| Plan Review Stops For Project Z11010002 |
| Review Stop |
STORM |
STORMWATER |
| Rev No |
1 |
Status |
F |
Date |
02-07-2011 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
02-07-2011 |
Time |
12:47 |
Rev Time |
0.00 |
| Received By |
astelly |
Date |
02-07-2011 |
Time |
12:54 |
Sent To |
|
|
| Notes |
| 2011-02-07 12:49:43 | 1. NO ENGINEERING PLANS PROVIDED FOR REVIEW OF | | | STORMWATER SYSTEM. | | | 2. PROVIDE PLANS AND DRAINAGE CALCS AT TIME OF | | | SUBMITTAL TO ENGINEERING SERVICES. | | | 3. IS THERE ANY EXISTING SFWMD PERMIT? OVERALL PROPERTY | | | MAY NEED TO BE PERMITTED. |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
1 |
Status |
F |
Date |
02-07-2011 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
02-07-2011 |
Time |
09:51 |
Rev Time |
0.00 |
| Received By |
vnoel |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2011-02-07 09:51:40 | 1. PROPERTY WILL NEED TO BE REPLATTED. | | | 2. NO PRELIMINARY ENGINEERING PLANS PROVIDED. | | | 3. UNDERGROUND UTILITIES MAY NEED TO BE REPLACED OR | | | EASEMENTS GRANTED FOR EXISTING. | | | 4. SURVEY SHOULD BE RECLASSIFIED AS A BOUNDARY & | | | TOPOGRAPHIC SURVEY. | | | 5. ADD SECOND ON-SITE BENCHMARK. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
0.00 |
| Received By |
astelly |
Date |
05-06-2011 |
Time |
12:55 |
Sent To |
|
|
| Notes |
|
|
| |
Print |
|