Plan Review Details - Project E23030001
Plan Review Stops For Project E23030001
Review Stop ENG-A ENGINEERING FORMAL REVIEW
Rev No 1 Status F Date 03-24-2023 Cont ID  
Sent By lquinone Date 03-24-2023 Time 15:23 Rev Time 0.00
Received By lquinone Date 03-24-2023 Time 15:23 Sent To  
Notes
2023-03-24 15:25:08E23030001 AC MARRIOTT, 414 GARDENIA AVE 2.28.23 REVIEW
 COMMENTS FROM RICK ROSSANO, PROJECT COORDINATOR,
 ENGINEERING SERVICES DEPT., 561-494-1098
 [email protected] :
 1. CONFIRM THAT A COMPLETED LOS ANALYSIS SUMMARY TABLE
 HAS BEEN SUBMITTED DIRECTLY TO ENGINEERING (SHEET 33 OF
 CITY OF WPB DEVELOPMENT APPLICATION).
 2. CHECK TO SEE IF FDEP FORMS FOR PROPOSED SANITARY
 SEWER ARE REQUIRED.
 3. PROVIDE CALCULATIONS ON PLANS OF FIRE FLOW DEMANDS.
 CALCULATIONS SHALL BE PER FAC 64E-8 FOR WATER AND PER
 FAC 64-E.008 FOR SEWER.
 4. COORDINATE WITH MARK HURLEY, FIELD CUSTOMER SERVICE
 SUPERVISOR WITH CITY OF WPB PUBLIC UTILITIES, REGARDING
 PLACEMENT OF BACKFLOW DEVICES AND WATER METERS. CONTACT
 HIM AT 561-494-2262 OR [email protected]
 5. PLANS SHALL SHOW EXISTING AND PROPOSED LOCATIONS AND
 DIMENSIONS OF ALL WATER, STORMWATER, AND SANITARY AND
 SEWER LINES AND CLEANOUTS, GREASE TRAPS, ETC. INCLUDING
 STUBS TO EACH PROPERTY LINE FOR WATER AND SANITARY
 SEWERS, THE MAKE AND MODEL OF ALL VALVES, POTABLE AND
 IRRIGATION METERS, BACKFLOWS, FIRE HYDRANTS AND FDCS,
 AND OTHER DEVICES TO BE INSTALLED ON THE SYSTEM, CATCH
 BASINS, CULVERTS, DITCHES INCLUDING GRADES, PIPES
 SIZES, MATERIALS, ELEVATIONS, ASSUMPTIONS,
 CALCULATIONS, INVERT ELEVATIONS FOR ALL INLETS AND
 MANHOLES AND PROFILES OF SANITARY SEWER LINES. GATE
 VALVE BOXES SHALL NOT BE INSTALLED IN CURB OR SIDEWALK.
 ALL AVAILABLE ELEVATION SHALL BE SHOWN ON THE PROFILE
 VIEW. DIRECTION OF FLOW SHALL BE SHOWN ON PLAN VIEW ON
 PLAN VIEW FOR ALL SANITARY AND STORM SEWERS. PLEASE
 SHOW SLOPE % ON ALL SANITARY LINES AND CALL OUT
 MATERIAL. ADDITIONALLY, PLAN VIEW SHALL SHOW ALL
 EXISTING AND PROPOSED UNDERGROUND UTILITY LAYOUT,
 INCLUDING FIBER OPTIC, ELECTRIC, GAS, AND CABLEVISION &
 TELECOMMUNICATION FACILITIES INCLUDING PIPES SIZES AND
 MATERIALS, LOCATED ON THE RIGHT-OF-WAY.
 6. PLEASE CUT AND CAP UTILITIES NOT IN USE AND REMOVE
 ANY ABANDONED UTILITY LINES LARGER THAN 2 INCHES FROM
 CITY RIGHT OF WAY.
 7. PLEASE SHOW EXISTING AND PROPOSED UTILITY EASEMENTS,
 INCLUDING THOSE PROPOSED TO ALLOW ACCESS FOR CITY
 PERSONNEL TO PROPOSED UTILITY WATER METERS.
 8. DOMESTIC WATER METERS SHALL BE INSTALLED IMMEDIATELY
 ADJACENT TO PROPERTY LINE. 3 INCH AND LARGER WATER
 METERS SHALL BE INSTALLED ABOVE-GROUND ONLY.
 9. PLEASE CALLOUT DOMESTIC BACKFLOW PREVENTER AS RPPA
 AND FIRE BACKFLOW PREVENTER AS DCDA. SPECIFY LEAD FREE
 DESIGN ON ALL BACKFLOWS.
 10. ENGINEERING PLANS SHALL INCLUDE PIGGING, FLUSHING
 AND SAMPLE POINTS ON ANY WATER RUNS 60 FT. IN LENGTH OR
 GREATER.
 11. FOR FORMAL ENGINEERING SUBMITTAL, SFWMD ERP AND
 NPDES NOI REQUIREMENTS WILL BE ENFORCED.
 - AN NOI IS REQUIRED FOR PROJECTS THAT:
 - 1) DISTURB ONE OF MORE ACRES OF LAND OR DISTURB LESS
 THAN ON ACRE OF LAND BUT ARE PART OF A COMMON PLAN OF
 DEVELOPMENT OR SALE;
 - 2) DISCHARGE STORMWATER TO SURFACE WATERS OF THE
 STATE OR TO SURFACE WATERS OF THE STATE THROUGH A
 MUNICIPAL SEPARATE STORM SEWER SYSTEM (MS4).
 - THE SFWMD ERP CAN BE OBTAINED THROUGH A 10-2 SELF
 CERTIFICATION THROUGH FDEP OR AN ERP APPLICATION
 THROUGH SFWMD. EITHER WAY, THE DEVELOPER/ENGINEER SHALL
 SUBMIT A COPY OF THE ERP PERMIT OR FDEP ACKNOWLEDGEMENT
 OF THE 10-2 CERTIFICATION.
 12. PROVIDE PROFILE AND CLEARANCES BETWEEN WATER, SEWER
 AND STORM LINES AT ALL UTILITY CROSSINGS WITHIN ROW PER
 CITY OF WEST PALM BEACH STANDARD DETAIL GN-2 SERIES.
 PLEASE SHOW ALL EXISTING AND PROPOSED UNDERGROUND
 UTILITY LAYOUT, INCLUDING FIBER OPTIC, ELECTRIC, GAS,
 AND CABLEVISION & TELECOMMUNICATION FACILITIES WITH
 PIPE MATERIAL AND SIZE, LOCATED ON THE RIGHT-OF-WAY.
 13. WHEN SUBMITTING APPROVED MATERIALS LIST, PLEASE
 PROVIDE MATERIAL/CUT SHEETS FOR ALL PROPOSED BACKFLOW
 DEVICES SHOWING SPECIFIC MODEL NUMBER AND SPECIFYING
 USC APPROVED LEAD-FREE DESIGN.
 14. IF SANITARY LINES ARE PROPOSED IN ROW PLEASE SHOW
 ADJACENT SANITARY LATERAL LOCATIONS AND SHOW ADDRESSES
 OF ADJACENT PARCELS.
 15. UPDATE NOTE TO PROVIDE 50 FT. PAVEMENT RESTORATION
 TRANSITION ON EACH SIDE OF PROPOSED TRENCH PER CITY OF
 WPB STANDARD DETAIL GC-4.
 16. PLEASE PROVIDE LEGEND ON ALL PLAN SHEETS TO INCLUDE
 STREETLIGHT, SIGN POSTS, TRANSFORMER BOXES ETC.
 17. PLEASE RESPOND TO ALL COMMENTS IN WRITING AND
 INCLUDE PROJECT NAME, ADDRESS AND PERMIT NUMBER
 (E-XXXXXXXX).
 COMMENTS FROM MARK HURLEY, FIELD CUSTOMER SERVICE
 SUPER., WPB PUBLIC UTILITIES, 561-822-2262 OR
 [email protected]:
  
 -SUBMIT COPY OF SURVEY IN RESUBMITTAL PACKAGE. ENSURE
 THAT IT IS SIGNED.
 -ADD GRAPHIC SCALE TO DETAIL A ON SHEET C10.
 -ADD METER BOX REMOVAL AND SIDEWALK REPLACEMENT ON DEMO
 PLAN???? (NEED TO DO SITE VISIT TO SEE METERS)
 -VERIFY PRIVATE FIRE SYSTEM WILL NOT HAVE CHEMICAL
 ADDITIVES OR AN AUXILIARY WATER SUPPLY SUCH AS A WELL.
 -SOME PLAN SHEETS SHOW STRAY BFP NEAR THE NORTHWEST
 AREA OF STAIR 3 DESPITE CALLING FOR REMOVAL ON DEMO
 PLAN.
 -CLEARLY SHOW AND LABEL PROPERTY LINES.
 -CITY DOES NOT OFFER ????? IRRIGATION METERS. PLEASE
 UPDATE SIZE OF IRRIGATION METER ON UTILITY PLAN.
 -RELOCATE IRRIGATION METER BOX NORTH CLOSER TO
 SIDEWALK, BUT KEEP IT IN LANDSCAPING.
 -SHEET C10 DETAIL A: HARD TO READ CALLOUT FOR 4???
 BACKFLOWS. PLEASE MAKE CLEARER. ALSO ADD WORDING
 DUAL/PARALLEL IF INTENDING FOR TWO INSTEAD OF ONE.
 -CALLOUT SIZE AND MATERIAL TYPE FOR IRRIGATION SERVICE
 PIPING AS WELL AS DOMESTIC AND FIRE.
 -UPDATE STANDARD DETAIL REFERENCE NUMBERS IN DETAIL A
 C10.
 -ADD REFERENCE TO RESPECTIVE WATER SERVICE STANDARD
 DETAILS FOR THE WATER METERS AND DCDA.
 -REPLACE WPB STANDARD DETAILS WITH MOST RECENT
 PUBLISHED REVISION DATE.
 -ADD WATER SERVICE STANDARD DETAIL WS7 AND WS3 TO SHEET
 C12.
 -SHOW AND LABEL SAMPLE POINTS IF NEEDED OR REQUIRED.
 -ADD FLOW CALCULATION TO SHEET C10 AS DIRECTED IN WS7
 NOTE 7.
 -ADD FLOW CALCULATION TO SHEET C10 AS DIRECTED IN WS5
 NOTE 9.
 -LABEL EXISTING AT&T VAULT IN NORTH SIDEWALK ON ALL
 PLAN SHEETS. IF ANY UTILITIES ARE TRAVELING TO OR FROM
 THAT VAULT UNDER SIDEWALK, SO AND LABEL THOSE ON PLANS.
 -ADD NOTE ON SHEET C10: FOR EXISTING WATER SERVICES
 THAT WILL REMAIN AND SERVE PROPERTY, REPLACE METER
 BOXES AND LIDS. BOXES SHALL BE CENTERED/ALIGNED
 PROPERLY FOR WATER METER AND BE COMPLIANT WITH WPB AML.
 CONCRETE POURED AROUND THOSE METER BOXES NEED BE 6 INCH
 THICK 18 INCHES OUT AND CANNOT CONTAIN SIDEWALK JOINTS.
 WATER SERVICES THAT ARE BEING REMOVED SHALL ALSO HAVE
 THE METER BOXES REMOVED.
 -THERE IS SOME KIND OF SMALL METALLIC VALVE BOX OR
 MONITORING WELL IN THE NORTHERN DRIVEWAY APPROACH.
 PLEASE SHOW AND LABEL IT ON PLANS.
 -ON NORTH SIDEWALK, COMPARE THE EXISTING WATER SERVICES
 ON THE DEMO AND UTILITY PLANS. THEY DO NOT SEEM TO
 MATCH IN TERMS OF WHICH PROPOSED TO BE REMOVED AND
 REMAIN.
 -PROPOSED TRANSFORMER AND RETAIL RPZ NEAR SOUTHEAST
 CORNER OF BUILDING CONFLICT WITH PROPOSED LANDSCAPING
 AS SHOWN ON LP1.
 -PROPERTY OWNER WILL HAVE TO RECORD BACKFLOW COVENANT
 AS A CONDITION OF WATER SERVICE. CAN CONTACT
 [email protected] FOR THE FORM AND DIRECTIONS.
 -IRRIGATION PLAN SHOWED PVB. PVB MAY NOT BE USED AS A
 CONTAINMENT ASSEMBLY. CONTAINMENT ASSEMBLY NEEDS TO BE
 RPZ TYPE, LEAD-FREE, AND USC APPROVED.
 -NORTHERN RPZ IS LOCATED IN RIGHT OF WAY. SHOULD BE ON
 PRIVATE PROPERTY. CONSIDER RELOCATING ALONG MEETING
 ROOM WALL.
  
 COMMENTS FROM TRACY WARD, SR. STORMWATER ENG.,
 ENGINEERING SERVICES, [email protected] 561-494-1120:
 1. PROVIDE VERTICAL CLEARANCE INFORMATION BETWEEN THE
 PROPOSED 18??? RCP AND THE 6??? FIRE WATER MAIN
 CROSSING EAST OF CATCH BASIN NO. 4.
  
 2. PROVIDE VERTICAL CLEARANCE INFORMATION BETWEEN THE
 PROPOSED 18??? RCP AND THE 6??? FIRE HYDRANT MAIN
 CROSSING WEST OF STRUCTURE NO. 3.
  
 3. DETERMINE THE CHANGE IN THE HYDRAULIC GRADE LINE FOR
 THE DRAINAGE STRUCTURES IN THE RIGHT OF WAY UPSTREAM OF
 THE ORIGINAL CONNECTION POINT OF THE ON-SITE DRAINAGE
 SYSTEM FOR THE 5-YEAR STORM EVENT. MOVING THE ON-SITE
 DRAINAGE SYSTEM CONNECTION POINT UPSTREAM WILL CREATE
 MORE HEAD LOSS IN THE ROADWAY DRAINAGE SYSTEM.
  
 4. PROVIDE CALCULATIONS SUPPORTING THE NEED FOR THE
 18??? OUTFALL PIPE CONNECTION TO THE ROADWAY SYSTEM
 INSTEAD OF 15??? DIAMETER PIPE.
  
 5. THREE DRAINAGE STRUCTURES ARE NUMBERED NO. 4. CAN
 THESE BE CHANGED TO AVOID DUPLICATE NUMBERS?
  
 6. LABEL THE PIPE (SIZE, MATERIAL AND LENGTH) BETWEEN
 YARD DRAIN NO. 4 AND THE STORAGE VAULT. NOTE THIS PIPE
 IS DESIGNED WITH AN ADVERSE SLOPE.
  
 7. THE DRIVEWAY FLARES (YELLOW HI-LIGHTED LINES) DO NOT
 APPEAR TO LINE UP (RED LINES) WITH THE DRIVEWAY WIDTH
 (CYAN LINES): (PLEASE SEE DRAWING ON REVIEW COMMENTS
 SENT BY EMAIL ON 03.24.23)
  
 8. CAN CATCH BASIN NO. 4 BE MOVED TO THE EAST END OF
 THE ON-STREET PARKING? THE 4 FEET OF SIDEWALK/TREE
 SPACE ADJACENT TO THE BACK OF CURB CAN HAVE A SLOPE
 STEEPER THAN 2%.
  
 9. FLAT EP TO THE EAST OF THE SECTION A-A SYMBOL (14.05
 SPOT GRADES).
  
 10. EXTEND THE TYPE ???F??? C&G ALONG THE DIAGONAL TO
 THE EAST END OF THE ON-STREET PARKING (GREEN LINE IN
 THE SNIPPET ABOVE).
  
 11. SHEET C-07
 A. DETAIL 10 CONTROL STRUCTURE - WRONG WEIR ELEVATION
 LISTED IN SECTION VIEW AND REFERENCED TO WRONG VERTICAL
 DATUM.
  
 12. WHERE IS THICKENED EDGE SIDEWALK BEING CONSTRUCTED?
  
 13. SHEET C-09 PAVEMENT LEGEND:
 A. NO CALLOUTS FOR SYMBOLS B OR C.
 B. WHY 4,000 PSI CONCRETE FOR DRIVEWAYS INSTEAD OF
 3,000 PSI CONCRETE.
  
 COMMENTS FROM RICKY ELIZONDO, PUB. UTILITIES PLANS
 EXAMINER, [email protected] , 561-494-1101:
 -RE-EXAMINE EXISTING WATER MAIN CONFIGURATION ON
 GARDENIA
 -PORTIONS OF WM ON GARDENIA ARE CAST IRON FROM 1937,
 MAY REQUIRE REPLACEMENT UPON FURTHER EXAMINATION
 -ANCHOR TEE REQUIRED FOR FIRE HYDRANT CONNECTION PER
 DETAIL P-8
 -MANHOLE WITH PROPOSED 10??? LATERAL CONNECTION WILL
 REQUIRE REHABBING WITH A 10??? CLEANOUT AT PROPERTY
 LINE WITH EASEMENTS AS REQUIRED
 -COLL OUT ALL LATERAL SIZES AND THEIR CLEANOUTS WITH
 EASEMENTS AS REQUIRED
 -SCALE PLANS SO THEY ARE ABLE TO BE PRINTED ON 11X17
 -SHOW ALL EXISTING CONNECTIONS TO WATER MAIN, CUT AND
 CAP THOSE THAT WILL NO LONGER BE IN USE AT THE MAIN
 -METERS WILL SERVE AS POS FOR THE 4 INCH CONNECTIONS
 -CALL OUT MATERIALS FOR WATER CONNECTIONS
 -SHOW ALL EXISTING AND PROPOSED DRY UTILITIES
  
  
  

Review Stop ENG-D ENGINEERING DEFICIENCY REVIEW
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-E ENGINEERING ENVR. MIT. REVIEW
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-F ENGINEERING FINAL DRAWING REV
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-M ENGINEERING MODIFICATION REV
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-P ENGINEERING PLANNING REVIEW
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-T ENGINEERING TRAFFIC STUDY REV
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***