Plan Review Details - Project E23020040
Plan Review Stops For Project E23020040
Review Stop ENG-A ENGINEERING FORMAL REVIEW
Rev No 1 Status F Date 04-26-2023 Cont ID  
Sent By lquinone Date 04-26-2023 Time 14:28 Rev Time 0.00
Received By lquinone Date 04-26-2023 Time 14:28 Sent To  
Notes
2023-04-26 14:28:48E23020040 - 320 LAKEVIEW FIRST REVIEW 2.28.23
  
 COMMENTS FROM RICK ROSSANO, PROJECT COORDINATOR,
 ENGINEERING SERVICES DEPT., 561-494-1098
 [email protected] :
 1. CONFIRM THAT A COMPLETED LOS ANALYSIS SUMMARY TABLE
 HAS BEEN SUBMITTED DIRECTLY TO ENGINEERING (SHEET 33 OF
 CITY OF WPB DEVELOPMENT APPLICATION).
 2. CHECK TO SEE IF FDEP FORMS FOR PROPOSED SANITARY
 SEWER ARE REQUIRED.
 3. PRELIM. ENGINEERING PLANS ARE CLUTTERED AND
 DIFFICULT TO READ. PLEASE PROVIDE SEPARATE WATER/SEWER
 PLAN SHEET AND CLEARLY INDICATE WATER AND SEWER
 CONNECTIONS AS EXISTING OR PROPOSED.
 4. PROVIDE CALCULATIONS ON PLANS OF EXISTING AND
 PROPOSED DEMANDS FOR WATER & SEWER (AVERAGE, MAXIMUM
 AND PEAK) AND FIRE FLOW DEMANDS. CALCULATIONS SHALL BE
 PER FAC 64E-8 FOR WATER AND PER FAC 64-E.008 FOR SEWER.
 5. PLEASE PROVIDE CALCULATIONS OF REVISED PERVIOUS AND
 IMPERVIOUS CALCULATIONS FOR THE PROPOSED IMPACTED
 AREAS.
 6. COORDINATE WITH MARK HURLEY, FIELD CUSTOMER SERVICE
 SUPERVISOR WITH CITY OF WPB PUBLIC UTILITIES, REGARDING
 PLACEMENT OF BACKFLOW DEVICES AND WATER METERS. CONTACT
 HIM AT 561-494-2262 OR [email protected]
 7. PLANS SHALL SHOW EXISTING AND PROPOSED LOCATIONS AND
 DIMENSIONS OF ALL WATER, STORMWATER, AND SANITARY AND
 SEWER LINES AND CLEANOUTS, GREASE TRAPS, ETC. INCLUDING
 STUBS TO EACH PROPERTY LINE FOR WATER AND SANITARY
 SEWERS, THE MAKE AND MODEL OF ALL VALVES, POTABLE AND
 IRRIGATION METERS, BACKFLOWS, FIRE HYDRANTS AND FDCS,
 AND OTHER DEVICES TO BE INSTALLED ON THE SYSTEM, CATCH
 BASINS, CULVERTS, DITCHES INCLUDING GRADES, PIPES
 SIZES, MATERIALS, ELEVATIONS, ASSUMPTIONS,
 CALCULATIONS, INVERT ELEVATIONS FOR ALL INLETS AND
 MANHOLES AND PROFILES OF SANITARY SEWER LINES. GATE
 VALVE BOXES SHALL NOT BE INSTALLED IN CURB OR SIDEWALK.
 ALL AVAILABLE ELEVATION SHALL BE SHOWN ON THE PROFILE
 VIEW. DIRECTION OF FLOW SHALL BE SHOWN ON PLAN VIEW ON
 PLAN VIEW FOR ALL SANITARY AND STORM SEWERS. PLEASE
 SHOW SLOPE % ON ALL SANITARY LINES AND CALL OUT
 MATERIAL. ADDITIONALLY, PLAN VIEW SHALL SHOW ALL
 EXISTING AND PROPOSED UNDERGROUND UTILITY LAYOUT,
 INCLUDING FIBER OPTIC, ELECTRIC, GAS, AND CABLEVISION &
 TELECOMMUNICATION FACILITIES INCLUDING PIPES SIZES AND
 MATERIALS, LOCATED ON THE RIGHT-OF-WAY.
 8. PLEASE CUT AND CAP UTILITIES NOT IN USE AND REMOVE
 ANY ABANDONED UTILITY LINES LARGER THAN 2 INCHES FROM
 CITY RIGHT OF WAY.
 9. PLEASE SHOW EXISTING AND PROPOSED UTILITY EASEMENTS,
 INCLUDING THOSE PROPOSED TO ALLOW ACCESS FOR CITY
 PERSONNEL TO PROPOSED UTILITY WATER METERS.
 10. PLEASE PROVIDE ENLARGED VIEW ON PLANS OF PROPOSED
 LOCATION OF WATER METER AND BACKFLOW PREVENTION, AND
 EXISTING METER AND BACKFLOW (TO BE REMOVED?). BACKFLOWS
 SHALL BE INSTALLED ON PRIVATE PROPERTY OUTSIDE OF
 EASEMENTS AND RIGHTS OF WAY. DOMESTIC WATER METERS
 SHALL BE INSTALLED IMMEDIATELY ADJACENT TO PROPERTY
 LINE. 3 INCH AND LARGER WATER METERS SHALL BE INSTALLED
 ABOVE-GROUND ONLY.
 11. PLEASE CALLOUT DOMESTIC BACKFLOW PREVENTER AS RPPA
 AND FIRE BACKFLOW PREVENTER AS DCDA. SPECIFY LEAD FREE
 DESIGN ON ALL BACKFLOWS.
 12. ENGINEERING PLANS SHALL INCLUDE PIGGING, FLUSHING
 AND SAMPLE POINTS ON ANY WATER RUNS 60 FT. IN LENGTH OR
 GREATER.
 13. FOR FORMAL ENGINEERING SUBMITTAL, SFWMD ERP AND
 NPDES NOI REQUIREMENTS WILL BE ENFORCED.
 - AN NOI IS REQUIRED FOR PROJECTS THAT:
 - 1) DISTURB ONE OF MORE ACRES OF LAND OR DISTURB LESS
 THAN ON ACRE OF LAND BUT ARE PART OF A COMMON PLAN OF
 DEVELOPMENT OR SALE;
 - 2) DISCHARGE STORMWATER TO SURFACE WATERS OF THE
 STATE OR TO SURFACE WATERS OF THE STATE THROUGH A
 MUNICIPAL SEPARATE STORM SEWER SYSTEM (MS4).
 - THE SFWMD ERP CAN BE OBTAINED THROUGH A 10-2 SELF
 CERTIFICATION THROUGH FDEP OR AN ERP APPLICATION
 THROUGH SFWMD. EITHER WAY, THE DEVELOPER/ENGINEER SHALL
 SUBMIT A COPY OF THE ERP PERMIT OR FDEP ACKNOWLEDGEMENT
 OF THE 10-2 CERTIFICATION.
 14. PROVIDE PROFILE AND CLEARANCES BETWEEN WATER, SEWER
 AND STORM LINES AT ALL UTILITY CROSSINGS WITHIN ROW PER
 CITY OF WEST PALM BEACH STANDARD DETAIL GN-2 SERIES.
 PLEASE SHOW ALL EXISTING AND PROPOSED UNDERGROUND
 UTILITY LAYOUT, INCLUDING FIBER OPTIC, ELECTRIC, GAS,
 AND CABLEVISION & TELECOMMUNICATION FACILITIES WITH
 PIPE MATERIAL AND SIZE, LOCATED ON THE RIGHT-OF-WAY.
 15. WHEN SUBMITTING APPROVED MATERIALS LIST, PLEASE
 PROVIDE MATERIAL/CUT SHEETS FOR ALL PROPOSED BACKFLOW
 DEVICES SHOWING SPECIFIC MODEL NUMBER AND SPECIFYING
 USC APPROVED LEAD-FREE DESIGN.
 16. PLEASE CLEARLY SHOW ROAD RIGHT OF WAY.
 17. PLEASE PROVIDE SANITARY ELEVATIONS AT MANHOLE
 TIE-IN.
 18. IF SANITARY LINES ARE PROPOSED IN ROW PLEASE SHOW
 ADJACENT SANITARY LATERAL LOCATIONS AND SHOW ADDRESSES
 OF ADJACENT PARCELS.
 19. IF WATER LINES ARE BEING REPLACED IN ROW, SHOW
 ADJACENT PARCEL ADDRESSES.
 20. IF TRENCHING IN IN CITY-MAINTAINED ROADWAY AREAS
 ADD NOTE TO PROVIDE 50 FT. PAVEMENT RESTORATION
 TRANSITION ON EACH SIDE OF PROPOSED TRENCH PER CITY OF
 WPB STANDARD DETAIL GC-4. IF TRENCHING IN FDOT ROW,
 PROVIDE THEIR PAVEMENT RESTORATION DETAIL SEPARATELY.
 21. OBTAIN ALL REQUIRED FDOT PERMITS FOR WORK WITHIN
 THEIR ROW.
 22. PLEASE PROVIDE LEGEND ON ALL PLAN SHEETS TO INCLUDE
 STREETLIGHT, SIGN POSTS, TRANSFORMER BOXES ETC.
 23. PLEASE RESPOND TO ALL COMMENTS IN WRITING AND
 INCLUDE PROJECT NAME, ADDRESS AND PERMIT NUMBER
 (E-XXXXXXXX).
  
 COMMENTS FROM MARK HURLEY, FIELD CUSTOMER SERVICE
 SUPER., WPB PUBLIC UTILITIES, 561-822-2262 OR
 [email protected]:
  
 -NEAR THE NORTHWEST CORNER OF PROPERTY IN LANDSCAPING
 AREA IS A 2 INCH CITY IRRIGATION METER AND BACKFLOW
 ASSEMBLY. PLEASE CLEARLY SHOW AND LABEL THEM ON DEMO
 PLAN. THAT METERED WATER SERVICE CANNOT BE ALTERED
 WITHOUT APPROVAL OF CITY WPB PARKS DEPARTMENT.
  
 -820 S. DIXIE HWY CURRENTLY HAS AN ACTIVE METERED WATER
 SERVICE UNDER ACCOUNT HOLDER MG TWO LLC. VERIFY ACCOUNT
 HOLDER MG TWO LLC IS AWARE OF INTENTION TO ELIMINATE
 WATER SERVICE AND THEY APPROVE OF THAT.
  
 -ADD NOTE TO DEMO PLAN THAT WATER METER BOXES NEED TO
 BE REMOVED FOR ANY WATER SERVICE THAT IS BEING CUT AND
 CAPPED. CONTRACTOR SHALL RETURN ANY INSTALLED WATER
 METERS TO CITY WPB.
  
 -ON DEMO PLAN THERE ARE SOME WATER METER BOXES THAT DO
 NOT HAVE THE WATER SERVICES SHOWN AND LABELED. SHOW THE
 EXISTING WATER SERVICES AND ADD WHAT IS HAPPENING TO
 THEM ON THE LABEL.
  
 -ON DEMO PLAN, SHOW AND LABEL FIRELINE BACKFLOW
 ASSEMBLY. ADD WORDING TO RETURN DETECTOR METER TO CITY
 WPB ON THE LABEL.
  
 -CHECK LAKEVIEW AVE FOR ADDITIONAL AREAS OF PAVEMENT
 RESTORATION NEEDED ON PGD PLAN FOR UTILITY WORK IN THAT
 ROADWAY. LOOKS TO BE AT LEAST ONE AREA MISSED.
  
 -ON PGD PLAN, ADD THE SPECKLED/DOTTED SHADED AREA AT
 THE NORTH RIGHT OF WAY AREA TO THE LEGEND.
  
 -PROPOSED FIRE HYDRANT LOCATIONS DO NOT SEEM TO COMPLY
 WITH STANDARD DETAIL P8 NOTE 3.
  
 -SANITARY SEWER LATERAL CUT AND CAP LOCATIONS DO NOT
 SEEM CONSISTENT ON DIXIE HWY COMPARING THE DEMO PLAN
 AND UTILITY PLAN.
  
 -DOES FDOT APPROVE OF PROPOSED ENGINEERING PLANS?
  
 -SHEET C300: WATER SERVICE PIPE FOR 4 INCH METER SHOULD
 BE DUCTILE IRON INSTEAD OF PVC.
  
 -TAPPING SLEEVE LABELING IS NOT CONSISTENT.
  
