Plan Review Details - Project Z11060018
Plan Review Stops For Project Z11060018
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 07-13-2011 Cont ID  
Sent By lmartine Date 07-13-2011 Time 10:43 Rev Time 0.00
Received By bmoree Date 07-13-2011 Time 13:03 Sent To  
Notes
2011-07-13 10:49:02PLANS ARE TO PRELIMINARY FOR BUILDING CODE REVIEW.
  
 PERMITS WILL BE REQUIRED FOR TEMPORARY CONSTRUCTION.
  
  
  
 LUIS MARTINEZ
 561-805-6710

Review Stop ENG - PPRC ENGINEERING - PPRC
Rev No 2 Status P Date 10-17-2011 Cont ID  
Sent By eschneid Date 09-18-2011 Time 11:26 Rev Time 0.00
Received By eschneid Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG - PPRC ENGINEERING - PPRC
Rev No 1 Status F Date 07-13-2011 Cont ID  
Sent By bmoree Date 07-13-2011 Time 13:04 Rev Time 0.00
Received By bmoree Date 07-13-2011 Time 13:01 Sent To  
Notes
2011-07-13 13:03:44PLANNING BOARD CASE NO. 943H
  
 1. SUBMIT STORMWATER POLLUTION PREVENTION PLAN (SWPPP)
 2. SITE CIVIL PERMIT REQUIRED FROM ENGINEERING
 SERIVCES.
  
 THE ENGINEERING SERIVCES DEPARTMENT IS AVAILABLE TO
 DISCUSS SPECIFIC PROJECT DETAILS.
 CONSTRUCTION ADMINISTRATION
 BRIAN R. MOREE, CONSTRUCTION SUPERVISOR
 561-494-1040 OFFICE
 561-644-7270 MOBILE
  

Review Stop L LANDSCAPING
Rev No 2 Status N Date 10-17-2011 Cont ID  
Sent By eschneid Date 09-18-2011 Time 11:25 Rev Time 0.00
Received By eschneid Date 09-18-2011 Time 11:24 Sent To  
Notes
2011-10-17 11:25:27WILL BE REVIEWED UNDER SEPARATE SUBMITTAL.

Review Stop L LANDSCAPING
Rev No 1 Status F Date 07-07-2011 Cont ID  
Sent By eschneid Date 07-07-2011 Time 18:39 Rev Time 0.00
Received By eschneid Date 07-07-2011 Time 18:39 Sent To  
Notes
2011-07-07 18:39:34SEE ZONING COMMENTS

Review Stop POLICE POLICE
Rev No 2 Status P Date 10-17-2011 Cont ID  
Sent By eschneid Date 09-18-2011 Time 11:28 Rev Time 0.00
Received By eschneid Date   Time   Sent To  
Notes
***NONE***

Review Stop POLICE POLICE
Rev No 1 Status F Date   Cont ID  
Sent By   Date 07-08-2011 Time   Rev Time 0.00
Received By   Date 07-01-2011 Time   Sent To  
Notes
2011-07-08 14:42:19PRIOR TO ISSUANCE OF THE FIRST BUILDING PERMIT, THE
 APPLICANT SHALL PREPARE A CONSTRUCTION SITE SECURITY
 AND MANAGEMENT PLAN FOR APPROVAL BY THE CITY OF WEST
 PALM BEACH POLICE DEPARTMENT CPTED OFFICIAL.
 A.AFTER SITE CLEARING AND PLACEMENT OF CONSTRUCTION
 TRAILERS, THE DEVELOPER/PROJECT MANAGER SHALL INSTITUTE
 SECURITY MEASURES TO REDUCE OR ELIMINATE OPPORTUNITIES
 FOR THEFT. THE MANAGEMENT PLAN SHALL INCLUDE, BUT NOT
 BE LIMITED TO, TEMPORARY LIGHTING, SECURITY PERSONNEL,
 VEHICLE BARRIERS, CONSTRUCTION/VISITOR PASS,
 REDUCE/MINIMIZE ENTRY/EXIT POINTS, ENCOURAGE
 SUBCONTRACTORS TO SECURE MACHINERY, TOOLS AT END OF
 WORK DAY, FENCING WITH SCREENING AND OR ANY OTHER
 MEASURE DEEMED APPROPRIATE TO PROVIDE A SAFE AND SECURE
 WORKING ENVIRONMENT.
 B.THE SECURITY MANAGEMENT PLAN SHALL BE MAINTAINED
 THROUGHOUT THE CONSTRUCTION PHASE OF THE PROJECT.
 NON-COMPLIANCE WITH THE APPROVED PLAN SHALL RESULT IN A
 STOP-WORK ORDER FOR THE ENTIRE PLANNED UNIT
 DEVELOPMENT.
 C.PROPERTY SHALL BE POST ?NO TRESPASSING? SIGNS EVERY
 500 FEET AROUND THE PERIMETER OF THE SITE.
  
 MOVE THE BIKE RACKS TOWARDS THE FRONT OF THE BUILDINGS
 PROVIDE MORE INFO ON THE "LIVING WALL" THAT IS BEHIND
 THE BENCH SEATING
  
  
  
  

Review Stop STORM STORMWATER
Rev No 1 Status   Date 07-12-2011 Cont ID  
Sent By tward Date 07-12-2011 Time 14:17 Rev Time 0.00
Received By tward Date 07-12-2011 Time 14:16 Sent To  
Notes
2011-07-12 14:15:51SFWMD ENVIRONMENTAL RESOURCES PERMIT AND NPDES
 STORMWATER CONSTRUCTION PERMIT TO BE OBTAINED PRIOR TO
 CONSTRUCTION.

Review Stop SURVEY SURVEYING
Rev No 2 Status P Date 10-17-2011 Cont ID  
Sent By eschneid Date 09-18-2011 Time 11:27 Rev Time 0.00
Received By eschneid Date   Time   Sent To  
Notes
***NONE***

Review Stop SURVEY SURVEYING
Rev No 1 Status F Date 07-12-2011 Cont ID  
Sent By vnoel Date 07-12-2011 Time 14:40 Rev Time 0.00
Received By vnoel Date   Time   Sent To  
Notes
2011-07-12 14:39:441. PROPOSED LANDSCAPING MAY INTERFERE WITH EXISTING
 EASEMENTS ALONG JOG ROAD.
 2. BEARING AND DISTANCE FROM POC TO POB ARE MISSING.
 LABEL POC.
 3. THE DISTANCES (4) TO AND FROM THE SOUTH LINE OF THE
 NW 1/4 DO NOT MATCH IN LEGAL VS. MAP.
 4. ADD REFERENCE TO BEARING BASE.

Review Stop Z ZONING
Rev No 3 Status P Date 10-17-2011 Cont ID  
Sent By eschneid Date 10-06-2011 Time 11:13 Rev Time 0.00
Received By eschneid Date 10-06-2011 Time 11:12 Sent To  
Notes
2011-10-17 11:23:29I HAVE REVIEWED THE RESPONSES. I HAVE LISTED
 OUTSTANDING ITEMS USING YOUR RESPONSE NUMBERS.
  
 #3 - BICYCLE RACK. THE RACK NEEDS TO BE 3 FEET FROM
 FRONT OF THE PAD. THIS IS TO ALLOW MULTIPLE LOCK POINTS
 WITHOUT OVERHANGING THE FRONT OF THE PAD. IF THE PLANS
 ARE RUN, I WILL ADD AS A CONDITION FOR THE ISPR
 APPROVAL. NEED TO BE FIXED FOR PERMIT SET.
  
 #6 - PARKING SPACE DETAIL AND WHEEL STOP. THE TYPICAL
 SPACE DETAIL IS INCORRECT. THE 12 INCHES BETWEEN THE
 DOUBLE STRIPES IS NOT SHOWN. ZONING AND LAND
 DEVELOPMENT REGULATIONS SPECIFY A DIFFERENT TYPE OF
 WHEEL STOP THAN SHOWN. IF THE PLANS ARE RUN, I WILL ADD
 AS A CONDITION FOR THE ISPR APPROVAL. NEED TO BE FIXED
 FOR PERMIT SET.
  
 #7 - CLARIFICATION REQUIRED ON PARKING STALL LAYOUT.
 THE TYPICAL DETAIL SHOWS A 22 FOOT DEEP PARKING SPACE
 (18 FOOT PAVEMENT, 1.5 FOOT GUTTER, 6 INCH CURB, AND A
 2 FOOT OVERHANG), IS THIS THE INTENT? THE CITY DETAIL
 HAS THE CURB AND THE OVERHANG TOTAL 2 FEET. REGARDLESS
 OF THE STALL DEPTH, THE MULCH AREA PLUS THE CURB SHALL
 EQUAL 2 FEET. THE ADDITIONAL 6 INCHES ON BOTH SIDES OF
 THE INTERIOR ISLAND SHALL BE PLANTED (12 INCHES
 ADDITIONAL GREEN SPACE). IF THE PLANS ARE RUN, I WILL
 ADD AS A CONDITION FOR THE ISPR APPROVAL. NEED TO BE
 FIXED FOR PERMIT SET.
  
 YOU WILL NOTE THAT I CAN APPROVE THE SITE PLANS SUBJECT
 TO THE POSSIBLE "ADDRESS AT PERMITTING" CONDITIONS
 ABOVE. I JUST NEED 2 SETS FOR MY FILE AND HOWEVER MANY
 YOU WANT BACK IN FULL SIZED HARD COPY AND ONE COPY OF
 PLANS IN .PDF FOR THE APPROVAL LETTER.

Review Stop Z ZONING
Rev No 2 Status F Date 10-17-2011 Cont ID  
Sent By eschneid Date 09-18-2011 Time 11:10 Rev Time 0.00
Received By eschneid Date 09-18-2011 Time 11:09 Sent To  
Notes
2011-10-17 11:12:27I REQUIRE THE FOLLOWING:
  
 RESPONSE COMMENT #3. A BETTER JUSTIFICATION FOR THE WHY
 FOR 100 PARKING SPACES. YOU STATE IT HAS BEEN CAREFULLY
 CALCULATED. I NEED BACK-UP ON THIS. EX. 50 SHIFT
 WORKERS FOR PLANT; THE BOILER BUILDING HAS NO PERSONAL
 IN IT SO THE SQUARE FOOTAGE SHOULD NOT COUNT FOR
 PARKING; OFFICE @ 1 PER 350 REQ. 10 SPACES; EXISTING
 FACILITY NO. 1 HAS 500,000 SQ. FT. AND ONLY NEED 20
 PARKING SPACES; ETC. I NEED A CUT SHEET SHOWING THIS IN
 TABULAR FORM FOR THE FSPR. FOR BUILDING PERMIT IT WILL
 NEED TO BE ADDED TO THE PLANS.
  
 RESPONSE COMMENT #6. YOU HAVE SUFFICIENT LOADING SPACES
 FOR THE MAINTENANCE AND ADMINISTRATION BUILDINGS WITH
 WHAT IS PROVIDED AT THE MAINTENANCE BUILDING. THE REF
 #2 LAYOUT HAS MANY AREAS THAT SERVE LOADING PURPOSE SO
 NO SPECIFIC PLACE NEEDS TO BE CALLED OUT. WHAT WAS
 REQUIRED WAS THIS IN TABULAR FORM (CUT SHEET NOW, ON
 PLANS AT BUILDING PERMIT). PLEASE NOTE THAT THE
 "LOADING SPACE" SHOWN AT THE ADMINISTRATION BUILDING IS
 REQUIRED TO BE A TERMINAL LANDSCAPE ISLAND (PER COMMENT
 #21)
  
 RESPONSE COMMENT #8. BICYCLE RACK DETAILS DO NOT MEET
 CITY STANDARDS. PAD IS INCORRECT SIZE/CONFIGURATION.
 NOT SURE WHAT MEASURE UNIT THE RACK DETAIL IS IN.
  
 RESPONSE COMMENT #12. DIMENSION LINES NOT PROVIDED.
 WILL BE A CONDITION FOR PERMIT.
  
 RESPONSE COMMENT #15. WHO IN BUILDING DIVISION SAID NO
 ADA ROUTE TO JOG REQUIRED?
  
 RESPONSE COMMENT #17. PARKING DETAILS DO NOT MEET WPB
 STANDARDS. SINGLE STRIPPED. WHEEL STOPS DO NOT MEET
 CODE.
  
 RESPONSE COMMENT #18. UNABLE TO VERIFY WITHOUT ACCURATE
 PARKING DETAILS, BUT IT APPEARS FROM THE CIVIL PLANS
 THAT THE CURB IS STILL AT 20 FEET AND THE MULCH AREA
 WOULD BE IN THE PARKING SPACE.
  
 RESPONSE COMMENT #20. NOT ALL INFORMATION IS PROVIDED
 ON THE PAVING PLANS.
  
 RESPONSE COMMENT #21. NO SPACE HAS BEEN PROVIDED FOR
 THE REQUIRED TERMINAL ISLAND. IT IS INSTEAD SHOWN AS A
 LOADING SPACE. THIS WILL BE A CONDITION ON THE FSPR
 APPROVAL.

Review Stop Z ZONING
Rev No 1 Status F Date 07-07-2011 Cont ID  
Sent By eschneid Date 07-07-2011 Time 18:40 Rev Time 7.00
Received By eschneid Date 07-07-2011 Time 18:39 Sent To  
Notes
2011-07-07 18:40:20CASE NO. PB943H
 NAME OF CASE - SWA RENEWABLE ENERGY FACILITY #2
 6501 N. JOG
  
 - CONTACT ERIC SCHNEIDER @ (561) 822-1446
  
 - PLEASE PROVIDE RESPONSES TO REVIEW COMMENTS IN
 WRITTEN FORMAT.
  
 - WHEN RESUBMITTING, PLEASE PROVIDE A MINIMUM OF SIX
 (6) FULL SIZED PAPER COPIES AND AN ELECTRONIC COPY IN
 .PNG FORMAT OF ALL PLANS. PLEASE NOTE THAT CHANGES ON
 THE RESUBMITTED PLANS MAY RESULT IN ADDITIONAL
 COMMENTS.
  
 - PLEASE NOTE THAT IF THE PLANNING AND ZONING
 DEPARTMENT HAS NOT RECEIVED A RESPONSE TO THE PPRC
 COMMENTS WITHIN 60 DAYS FROM THE DATE OF THESE COMMENTS
 (9/13/11), THE CASE SHALL BE CONSIDERED WITHDRAWN. ANY
 FURTHER ACTION SHALL REQUIRE A NEW DEVELOPMENT
 APPLICATION.
  
 - PLEASE NOTE THAT YOU WILL BE PERMITTED ONE (1)
 RESUBMITTAL AT NO ADDITIONAL COST. IF PREVIOUSLY-ISSUED
 COMMENTS CONTINUE TO NOT BE SUFFICIENTLY ADDRESSED, THE
 APPLICANT WILL BE ACCESSED A RESUBMITTAL FEE. SUCH FEE
 WILL BE 20% OF THE ORIGINAL APPLICATION FEE ($200).
  
 1. PROVIDE THE FPL AND COMCAST SERVICE PROVISION
 LETTERS.
  
 2. THE SITE DATA TABLE SHALL BETTER DEFINE THE
 CATEGORIES - THERE APPEARS TO BE OVERLAP AND SHOW EACH
 AS A PERCENT OF THE TOTAL SITE.
  
 3. PLEASE STATE ON THE PLANS HOW THE 100 REQUIRED
 PARKING SPACES WERE ARRIVED AT. TABLE XV-6 OF THE
 ZONING AND LAND DEVELOPMENT REGULATIONS (ZLDR) SHALL BE
 USED AS A BASIS FOR THESE CALCULATIONS.
  
 4. THE PLANS SHOW 104 PARKING SPACES. THIS NUMBER
 REQUIRES FIVE (5) ADA PARKING SPACES, NOT FOUR (4) AS
 PROVIDED. PLEASE SEE TABLE XV-3 OF THE ZLDR. PLEASE
 NOTE THAT THE PARKING TABLE ON THE PLANS STATES THAT
 ONLY 100 SPACES ARE PROVIDED AS IT COUNTS THE ADA
 SPACES AS PART OF THE TOTAL.
  
 5. THE CONSTRUCTION SERVICES DEPARTMENT SHALL VERIFY IN
 WRITING THE DISTRIBUTION OF THE ADA PARKING SPACES ON
 THE SITE. IS A SPACE(S) REQUIRED TO BE AT THE ENTRANCE
 OF THE MAINTENANCE BUILDING, SINCE THIS BUILDING
 INCLUDES OFFICES, A LUNCH ROOM AND LOCKER ROOMS?
  
 6. THE PLANS SHALL SHOW LOADING SPACES MEETING THE SIZE
 AND NUMBER AS REQUIRED BY TABLE XV-4 OF THE ZLDR. A
 TABLE REFLECTING THIS SHALL ALSO BE PROVIDED.
  
 7. PROVIDE THE SIZE OF THE BUS PARKING SPACE ON THE
 PLANS.
  
 8. BICYCLE PARKING MEETING SECTION 94-485(Q) OF THE
 ZLDR SHALL BE SHOWN ON THE SITE AND CIVIL PLANS
 (LANDSCAPE PLAN SHOWS BICYCLE PARKING). THE PLANS SHALL
 INCLUDE BICYCLE RACK DETAILS AND THE PAD SIZE MEETING
 MINIMUM SIZE STANDARDS. DIMENSIONS SHALL BE SHOWN ON
 THE PLANS AND DETAILS. NOTE: 104 PARKING SPACES REQUIRE
 FIVE (5) BICYCLE PARKING SPACES.
  
 9. PROVIDE THE BUILDING DIMENSIONS ON THE PLANS.
  
 10. PROVIDE THE WIDTHS OF ALL WALKWAYS ON THE PLANS.
  
 11. PROVIDE THE WIDTHS OF THE DRIVE AISLES. PLEASE
 REMEMBER THAT THE FIRE DEPARTMENT REQUIRES 20 FOOT
 MINIMUM WIDTHS.
  
 12. PROVIDE THE DIMENSION ACROSS THE PARKING AREA, BOTH
 NORTH/SOUTH AND EAST/WEST. THE DIMENSION SHALL INCLUDE
 THE DRIVE AISLES, THE PARKING STALLS, THE CURBING AND
 THE LANDSCAPE AREAS.
  
 13. NOTE: THE ADA ACCESS AISLE IS MISLABELED ON BASE
 SITE PLAN SHEET 700-CO-006.
  
 14. LABEL THE FEATURES ON ALL PLANS. (EX. THE GENERATOR
 IS NOT LABELED ON THE SITE PLAN).
  
 15. PROVIDE AN ADA SIDEWALK TO THE JOG ROAD
 RIGHT-OF-WAY AND EACH ACCESSIBLE BUILDING ENTRANCE.
  
 16. HIGHLIGHT THE SIDEWALK NETWORK.
  
 17. PROVIDE PARKING DETAILS FOR THE PERMANENT AND
 CONSTRUCTION PARKING SPACES.
  
 18. THE ADMINISTRATIVE AREA PARKING SPACES ARE SHOWN AS
 20 FEET DEEP TERMINATING AT A CURB. PER FIGURE XIV-2 OF
 THE ZLDR, THIS WOULD EITHER REQUIRE WHEEL STOPS TWO (2)
 FEET FROM THE CURB OR TWO (2) FEET OF CLEAR OVERHANG
 INTO THE LANDSCAPE AREA (RESULTING IN A 22 FOOT LONG
 PARKING SPACE). STAFF SUGGESTS MOVING THE CURB TO THE
 18 FOOT POINT AND HAVING A TWO (2) FOOT OVERHANG INTO A
 WIDENED LANDSCAPE AREA. THE ADA SPACES HAVE THE SAME
 ISSUE EXCEPT THEY OVERHANG A SIDEWALK.
  
 19. PROVIDE THE MATERIAL OF THE LAY DOWN AND STAGING
 AREAS, TO INCLUDE PARKING SURFACES. PROVIDE WRITTEN
 VERIFICATION FROM THE CONSTRUCTION SERVICES DEPARTMENT
 THAT NO ADA PARKING SPACES ARE REQUIRED FOR EITHER SET
 OF CONSTRUCTION TRAILERS.
  
 20. WILL THE CONTRACTOR BE CONSTRUCTING THE DRIVE
 AISLES, PARKING AND CURBING OFF TO THE SITE PLANS OR
 THE PAVING PLANS. IF THE PAVING PLANS WILL BE USED,
 THEN ALL DIMENSIONS SHALL BE CLEARLY PROVIDED ON THE
 PAVING PLANS. NOTE SOME LABELS OVERLAP ON THE PAVING
 PLAN.
  
 21. THERE IS NO TREE IN THE TERMINAL ISLAND OF THE
 NORTH OF THE ADA PARKING ROW.
  
 22. PROVIDE THE CURBING DETAILS.
  
 23. PROVIDE DETAILS OF THE "LIVING WALL", SUCH AS
 HEIGHT, MATERIAL AND PLANTING.
  
 24. EXPLAIN THE PHOTOVOLTIC AREAS AND PROVIDE DETAILS
 OF HOW THEY WILL LOOK. THE POSTS OVER THE PARKING
 SPACES SHALL BE CLEARLY MARKED AND SIZED SO THAT STAFF
 CAN VERIFY THAT THE PARKING SPACES WILL FUNCTION.
 PLEASE NOTE THAT THERE ARE A NUMBER OF TREES LOCATED
 NEAR THESE AREAS. HAS THE CANOPY SPREAD BEEN FACTORED
 INTO THE PLACEMENT?
  
 25. PROVIDE ALL 4 ELEVATIONS OF THE POWER BLOCK
 BUILDING (ONLY 2 PROVIDED).
  
 26. WHERE WILL THE AC/MECHANICAL EQUIPMENT FOR THE
 ADMINISTRATION BUILDING AND THE MAINTENANCE BUILDING BE
 LOCATED?
  
 27. PLEASE REVIEW THE ABILITY TO PUT MORE DETAILING ON
 THE EAST ELEVATION OF THE MAINTENANCE BUILDING ABOVE
 THE WINDOWS. NOTE: THE EAST ELEVATION OF THIS BUILDING
 IS SHOWN DIFFERENTLY ON SHEETS 720-A3-100 & 101.
  
 28. THE PLANS SHALL STATE THE ULTIMATE LANDSCAPE
 MATERIAL FOR THE FILLED IN LAKE AREA.
  
 29. PLEASE VERIFY THAT THE LIGHTS HAVE NOT BEEN PLACED
 SUCH THAT THEY WILL BE IN CONFLICT WITH THE LONG TERM
 TREE GROWTH. SOME OF THE LIGHTS APPEAR WITHIN 15 FEET
 OF OAKS (ESPECIALLY IN THE PARKING ISLANDS), FIVE (5)
 FEET OF PINES, 10 FEET OF CASSIAS AND 10 FEET OF ROYAL
 PALMS.
  
 30. WHAT IS THE 8 INCH PVC SCH 40 WHICH RUNS TROUGH THE
 LANDSCAPE AREA SOUTH OF THE PARKING AREA AND THE CBC
 WHICH RUNS ALONG THE WEST ENTRY ROAD? BOTH OF THESE
 PRESENT CONFLICTS WITH TREE PLACEMENT.
  
 31. THE PLANS ARE UNCLEAR AS TO THE AREA NORTH OF THE
 ADMINISTRATION BUILDING. THE RENDERINGS AND ELEVATIONS
 SHOW THIS AS AN ELEVATED PATIO AREA. PLEASE CLARIFY ON
 THE PLANS. NOTE: STAFF RECOMMENDS AN OUTDOOR SEATING
 AREA ON THE PATIO.
  
 32. THE SABAL PALM RELOCATION AREA BY THE EXISTING
 PARKING AREA (SOUTHEAST CORNER OF SITE) APPEARS FROM
 THE AERIAL PROVIDED WITH THE SPECIFIC PURPOSE SURVEY TO
 BE IN A DRAINAGE DITCH.
  
 33. AFTER A DISCUSSION WITH MICHAEL SANCHEZ ON JULY 7,
 2011, IT WAS DETERMINED THAT A FULL LANDSCAPE REVIEW BE
 SUSPENDED AT THIS TIME TO ALLOW FURTHER DISCUSSION
 OUTSIDE OF THE PPRC MEETING. THESE DISCUSSIONS ARE TO
 INCLUDE CALCULATION OF REQUIRED LANDSCAPE, MITIGATION
 STRATEGIES AND PROVIDING ADEQUATE DETAILING ON THE
 LANDSCAPE PLANS.
  
 34. PLEASE SHOW HOW THE FOLLOWING CONDITION OF
 CERTIFICATION IS BEING MET - THE LANDSCAPE PLAN
 INCLUDED AS PART OF THE LEVEL I SITE PLAN FOR PBREF #2
 SHALL INCLUDE LANDSCAPE MATERIAL TO SCREEN THE EXISTING
 PALM BEACH RENEWABLE ENERGY FACILITY #1 (PBREF #1)
 STRUCTURES THAT WERE CONSTRUCTED AS PART OF THE RECENT
 MODERNIZATION AND TO ENHANCE THE BUFFER PLANTING ALONG
 THE COMMON BOUNDARY WITH THE IRONHORSE RESIDENTIAL
 PLANNED DEVELOPMENT.
  

  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved