| Plan Review Stops For Project Z10110008 |
| Review Stop |
B1 |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
12-08-2010 |
|
|
Cont ID |
|
| Sent By |
lmartine |
Date |
12-08-2010 |
Time |
11:05 |
Rev Time |
0.00 |
| Received By |
lmartine |
Date |
12-08-2010 |
Time |
10:52 |
Sent To |
|
|
| Notes |
| 2010-12-08 11:05:54 | NO COMMENTS |
|
|
| Review Stop |
ENG - PPRC |
ENGINEERING - PPRC |
| Rev No |
1 |
Status |
P |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
12-08-2010 |
Time |
|
Rev Time |
0.00 |
| Received By |
bmoree |
Date |
12-08-2010 |
Time |
09:24 |
Sent To |
|
|
| Notes |
| 2010-12-08 09:41:36 | 1. CIVIL DESIGN PLANS SHALL INCLUDE STORMWATER | | | MANAGEMENT PLAN AND POLLUTION PREVENTION PLAN. | | | | | | BRIAN R. MOREE | | | ENGINEERING CONSTRUCTION SUPERVISOR | | | 401 CLEMATIS STREET | | | WEST PALM BEACH, FLORIDA 33401 | | | 561-494-1098 OFFICE | | | 561-644-7270 MOBILE |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
01-11-2011 |
|
|
Cont ID |
|
| Sent By |
mcarsill |
Date |
01-11-2011 |
Time |
14:25 |
Rev Time |
0.00 |
| Received By |
mcarsill |
Date |
01-11-2011 |
Time |
14:25 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
F |
Date |
11-22-2010 |
|
|
Cont ID |
|
| Sent By |
mcarsill |
Date |
11-22-2010 |
Time |
14:40 |
Rev Time |
0.00 |
| Received By |
mcarsill |
Date |
11-22-2010 |
Time |
14:33 |
Sent To |
|
|
| Notes |
| 2010-11-22 14:40:11 | FORMAL SITE PLAN REVIEW CASE NO. 10-5 (Z10110008) | | | 205 NORTH DIXIE HIGHWAY | | | | | | 1. THE COVER SHEET INDICATES AN ADDRESS OF 205 NORTH | | | DIXIE HIGHWAY. THE WORK APPEARS TO BE LOCATED BEHIND | | | THE HISTORIC COURT HOUSE (300 NORTH DIXIE HIGHWAY) AND | | | WEST OF THE GOVERNMENTAL CENTER (301 NORTH OLIVE | | | AVENUE). THE COVER SHEET ADDRESS DOES NOT APPEAR TO | | | CORRESPOND TO THE ADDRESSES LISTED. | | | | | | 2. ON SHEET A-100 THE EXISTING FIRE HYDRANT APPEARS TO | | | BE DIRECTLY NEXT TO THE CONCRETE WALK. DOES THE | | | LOCATION INTERFERE WITH MOVEMENT ON THE CONCRETE WALK. | | | | | | 3. PLEASE INDICATE WHAT MATERIALS ARE PLANNED TO BE | | | STORED IN THE STORAGE AREA. | | | | | | 4. THE CANOPY DISPLAYED ON SHEET A-100 IS TO BE | | | CONSTRUCTED OF FIRE RESISTANT MATERIALS. | | | | | | | | | DENIED | | | | | | | | | MIKE CARSILLO, BATTALION CHIEF | | | BUREAU OF FIRE PREVENTION |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
3 |
Status |
P |
Date |
01-20-2011 |
|
|
Cont ID |
|
| Sent By |
rkussner |
Date |
01-20-2011 |
Time |
14:53 |
Rev Time |
0.00 |
| Received By |
rkussner |
Date |
01-20-2011 |
Time |
14:53 |
Sent To |
|
|
| Notes |
