Plan Review Details - Project E23030044
Plan Review Stops For Project E23030044
Review Stop ENG-A ENGINEERING FORMAL REVIEW
Rev No 1 Status F Date 04-26-2023 Cont ID  
Sent By lquinone Date 04-26-2023 Time 14:34 Rev Time 0.00
Received By lquinone Date 04-26-2023 Time 14:34 Sent To  
Notes
2023-04-26 14:34:39E23030044 BELMART PLAZA, 638 BELVEDERE - INITIAL REVIEW
 3.30.23
  
 NO COMMENTS FROM RICK ROSSANO, PROJECT COORDINATOR,
 ENGINEERING SERVICES DEPT., 561-494-1098
 [email protected] :
  
  
 NO COMMENTS FROM MARK HURLEY, FIELD CUSTOMER SERVICE
 SUPER., WPB PUBLIC UTILITIES, 561-822-2262 OR
 [email protected]:
  
  
 COMMENTS FROM TRACY WARD, SR. STORMWATER ENG.,
 ENGINEERING SERVICES, [email protected] 561-494-1120:
 1. UPDATE THE LIST OF CONTACTS ON THE COVER SHEET.
 2. LIST THE VERTICAL DATUM REFERENCE ON EVERY SHEET
 WITH ELEVATION INFORMATION AND PROVIDE THE CONVERSION
 EQUATION TO NGVD1929.
 3. INCLUDE 18??? OR 24??? SUMP IN THE DRAINAGE INLET.
 INCLUDE A WEEP HOLE IF WATER TABLE IS MORE THAN TWO
 FEET BELOW THE BOTTOM OF THE STRUCTURE.
 4. PROVIDE PARKING SPACE STRIPING DETAIL. SEE CITY
 DEVELOPMENT CODE SECTION 94-485 FOR APPROPRIATE
 DIMENSIONS.
  
  
 COMMENTS FROM RICKY ELIZONDO, PUB. UTILITIES PLANS
 EXAMINER, [email protected] , 561-494-1101:
 -EXISTING WATER MAIN ON GEORGIA AVE. NOT SHOWN
 -SHOW AND LABEL ALL EXISTING VALVES/APPURTENANCES FOR
 WATER AND SEWER
 -SHOW ALL EXISTING DRY UTILITIES
  
 FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR
 CONCERNS, THANKS.
  

Review Stop ENG-D ENGINEERING DEFICIENCY REVIEW
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-E ENGINEERING ENVR. MIT. REVIEW
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-F ENGINEERING FINAL DRAWING REV
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-M ENGINEERING MODIFICATION REV
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-P ENGINEERING PLANNING REVIEW
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-T ENGINEERING TRAFFIC STUDY REV
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved