NOTE THAT THE 10 FOOT PRESERVE
 BUFFER SHALL STILL BE PLANTED WITH NATIVE VEGETATION IN
 PHASE III AS PART OF THE REVISED OAKTON COMMONS CPD
 DEVELOPMENT ORDER.
  
 4) THE CONCEPTUAL AND FINAL LANDSCAPE PLANS SHOW TREES
 NOT MEETING THE REQUIRED 14 FOOT MINIMUM HEIGHT.
  
 5) A TERMINAL ISLAND TREE IS REQUIRED ON THE SOUTH SIDE
 OF THE DUMPSTER ENCLOSURE.
  
 6) PLEASE SHOW THE EXISTING TREE WEST OF THE
 NORTHWESTERN PARKING ROW WHICH WILL ACT AS A TERMINAL
 ISLAND TREE (WHERE THE PROPOSED LIGHT POLE IS).
  
 7) SHOW THE WIDTH OF THE FOUNDATION PLANTER AREA ON THE
 EAST SIDE OF THE NEW DAY CARE BUILDING. PER THE DESIGN
 GUIDELINES, IT SHALL BE A MINIMUM OF 5 FEET IN WIDTH.
  
 8) PLEASE VERIFY THAT THE PROPOSED LIGHT POLES WILL NOT
 IMPAIR THE LONG TERM GROWTH OF THE PROPOSED AND
 EXISTING TREES WITHIN THE LIMITS OF WORK. THE GREEN
 BUTTONWOOD TREES IN THE CENTER ISLAND APPEAR CLOSE TO
 THE LIGHT POLES. ONE IS BEING INSTALLED WITH A 7 FOOT
 SPREAD, 7 FEET FROM THE LIGHT POLE. ADDITIONALLY,
 PLEASE SHOW THE EXISTING PRESERVE AREA TREES THAT AREA
 ADJACENT TO THE PROPOSED LIGHT POLES NORTH OF THE
 PARKING AREA. THIS AREA IS VERY DENSELY POPULATED WITH
 TREES.
  
 9) WHAT ARE THE LIGHTING PLANS FOR THE SIDEWALK
 CONNECTION FROM OAKTON PRESERVE WAY TO THE ENTRANCE TO
 THE DAYCARE SITE AND FROM OKEECHOBEE BOULEVARD TO THE
 DAYCARE BUILDING? THE DESIGN GUIDELINES HAVE LIGHTING
 REQUIREMENTS.
  
 10) PLEASE CHECK THE DATA TABLES ON THE CONCEPTUAL
 PLANS AS THERE ARE SOME MINOR ERRORS, EX. TRACT C LOT
 AREA CONFLICTS, NO CHANGE TO THE TRACT B IMPERVIOUS
 AREA EVEN THOUGH ONE LANDSCAPE ISLAND IS BEING REDUCED
 FOR MORE PARKING, AND PARKING COUNTS FOR PHASE 3.
  
 11) THE ENLARGED TERMINAL ISLAND, EASE SIDE, IN PHASE 3
 SHOWS THE OLD PARKING COUNT WHEN 2 SPACES WERE REMOVED.
  
 12) THERE ARE SABAL PALMS BEING PROPOSED IN ISLANDS ON
 THE CONCEPTUAL LANDSCAPE PLANS WHICH NEED TO BE
 INSTALLED IN GROUPS OF THREE PER THE LANDSCAPE
 REGULATIONS.
  
 13) THE AMOUNT OF HANDICAP SPACES FOR THE NUMBER OF
 PARKING SPACES BEING CONSTRUCTED FOR THE DAYCARE
 APPEARS TO BE ONE SHORT. ON DAYCARE TRACT ARE 29
 PROPOSED (21 + 8 DROP OFF) AND ON THE COMMERCIAL TRACT
 ARE 26. THIS TOTAL OF 55 SPACES REQUIRES 3 HANDICAP
 SPACES, NOT 2 AS SHOWN. THE BUILDING DIVISION SHALL
 VERIFY IN WRITING THAT ONLY 2 SPACES ARE REQUIRED OR 3
 SPACES SHALL BE PROVIDED. ADDITIONALLY THE PARKING DATA
 TABLES SHOW INCORRECT NUMBER OF PARKING PROVIDED.
  
 14) THE BICYCLE RACK DATA TABLE HAS ERRORS. 19 BICYCLE
 SPACES ARE REQUIRED FOR THE 372 PARKING SPACES.
 ADDITIONALLY, THERE ARE MORE THAN 33 SPACES BEING
 CONSTRUCTED IN PHASE 2, EVEN THOUGH ONLY 29 ARE BEING
 CONSTRUCTED IN THE DAYCARE TRACT. THE 2 BICYCLE SPACES
 ARE ADEQUATE FOR THE DAYCARE TRACT PARKING. A NOTE
 SHALL BE ADDED THAT THE COMMERCIAL TRACT PARKING
 CONSTRUCTED IN PHASE 2 WILL HAVE ITS BICYCLE PARKING
 PROVIDED IN THE PHASE 3 CONSTRUCTION. MOVE THE
 WESTERNMOST PHASE 3 BIKE RACK TO THE SODDED OPEN AREA
 NORTHWEST OF BUILDING B.
  
 15) MAINTAIN THE STRIPPING ON THE Y-TURN AROUND ON THE
 BANK TRACT.
  