| 2011-01-20 14:55:16 | LAYBAN REEVES FROM THE PARKS DEPARTMENT WILL BE | | | RELOCATING THE SIX (6) GUMBO LIMBO TREES FROM THE SITE | | | AND INSTALLING THEM ELSEWHERE ON CITY PROPERTY. |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
2 |
Status |
F |
Date |
01-07-2011 |
|
|
Cont ID |
|
| Sent By |
rkussner |
Date |
01-07-2011 |
Time |
16:40 |
Rev Time |
0.00 |
| Received By |
rkussner |
Date |
01-07-2011 |
Time |
16:40 |
Sent To |
|
|
| Notes |
| 2011-01-07 16:53:23 | ***LANDSCAPE REVIEW FAILED*** | | | | | | PLEASE RESPOND TO REVIEW COMMENTS IN WRITTEN FORMAT. | | | | | | 1. REPEAT COMMENT: EVERY EFFORT SHALL BE MADE TO SAVE | | | THE LIVE OAK AND GUMBO LIMBO TREES BY RELOCATING THEM | | | ON SITE OR ELSEWHERE WITHIN THE CITY LIMITS. | | | | | | 2. REPEAT COMMENT: PURSUANT TO SECTION 94-444 (B), | | | OUTDOOR INCINERATORS, GARBAGE OR TRASH CONTAINERS, | | | TRASH RECEPTACLES, FUEL TANKS, STORAGE RACKS AND OTHER | | | MECHANICAL EQUIPMENT SHALL BE SCREENED. WALLS SHALL BE | | | LANDSCAPED WITH SHRUBS AND HEDGES PLANTED AT TWO-FOOT | | | INTERVALS. THE TRANSFORMER ON THE NORTH SIDE OF THE | | | SITE IS OPEN TO THE STREET. PLEASE PROVIDE SCREENING | | | FROM THE PUBLIC VIEW. VISION OBSCURING GATES SHALL BE | | | INSTALLED ON THE ENCLOSURE. SCREENING ALONG THE OTHER | | | SIDES APPEARS TO BE SATISFACTORY. | | | | | | IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT ROBERT | | | KUSSNER @ (561) 822-1462. |
|
|
| Review Stop |
L |
LANDSCAPING |
| Rev No |
1 |
Status |
F |
Date |
12-08-2010 |
|
|
Cont ID |
|
| Sent By |
rkussner |
Date |
12-08-2010 |
Time |
17:10 |
Rev Time |
0.00 |
| Received By |
rkussner |
Date |
12-08-2010 |
Time |
17:10 |
Sent To |
|
|
| Notes |
| 2010-12-08 17:23:38 | ***LANDSCAPE REVIEW FAILED*** | | | | | | PLEASE RESPOND TO REVIEW COMMENTS IN WRITTEN FORMAT. | | | | | | 1. PLEASE APPLY FOR A TREE ALTERATION PERMIT. THE | | | APPLICATION IS AVAILABLE AT THE FRONT DESK OF THE | | | PLANNING & ZONING DEPARTMENT. WE WILL NEED THE | | | COMPLETED APPLICATION AND TWO SETS OF PLANS THAT | | | IDENTIFY THE TREES TO BE REMOVED. EVERY EFFORT SHALL BE | | | MADE TO SAVE THE TREES BY RELOCATING THEM ON SITE OR | | | ELSEWHERE WITHIN THE CITY LIMITS. | | | | | | 2. PURSUANT TO SECTION 94-444 (B), OUTDOOR | | | INCINERATORS, GARBAGE OR TRASH CONTAINERS, TRASH | | | RECEPTACLES, FUEL TANKS, STORAGE RACKS AND OTHER | | | MECHANICAL EQUIPMENT SHALL BE SCREENED. WALLS SHALL BE | | | LANDSCAPED WITH SHRUBS AND HEDGES PLANTED AT TWO-FOOT | | | INTERVALS. THE TRANSFORMER ON THE NORTH SIDE OF THE | | | SITE IS OPEN TO THE STREET. PLEASE