 -4 INCH AND 6 INCH METER SHOWN IN NORTHWEST METER BANK
 ENLARGEMENT MAY NOT BE FED BY SINGLE 6 INCH TAP AND
 PIPE. 4 INCH METER SHOULD HAVE 4 INCH TAP AND SERVICE
 PIPE PER STANDARD DETAIL. 6 INCH METER SHOULD HAVE 6
 INCH TAP AND SERVICE PIPE PER STANDARD DETAIL.
  
 -NORTHWEST METER BANK ENLARGEMENT: ADD SIZE OF RPZS TO
 THE LABELS; ON THE METER AND BACKFLOW LABELS ADD
 REFERENCES TO THE ASSOCIATED WPB WATER SERVICE STANDARD
 DETAILS -SHOULD BE WS3 AND WS7; FOOTPRINT OF LARGE
 METER SERVICES AND VALVES MAY EXTEND NEAR THE ELECTRIC
 UTILITY.
  
 -LABEL THE EXISTING WATER MAIN SECTIONS ON LAKEVIEW AVE
 WITH PIPE SIZE AND MATERIAL TYPE.
  
 -NORTHEAST METER BANK ENLARGEMENT: ADD SIZE OF RPZS TO
 THE LABELS; ON THE METER AND BACKFLOW LABELS ADD
 REFERENCES TO THE ASSOCIATED WPB WATER SERVICE STANDARD
 DETAILS -SHOULD BE WS1 AND WS6; ON THE IRRIGATION METER
 LABEL ADD RPZ WORDING ALONG WITH RPZ SIZE.
  
 -INDICATE IF THERE WILL BE ANY DRAIN PIPES FROM THE
 COOLING TOWER. IF SO, WHERE WILL THAT WATER DRAIN TO?
  
 -FIRELINE WATER SERVICE DESIGN IS UNACCEPTABLE. REDUCE
 PIPE DISTANCE FROM TAP TO DDCV/DCDA.
  
 -C300 HAS CALLOUT SAYING PIV, SEE MEP. PROVIDE COPY OF
 MEP PLANS WITH RESUBMITTAL PACKAGE.
  
 -FIRELINE BACKFLOW ASSEMBLY IN BUILDING AND ASSOCIATED
 PIPING AND FITTINGS NEAR IT, MUST COMPLY WITH WPB
 UTILITIES AND ENGINEERING STANDARDS. FIRELINE BACKFLOW
 ASSEMBLY SHALL BE LEAD-FREE, USC APPROVED (BY
 ORIENTATION, MAKE, MODEL, SIZE, BYPASS, VALVING,
 ETC???), AND CORRECT TYPE (DCDA OR RPDA) BASED UPON WPB
 PUBLIC UTILITIES EVALUATION. FIRELINE BACKFLOW ASSEMBLY
 NEEDS TO HAVE OSY VALVES AND ALL PIPING UPSTEAM OF IT
 NEEDS TO BE DUCTILE IRON PIPE. SUFFICIENT SUPPORT IS
 ALSO NEEDED. INSTALLED BACKFLOW ASSEMBLY MUCH MATCH
 AML. NOTIFY FIRE SYSTEM DESIGNER OF THESE REQUIREMENTS
 AND ENSURE THEY ARE ADDED TO FIRE PLANS. ALSO ADD COPY
 OF FIRE PLANS TO RESUBMITTAL PACKAGE.
  
 -VERIFY PRIVATE FIRE SYSTEM WILL NOT HAVE ANY ADDED
 CHEMICALS OR AUXILIARY WATER SUPPLIES SUCH AS WELLS.
  
 -ADD WATER AND SEWER DEMAND CALCULATIONS TO UTILITY
 PLANS.
  
 -ADD FLOW CALCULATIONS FOR THE FIRELINE AS DIRECTED IN
 WATER SERVICE STANDARD DETAIL WS5 NOTE 9 TO SHEET C300.
  
 -ADD SEPARATE FLOW CALCULATIONS FOR THE 4 INCH METER
 AND 6 INCH WATER METER AS DIRECTED IN WATER SERVICE
 STANDARD DETAIL WS7 NOTE 7 TO SHEET C300.
  
 -SHEET C300: ADD REFERENCE TO WATER SERVICE STANDARD
 DETAIL WS5 ON THE LABEL FOR THE FIRELINE BACKFLOW
 ASSEMBLY.
  
 -SHEET C303: ON STANDARD DETAIL WS1, ADD MARKUP NOTE
 THAT DUAL CHECK IS NOT USED WHEN A BACKFLOW ASSEMBLY IS
 BEING INSTALLED.
  
 -SHEET C300: ADD NOTE THAT CONTRACTOR SUPPLIES AND
 INSTALLS LARGE WATER METER STRAINERS.
  
 -COULD NOT FIND ANY OF THE WATER AND SEWER UTILITY
 PROFILES IN THE PLAN SET. ALSO DID NOT SEE CROSSINGS
 CALLED OUT OR ELEVATIONS ON THE SANITARY SEWER
 STRUCTURES.
  
 -ADD SAMPLE POINT LOCATIONS IF ANY ARE NEEDED OR
 REQUIRED.
  
 -WILL ANY OF THE EASEMENTS SHOWN ON ALTA SURVEY REMAIN?
 IF SO, PLEASE SHOW AND LABEL THEM CLEARLY ON
 ENGINEERING PLANS.
  
 COMMENTS FROM TRACY WARD, SR. STORMWATER ENG.,
 ENGINEERING SERVICES, [email protected] 561-494-1120:
  
 1. SHEET C-010 DEMOLITION PLAN
 A. DEMO THE DROP CURB, CURB TRANSITIONS AND DRIVEWAY
 APRON FOR THE EXISTING DRIVEWAY ON LAKEVIEW AVENUE.
 B. DEMO ALL OF THE DROP CURB AND TRANSITION CURBS FOR
 THE EXISTING DRIVEWAYS ON OKEECHOBEE BLVD.
 C. DEMO THE CURB RAMP ON OKEECHOBEE BLVD AND THE TYPE
 ???F??? CURB AND GUTTER WHERE THE NEW CURB RAMPS WILL
 BE CONSTRUCTED.
  
 2. SHEET C-100 PRELIMINARY ENGINEERING PLAN
 A. CALL OUT NEW CURB/GUTTER AND SIDEWALK WHERE THE
 EXISTING DRIVEWAYS WERE REMOVED.
 B. CLARIFY WHERE THE TYPE ???A??? MOUNTABLE CURB WILL
 BE INSTALLED. IT APPEARS TO BE INSTALLED BEHIND THE
 PROPOSED VALLEY GUTTER.
 C. SYMBOL FOR PROPOSED LIGHT POLE IN PLAN VIEW DOES NOT
 MATCH THE LEGEND SYMBOL.
 D. REVIEW LEGEND SYMBOL FOR PROPOSED SPOT GRADE. THE
 ???X??? USUALLY IS USED FOR EXISTING SPOT GRADES.
 E. CHECK WITH THE DEVELOPMENT SERVICES DEPARTMENT
 (PLANS REVIEW) TO SEE IF AN ADA ACCESS AISLE IS NEEDED
 ADJACENT TO THE RIDE SHARE/VALET PICKUP/DROP OFF AREA.
 A TYPE ???D??? CURB IS SHOWN NEXT TO THIS AREA.
  
 3. SHEET C-200 PAVING AND GRADING PLAN
 A. REVIEW THE LEGEND SYMBOLS/CALLOUTS FOR PROPOSED SPOT
 GRADE AND FOR PROPOSED LIGHT POLE.
 B. SYMBOL FOR SECTION A IS POINTING IN THE WRONG
 DIRECTION.
  
 4. SHEET C-201 PAVING AND DRAINAGE DETAILS
 A. IF TYPE ???A??? MOUNTABLE CURB IS TO BE CONSTRUCTED
 IN LINE WITH THE VALLEY GUTTERS FOR THE SOUTH
 DRIVEWAYS, NOTE THE DIFFERENT WIDTHS OF THE GUTTERS ???
 16??? VS 24???.
  
 5. SHEET C-202 PAVING AND DRAINAGE DETAILS
 A. PROVIDE THE WIDTH, TOP OF TRENCH ELEVATION AND
 BOTTOM OF TRENCH ELEVATION ON DETAIL ST-8, EXFILTRATION
 TRENCH.
  
 6. SHEET C-203 CROSS SECTIONS
 A. REMOVE THE ???F??? CURB AND GUTTER AND SHOW (OR
 SUPERIMPOSE) THE VALLEY GUTTER ON THE TWO DRIVEWAY
 CROSS SECTIONS. LABEL THE LAKEVIEW AVE AND THE
 OKEECHOBEE BLVD RIGHT OF WAYS.
 B. CROSS SECTION A-A CALLS OUT 1.07% SIDEWALK SLOPE BUT
 SHEET C-200 SHOWS SIDEWALK CROSS SLOPE 1.73% AND 1.75%.
 C. CROSS SECTION B-B CALLS OUT 0.84% SIDEWALK SLOPE BUT
 SHEET C-200 SHOWS SIDEWALK CROSS SLOPES OF 1.80%, 1.73%
 AND 1.30%.
  
 7. SHEET C-205 DRAINAGE PLAN
 A. PROVIDE WEIR, INVERT AND RIM/GRATE ELEVATIONS FOR
 THE DRAINAGE STRUCTURES.
 B. CONFIRM STRUCTURE DS-07 DOES NOT FALL WITHIN THE
 PROPOSED TYPE ???A??? MOUNTABLE CURB.
 C. PROVIDE CALCULATIONS DEMONSTRATING THE 18??? OUTFALL
 PIPE IS NEEDED INSTEAD OF 15??? TO STRUCTURE DS-07. THE
 EXISTING PIPE SOUTH OF STRUCTURE DS-07 IS SHOWN TO BE
 15???.
 D. UPDATE REFERENCES IN THE DRAINAGE NOTES FROM FDOT
 STANDARD INDEX NUMBERS (XXX) TO FDOT STANDARD PLAN
 NUMBERS (YYY-ZZZ).
 E. IS THERE GROUND FLOOR ACCESS FOR THE PAVER AREA TO
 THE EAST OF STAIR ST3? WOULD IT MAKE SENSE TO ADD A
 YARD DRAIN IN THE AREA AND PIPE IT TO STRUCTURE DS-03?
  
 8. STANDARD DETAIL P-8 FIRE HYDRANT CONNECTION APPEARS
 ON BOTH SHEETS C-302 AND SHEET C-304.
  
 9. PROVIDE SURFACE WATER MANAGEMENT CALCULATIONS.
  
  
 COMMENTS FROM RICKY ELIZONDO, PUB. UTILITIES PLANS
 EXAMINER, [email protected] , 561-494-1101:
  
 -SHOW ALL EXISTING AND PROPOSED DRY UTILITIES
 -SCALE PLANS SO THAT THEY CAN BE PRINTED ON 11X17
 -FIRE LINE FOR HOTEL NOT EVIDENT
 -SHOW ALL EXISTING VALVES
 -REMOVE ABANDONED CIP IN AREAS WHERE TAPS ARE PROPOSED
 -CALL OUT DOGHOUSE MANHOLE TO BE PROPOSED ON
 OKEECHOBEE, AS WELL AS IT PROPOSED INVERT ELEVATIONS
 -FIRE HYDRANT CONNECTIONS REQUIRE AN ANCHOR TEE PER
 DETAIL P-8
 -LABEL SEWER ???PRIVATE??? AS NECESSARY
 -MANHOLE TO MANHOLE REPLACEMENT OF SEWER LINE ON
 OKEECHOBEE MAY BE REQUIRED, FURTHER EVALUATION NEEDED
 (EXISTING MAIN IS VCP INSTALLED IN 1925)
 -PROVIDE PROFILES FOR PROPOSED SANITARY LATERAL AND
 PROPOSED WATER TAPS FROM THE MAIN TO POS AT R/W
 -VALVING CONFIGURATION FOR BOTH NORTHEAST AND NORTHWEST
 METER BANKS NEED FURTHER CONSIDERATION TO ENSURE BOTH
 BUILDINGS DO NOT LOSE WATER WHEN VALVES ARE BEING SHUT
 TO ISOLATE LINES NEEDING REPAIR
  
 FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR
 CONCERNS, THANKS.
 RICK ROSSANO, PROJECT COORDINATOR, ENGINEERING SERVICES
 DEPARTMENT (561) 494-1098 [email protected]
  
  

Review Stop ENG-D ENGINEERING DEFICIENCY REVIEW
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-E ENGINEERING ENVR. MIT. REVIEW
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-F ENGINEERING FINAL DRAWING REV
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-M ENGINEERING MODIFICATION REV
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-P ENGINEERING PLANNING REVIEW
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-T ENGINEERING TRAFFIC STUDY REV
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***