 16) PLEASE CONSIDER MOVING THE FUTURE PARK AND RIDE
 SPACES TO THE TWO PARKING AREAS ALONG THE NORTH
 PROPERTY LINE WHICH HAVE THE SIDEWALK LEADING BETWEEN
 THE BUILDINGS AND ULTIMATELY TO THE FUTURE BUS STOP
 LOCATION.
  
 17) PLEASE CLEARLY INDICATE WHICH PHASE WILL INCLUDE
 THE 4 SPACE PARKING BAY AND THE DUMPSTER AT THE
 NORTHWEST CORNER OF BUILDING B ON THE CONCEPTUAL SITE
 PLAN. WHAT WILL SEPARATE THE PHASES ON THE GROUND (A
 CURB)?
  
 18) THE XERISCAPE CALCULATIONS FOR THE OVERALL SITE AND
 THE DAYCARE TRACT DO NOT UTILIZE 50 MORE SHADE TREES
 THAN REQUIRED IN THE PARKING AREAS, BUT RATHER THE ONE
 TREE REQUIRED IN EACH ISLAND. THE SPEC PAGES CALL OUT 3
 INCH MULCH IN ALL BEDS, SO THIS WILL GET THE
 REPLACEMENT 10 POINTS. PLEASE CORRECT.
  
 19) DESIGNATE THE EXISTING TREES AND SHRUBS ALONG THE
 WEST PROPERTY LINE OF THE DAYCARE TRACT (PLANTED AS
 PART OF THE ENTRY CONDITION). THESE NEED TO BE COUNTED
 BY STAFF TO VERIFY BUFFER TREE COUNTS.
  
 20) PROVIDE THE EAST AND WEST SIDE OF THE DAYCARE
 CALCULATIONS FOR THE NUMBER OF TREES REQUIRED (DONE ON
 NORTH AND SOUTH SIDES OF THE TRACT).
  
 21) A WAIVER IS REQUIRED FOR THE SOUTH SIDE OF THE
 COMMERCIAL TRACT ALONG THE NORTH SIDE OF THE DAYCARE
 TRACT, AS THERE IS NO 5 FOOT WIDE BUFFER BEING
 PROVIDED.
  
 22) THE NORTHWESTERN MOST ORANGE GEIGER TREE APPEARS TO
 BE VERY CLOSE TO THE DRAINAGE LINE. A ROOT BARRIER MAY
 BE REQUIRED.
  
 23) THE COMMERCIAL AREA SHALL BE PLANTED WITH GRASS
 UNTIL DEVELOPED.
  
 24) PLEASE SHOW THE HEIGHT AS MEASURED BY THE CITY
 DEFINITION.
  
 25) WILL ALL OF THE MECHANICAL EQUIPMENT, A/C,
 GENERATORS, BE LOCATED ON THE ROOF?
  
 26) PROVIDE DETAILS ON THE OPAQUE PLAY AREA WALL.
  
 27) PLEASE PROVIDE THE FACADE AREA SO THAT STAFF CAN
 VERIFY THE WALL MOUNTED SIGNAGE ALLOWED ON EACH
 FRONTAGE. NOTE: ONLY THREE FA?ADE SIGNS ARE PERMITTED.
  
 28) SIGNS ARE REQUIRED TO HAVE A MINIMUM 5 FOOT SETBACK
 FROM RIGHT-OF-WAY LINES. THE NEW SIGN PROPOSED AT 3
 FEET IS NOT ACCEPTABLE.
  
 29) THE COMMERCIAL PORTION OF THE OAKTON COMMONS CPD
 (TRACTS B AND C) HAS A FRONTAGE OF APPROXIMATELY 1,020
 LINEAR FEET. PER THE SIGNAGE REGULATIONS, THIS ONLY
 ALLOWS 1,020 SQUARE FEET OF HIGH FREE STANDING SIGNS.
 THE APPROVED OAKTON COMMONS SIGNAGE PROGRAM ALLOWS
 1,200 SQUARE FEET OF HIGH FREESTANDING SIGNS TO
 CONSOLIDATE ALL OF THE SIGNAGE ON JUST THREE SIGNS. THE
 NEW PROPOSAL WOULD SEEK TO ADD AN ADDITIONAL SIGN, TO
 BRING THE AMOUNT OF SIGNAGE TO 1,600 SQUARE FEET OF
 SIGNAGE ALLOWED. STAFF CANNOT SUPPORT THIS REQUEST.
 CURRENTLY, THE BANK SIGN IS CONSTRUCTED AT 240 SQUARE
 FEET (120 PER SIGN FACE). STAFF COULD SUPPORT ADDING
 THE NEW SIGN FOR THE DAY CARE TO MATCH THE DIMENSIONS
 OF THE BANK SIGN, PROVIDED THAT THE PLANS REDUCE THE
 SIGN ENVELOPE ACCORDINGLY. WHILE THE TOTAL ALLOWED SIGN
 SQUARE FOOTAGE WILL BE INCREASED TO 1,280 SQUARE FEET,
 THE IMPACT OF THE ADDITIONAL SIGN SQUARE FOOTAGE WILL
 BE MITIGATED BY THE SMALLER/LOWER SIGNS AT EITHER END
 OF THE COMMERCIAL PROJECT.
  
 30) THE PATH THROUGH PRESERVE AREA SHALL BE CONCRETE OR
 PAVERS, NOT MULCH OR ASPHALT.
  