PROVIDE SCREENING | | | FROM THE PUBLIC VIEW. | | | | | | 3. CREDIT WAS TAKEN FOR THE USE OF A MOISTURE SENSING | | | CONTROLLER OTHER THAN A RAIN SWITCH. PLEASE IDENTIFY | | | THE TYPE OF EQUIPMENT TO BE USED OR DELETE THE FIVE | | | POINTS FROM THE TOTAL. | | | | | | 4. TREES AND SHRUBS SHALL BE PLANTED AT OR SLIGHTLY | | | ABOVE GRADE WITH ONLY A ONE INCH LAYER OF MULCH TO BE | | | APPLIED OVER THE ROOT BALL. THE THREE INCH LAYER OF | | | MULCH IS TO BE APPLIED OUTSIDE OF THE ROOT BALL. | | | | | | 5. STAFF RECOMMENDS THAT ROSES BE PLANTED TO | | | COMMEMORATE ROSE KENNEDY'S ROSE GARDEN IN ADDITION TO | | | THE PLAQUE BEING PROPOSED. | | | | | | IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT ROBERT | | | KUSSNER @ (561) 822-1462. |
|
|
| Review Stop |
POLICE |
POLICE |
| Rev No |
1 |
Status |
F |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2010-12-07 10:24:18 | WHAT LIGHTING WILL BE INSTALLED. LOOKING FOR PEDESTRIAN | | | SCALE ALONG THE PTHS AND SIDEWALK, PAVILLION STRUCTURE. | | | MOVE THE BIKE RACKS TO A MORE HIGH TRAFFIC AREA | | | BENCHES SHOULD BE DIVIDED STYLE | | | | | | A. LANDSCAPING SHALL NOT CONFLICT WITH LIGHTING (TO | | | INCLUDE LONG-TERM TREE CANOPY GROWTH). | | | B. TIMER CLOCK OR PHOTOCELL SENSOR-ENGAGED LIGHTING FOR | | | DUSK TO DAWN OPERATION FOR ALL PEDESTRIAN SIDEWALKS. | | | C. LIGHTING FOR ENTRANCE SIGN TO PATHWAYS SHALL BE | | | PROVIDED TO ALLOW NIGHTTIME USE OF PEDESTRIAN WALKWAYS. | | | D. BENCHES WILL BE DIVIDED STYLE SEATING. | | | E. SHALL BE DESIGNED TO MAXIMIZE NATURAL SURVEILLANCE | | | OF THE PEDESTRIAN USERS THROUGH SELECTIVE VEGETATIVE | | | MANAGEMENT PRACTICES. | | | F. GROUND COVER SHALL BE NO HIGHER THAN 24 INCHES, WITH | | | TREES HAVING A MINIMUM 7-FOOT CLEAR TRUNK SPACE FOR A | | | NATURAL SURVEILLANCE WINDOW. | | | G. INSTALL 12-FOOT PEDESTRIAN-SCALE LIGHTING. AS A | | | GENERAL RULE, THE MINIMUM LIGHTING INTENSITY AT ANY | | | POINT ALONG THE PATH SHALL BE AT 0.6 FOOT-CANDLES. | | | H. SIGHT LINES SHALL HAVE A 12-FOOT CLEAR DISTANCE | | | SPACE AT ENTRY POINTS, CURVES, MERGERS, INTERSECTIONS, | | | ETC. | | | |
|
|
| Review Stop |
STORM |
STORMWATER |
| Rev No |
1 |
Status |
P |
Date |
01-10-2011 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
12-07-2010 |
Time |
06:43 |
Rev Time |
0.00 |
| Received By |
vnoel |
Date |
12-07-2010 |
Time |
06:41 |
Sent To |
|
|
| Notes |
| 2010-12-07 06:42:52 | WHEN CONSTRUCTION DOCUMENTS ARE SUBMITTED FOR | | | PERMITTING , THE APPLICANT SHOULD INCLUDE COPIES OF THE | | | FOLLOWING : | | | 1) SFWMD ERP ( OR PERMIT MOD ) | | | 2) DRAINAGE REPORT , CALCULATIONS & GEOTECHNICAL | | | RESULTS | | | 3) ALL COMPLETE STORMWATER MANAGEMENT PLAN FOR USE | | | DURING CONSTRUCTION | | | | | | | | | THE INCREASE IN IMPERMEABLE AREA MAY BE COVERED UNDER | | | THE PRIOR IMPROVEMENTS IF SO THE APPLICATION SHOULD | | | INDICATE SUCH. |
|
|
| Review Stop |
SURVEY |
SURVEYING |
| Rev No |
1 |
Status |
P |
Date |
12-02-2010 |
|
|
Cont ID |
|
| Sent By |
vnoel |
Date |
12-02-2010 |
Time |
14:21 |
Rev Time |
0.00 |
| Received By |
vnoel |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2010-12-02 14:21:07 | NO COMMENTS |
|
|
| Review Stop |
TRAFFIC |
TRAFFIC ENGINEERING |
| Rev No |
1 |
Status |
P |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
12-06-2010 |
Time |
|
Rev Time |
0.00 |
| Received By |
bcollins |
Date |
12-06-2010 |
Time |
08:48 |
Sent To |
|
|
| Notes |
| 2010-12-06 08:48:04 | NO COMMENTS |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
12-06-2010 |
|
|
Cont ID |
|
| Sent By |
aaponte |
Date |
12-06-2010 |
Time |
09:42 |
Rev Time |
0.00 |
| Received By |
aaponte |
Date |
12-06-2010 |
Time |
09:41 |
Sent To |
|
|
| Notes |
| 2010-12-06 11:57:09 | 1. NORTHERN SIDEWALK IS A DEAD - END. PLEASE CONSIDER | | | CONNECTING IT TO THE 3RD STREET SIDEWALK OR TO THE | | | STORAGE ENTRANCE. | | | 2. STORAGE ENTRANCE NEEDS A HARD SURFACE (SIDEWALK) TO | | | CONNECT TO PROPOSED SIDEWALK. | | | 3. PLEASE CORRECT NOTE ON LP-1 . EXISTING ZONING | | | DESIGNATION IS QGD-10. | | | | | | GENERAL DESIGN COMMENTS: | | | THE PLANNING DEPARTMENT APPLAUDS THE COUNTY'S EFFORTS | | | TO CREATE A UNIQUE OPEN SPACE AT THE RESTORED HISTORIC | | | COURTHOUSE PROPERTY. THE CONSTRUCTION OF A PUBLIC | | | ASSEMBLY PLAZA WILL ENHANCE THE CHARACTER OF THE SPACE | | | AND THE URBAN LIFE OF DOWNTOWN. | | | IN REFERENCE TO THE PROPOSED DESIGN, STAFF HAS THE | | | FOLLOWING CONCERNS AND COMMENTS: | | | - THE PROPOSED GEOMETRY (CIRCULAR PATTERN) SEEMS | | | FOREIGN TO THE COMPLEX WHICH, BASED ON ITS EXISTING | | | SIDEWALK AND PLANTING SCHEME, FOLLOWS A VERY ORTHOGONAL | | | PATTERN. | | | - THE PROPOSED THREE DIMENSIONAL SCULPTURAL INTENT OF | | | THE STRUCTURE IS DIMINISHED BY THE PROPOSED FLAT ROOF. | | | - THE SELECTED NATIVE PLANT MATERIAL REQUIRES AN | | | UPGRADE OF THE ENTIRE SITE TO INTEGRATE THE NEW | | | PROPOSAL WITH THE EXISTING. | | | - CONSIDERATION SHOULD BE GIVEN TO THE COLOR SCHEME | | | UTILIZING BRONZE OR GREEN COLORED METAL MATERIALS TO | | | RELATE TO BOTH BUILDINGS AND LANDSCAPING. | | | - RECONSIDERATION OF THE STRUCTURAL ELEMENT OF THE BELL | | | TO ENHANCE THE FEATURE. | | | | | | | | | |
|
|
| |