Review Stop ENG-A ENGINEERING FORMAL REVIEW
Rev No 1 Status F Date 06-09-2023 Cont ID  
Sent By lquinone Date 06-09-2023 Time 15:55 Rev Time 0.00
Received By lquinone Date 06-09-2023 Time 15:55 Sent To  
Notes
2023-06-09 15:55:28E23040038 ??? BIG DADDY???S ??? 4000 S DIXIE HWY FIRST
 REVIEW 4.21.23
  
 COMMENTS FROM LINDA QUINONES-CINTRON, PROJECT
 COORDINATOR, ENGINEERING SERVICES DEPT., 561-494-1085
 [email protected] :
 1. CONFIRM THAT A COMPLETED LOS ANALYSIS SUMMARY TABLE
 HAS BEEN SUBMITTED DIRECTLY TO ENGINEERING (SHEET 33 OF
 CITY OF WPB DEVELOPMENT APPLICATION).
 2. CHECK TO SEE IF FDEP FORMS FOR PROPOSED SANITARY
 SEWER ARE REQUIRED.
 3. PROVIDE CALCULATIONS ON PLANS OF EXISTING AND
 PROPOSED DEMANDS FOR WATER & SEWER (AVERAGE, MAXIMUM
 AND PEAK) AND FIRE FLOW DEMANDS. CALCULATIONS SHALL BE
 PER FAC 64E-8 FOR WATER AND PER FAC 64-E.008 FOR SEWER.
 4. PLEASE PROVIDE CALCULATIONS OF REVISED PERVIOUS AND
 IMPERVIOUS CALCULATIONS FOR THE PROPOSED IMPACTED
 AREAS.
 5. COORDINATE WITH MARK HURLEY, FIELD CUSTOMER SERVICE
 SUPERVISOR WITH CITY OF WPB PUBLIC UTILITIES, REGARDING
 PLACEMENT OF BACKFLOW DEVICES AND WATER METERS. CONTACT
 HIM AT 561-494-2262 OR [email protected]
 6. PLANS SHALL SHOW EXISTING AND PROPOSED LOCATIONS AND
 DIMENSIONS OF ALL WATER, STORMWATER, AND SANITARY AND
 SEWER LINES AND CLEANOUTS, GREASE TRAPS, ETC. INCLUDING
 STUBS TO EACH PROPERTY LINE FOR WATER AND SANITARY
 SEWERS, THE MAKE AND MODEL OF ALL VALVES, POTABLE AND
 IRRIGATION METERS, BACKFLOWS, FIRE HYDRANTS AND FDCS,
 AND OTHER DEVICES TO BE INSTALLED ON THE SYSTEM, CATCH
 BASINS, CULVERTS, DITCHES INCLUDING GRADES, PIPES
 SIZES, MATERIALS, ELEVATIONS, ASSUMPTIONS,
 CALCULATIONS, INVERT ELEVATIONS FOR ALL INLETS AND
 MANHOLES AND PROFILES OF SANITARY SEWER LINES. GATE
 VALVE BOXES SHALL NOT BE INSTALLED IN CURB OR SIDEWALK.
 ALL AVAILABLE ELEVATION SHALL BE SHOWN ON THE PROFILE
 VIEW. DIRECTION OF FLOW SHALL BE SHOWN ON PLAN VIEW ON
 PLAN VIEW FOR ALL SANITARY AND STORM SEWERS. PLEASE
 SHOW SLOPE % ON ALL SANITARY LINES AND CALL OUT
 MATERIAL. ADDITIONALLY, PLAN VIEW SHALL SHOW ALL
 EXISTING AND PROPOSED UNDERGROUND UTILITY LAYOUT,
 INCLUDING FIBER OPTIC, ELECTRIC, GAS, AND CABLEVISION &
 TELECOMMUNICATION FACILITIES INCLUDING PIPES SIZES AND
 MATERIALS, LOCATED ON THE RIGHT-OF-WAY.
 7. PLEASE CUT AND CAP UTILITIES NOT IN USE AND REMOVE
 ANY ABANDONED UTILITY LINES LARGER THAN 2 INCHES FROM
 CITY RIGHT OF WAY.
 8. PLEASE SHOW EXISTING AND PROPOSED UTILITY EASEMENTS,
 INCLUDING THOSE PROPOSED TO ALLOW ACCESS FOR CITY
 PERSONNEL TO PROPOSED UTILITY WATER METERS.
 9. PLEASE PROVIDE ENLARGED VIEW ON PLANS OF PROPOSED
 LOCATION OF WATER METER AND BACKFLOW PREVENTION, AND
 EXISTING METER AND BACKFLOW (TO BE REMOVED?). BACKFLOWS
 SHALL BE INSTALLED ON PRIVATE PROPERTY OUTSIDE OF
 EASEMENTS AND RIGHTS OF WAY. DOMESTIC WATER METERS
 SHALL BE INSTALLED IMMEDIATELY ADJACENT TO PROPERTY
 LINE. 3 INCH AND LARGER WATER METERS SHALL BE INSTALLED
 ABOVE-GROUND ONLY.
 10. PLEASE CALLOUT DOMESTIC BACKFLOW PREVENTER AS RPPA
 AND FIRE BACKFLOW PREVENTER AS DCDA. SPECIFY LEAD FREE
 DESIGN ON ALL BACKFLOWS.
 11. ENGINEERING PLANS SHALL INCLUDE PIGGING, FLUSHING
 AND SAMPLE POINTS ON ANY WATER RUNS 60 FT. IN LENGTH OR
 GREATER.
 12. FOR FORMAL ENGINEERING SUBMITTAL, SFWMD ERP AND
 NPDES NOI REQUIREMENTS WILL BE ENFORCED.
 - AN NOI IS REQUIRED FOR PROJECTS THAT:
 - 1) DISTURB ONE OF MORE ACRES OF LAND OR DISTURB LESS
 THAN ON ACRE OF LAND BUT ARE PART OF A COMMON PLAN OF
 DEVELOPMENT OR SALE;
 - 2) DISCHARGE STORMWATER TO SURFACE WATERS OF THE
 STATE OR TO SURFACE WATERS OF THE STATE THROUGH A
 MUNICIPAL SEPARATE STORM SEWER SYSTEM (MS4).
 - THE SFWMD ERP CAN BE OBTAINED THROUGH A 10-2 SELF
 CERTIFICATION THROUGH FDEP OR AN ERP APPLICATION
 THROUGH SFWMD. EITHER WAY, THE DEVELOPER/ENGINEER SHALL
 SUBMIT A COPY OF THE ERP PERMIT OR FDEP ACKNOWLEDGEMENT
 OF THE 10-2 CERTIFICATION.
 13. PROVIDE PROFILE AND CLEARANCES BETWEEN WATER, SEWER
 AND STORM LINES AT ALL UTILITY CROSSINGS WITHIN ROW PER
 CITY OF WEST PALM BEACH STANDARD DETAIL GN-2 SERIES.
 PLEASE SHOW ALL EXISTING AND PROPOSED UNDERGROUND
 UTILITY LAYOUT, INCLUDING FIBER OPTIC, ELECTRIC, GAS,
 AND CABLEVISION & TELECOMMUNICATION FACILITIES WITH
 PIPE MATERIAL AND SIZE, LOCATED ON THE RIGHT-OF-WAY.
 14. WHEN SUBMITTING APPROVED MATERIALS LIST, PLEASE
 PROVIDE MATERIAL/CUT SHEETS FOR ALL PROPOSED BACKFLOW
 DEVICES SHOWING SPECIFIC MODEL NUMBER AND SPECIFYING
 USC APPROVED LEAD-FREE DESIGN.
 15. PLEASE CLEARLY SHOW ROAD RIGHT OF WAY.
 16. PLEASE PROVIDE SANITARY ELEVATIONS AT MANHOLE
 TIE-IN.
 17. IF SANITARY LINES ARE PROPOSED IN ROW PLEASE SHOW
 ADJACENT SANITARY LATERAL LOCATIONS AND SHOW ADDRESSES
 OF ADJACENT PARCELS.
 18. IF WATER LINES ARE BEING REPLACED IN ROW, SHOW
 ADJACENT PARCEL ADDRESSES.
 19. IF TRENCHING IN IN CITY-MAINTAINED ROADWAY AREAS
 ADD NOTE TO PROVIDE 50 FT. PAVEMENT RESTORATION
 TRANSITION ON EACH SIDE OF PROPOSED TRENCH PER CITY OF
 WPB STANDARD DETAIL GC-4.
 20. PLEASE PROVIDE LEGEND ON ALL PLAN SHEETS TO INCLUDE
 STREETLIGHT, SIGN POSTS, TRANSFORMER BOXES ETC.
 21. PLEASE RESPOND TO ALL COMMENTS IN WRITING AND
 INCLUDE PROJECT NAME, ADDRESS AND PERMIT NUMBER
 (E-XXXXXXXX).
  
  
 COMMENTS FROM MARK HURLEY, FIELD CUSTOMER SERVICE
 SUPER., WPB PUBLIC UTILITIES, 561-822-2262 OR
 [email protected]:
  
 -HISTORIC PICTURES SHOW GUY WIRE ANCHOR WEST OFF
 EXISTING UTILITY POLE NEAR NORTHEAST CORNER OF
 PROPERTY. WILL IT REMAIN?
  
 -SHOW ALL FRANCHISE UTILITIES NEAR WORK AREAS.
  
 -THERE ARE A COUPLE VAULTS THAT LOOK TO BE PARTIALLY
 COVERED BY PROPOSED BUILDING.
  
 -IF HAVE A SURVEY, ADD IT TO RESUBMITTAL PACKAGE.
  
 -IF THERE IS A LANDSCAPING PLAN, ADD IT TO RESUBMITTAL
 PACKAGE.
  
 -VERIFY THAT BUILDING WILL HAVE NO FIRE SPRINKLERS.
  
 -FOR WATER METER AREA ENLARGED DETAIL: PLEASE ADD
 REFERENCE TO THE ASSOCIATED WATER SERVICE STANDARD
 DETAIL TO THE LABELS FOR THE WATER METERS AND BACKFLOW
 ASSEMBLIES; ALSO ADD GRAPHIC SCALE.
  
 -SHEET C3.3: ADD MARKUP NOTE TO WS1 THAT DUAL CHECK IS
 NOT USED WHEN A BACKFLOW ASSEMBLY IS BEING INSTALLED.
  
 -EXISTING IRRIGATION METER IS 5/8???. PLEASE VERIFY
 WILL NEED INCREASE TO ?????.
  
 -EXISTING DOMESTIC METER IS 5/8???. PLEASE VERIFY WILL
 NEED INCREASE TO 1???.
  
  
 COMMENTS FROM TRACY WARD, SR. STORMWATER ENG.,
 ENGINEERING SERVICES, [email protected] 561-494-1120:
 1. STORMWATER MANAGEMENT CALCULATIONS
 A. REVIEW PAVEMENT SURFACE STORAGE VALUE OF 0.28 AC-FT
 AT ELEVATION 12.5 FT NAVD. REVIEWER CALCULATED STORAGE
 VALUE OF 0.19 AC-FT.
  
 2. FDOT PERMIT WILL BE NEEDED FOR THE WORK WITHIN THE
 RIGHTS OF WAY OF S. DIXIE HWY AND SOUTHERN BLVD.
  
 3. SHEET C2.1
 A. SEE COMMENTS FOR SHEETS C2.2 AND C4.1 FOR ITEMS TO
 SHOW AS PROPOSED IMPROVEMENTS ON SHEET C2.1
 B. SHOW AND LABEL 2-FT LANDSCAPE OVERHANG OF PARKING
 SPACES.
  
 4. SHEET C2.2
 A. REPLACE ALL EXISTING DRIVEWAY APRONS WITH TYPE
 ???F??? CURB AND GUTTER AND SIDEWALK.
 B. DROP CURB CALLED OUT FOR PROPOSED DRIVEWAYS TO
 SOUTHERN BLVD AND TO S. DIXIE HWY. SECTIONS A AND B ON
 SHEET C3.2 CALL OUT 3 FT WIDE VALLEY GUTTER.
 C. CONFIRM WITH FDOT THE DIVIDER ISLAND AND THE
 EXTENSION OF TYPE ???D??? CURBS ON BOTH SIDES OF THE
 DRIVEWAY TO S. DIXIE HWY CAN ENCROACH INTO THE RIGHT OF
 WAY.
  
 5. SHEET C3.2
 A. SECTION A
 I. EXTEND SECTION TO THE HIGH POINT OF THE DRIVEWAY.
 SHOW DISTANCE FROM THE HIGH POINT TO THE R/W LINE.
 B. SECTION B
 I. CONSIDER DRIVEWAY SECTION A1 PER FDOT STANDARD PLAN
 INDEX 522-003.
 II. CONSIDER DROP CURB INSTEAD OF 3 FT WIDE VALLEY
 GUTTER.
 C. SECTION C
 I. SHOW 2 FT LANDSCAPE OVERHANG OR ADD WHEEL STOPS AND
 INCREASE PARKING STALL DEPTHS TO 18 FEET AND REDUCE THE
 DRIVE AISLE WIDTH TO 26 FEET.
 II. WHAT IS THE 2 FT DIMENSION FOR ON THE LEFT SIDE OF
 THE SWALE?
  
 6. SHEET C4.1
 A. SHOW REMOVAL OF SIDEWALK, CURB AND GUTTER ALONG
 MALVERNE ROAD FRONTAGE TO MATCH WHAT IS PROPOSED AS NEW
 CONCRETE WORK ON SHEET C2.1.
 B. SHOW REMOVAL OF EXISTING DROP CURB FOR THE EXISTING
 NORTH DRIVEWAY TO S. DIXIE HWY.
 C. SHOW REMOVAL OF SIDEWALK, CURB AND GUTTER AT
 PROPOSED DRIVEWAY LOCATIONS.
  
  
  
 COMMENTS FROM RICKY ELIZONDO, PUB. UTILITIES PLANS
 EXAMINER, [email protected] , 561-494-1101:
 -LIST SIZE AND MATERIAL FOR ALL EXISTING AND PROPOSED
 UTILITIES
 -LABEL ALL EXISTING UTILITIES WITH IN THE PROJECT
 SCOPE, INCLUDING DRY/FRANCHISE UTILITIES
 -PROVIDE PROFILES FROM THE TAP TO THE CITY'S POINT OF
 SERVICE TO ENSURE PROPER CLEARANCES FOR UTILITY
 CONFLICTS
 -PROVIDE PROJECT ADDRESS AS WELL AS ADJACENT PARCELS
 -SHOW ALL UNDERGROUND DRY UTILITIES WITHIN THE PROJECT
 LIMITS
 -DENOTE THE LIFT STATION BOUNDARY THAT THE PROJECT
 FALLS WITHIN
 -PRINT SHEETS SO THAT THEY ARE TO SCALE ON 11X17 PAPER
 -SHOW FULL EXTENTS OF WM ALONG PROJECT SCOPE
 -DENOTE REMOVAL OF ALL EXISTING SERVICES/METERS NOT TO
 BE USED UP TO THE MAIN
 -SHOW ALL VALVES AND APPURTENANCES LEGIBLY ON PLAN VIEW
 -CLEARANCE BETWEEN SANITARY SEWER LATERAL AND WATER
 MAIN NOT IN COMPLIANCE WITH DETAIL GN-2.1 STANDARDS
 REGARDING VERTICAL CLEARANCE BETWEEN PIPES.
  
  

Review Stop ENG-D ENGINEERING DEFICIENCY REVIEW
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-E ENGINEERING ENVR. MIT. REVIEW
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-F ENGINEERING FINAL DRAWING REV
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-M ENGINEERING MODIFICATION REV
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-P ENGINEERING PLANNING REVIEW
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-T ENGINEERING TRAFFIC STUDY REV
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved