Plan Review Details - Project E22100001
Plan Review Stops For Project E22100001
Review Stop ENG-A ENGINEERING FORMAL REVIEW
Rev No 1 Status F Date 12-28-2022 Cont ID  
Sent By RROSSANO Date 12-28-2022 Time   Rev Time  
Received By rrossano Date 12-28-2022 Time   Sent To  
Notes
2022-12-28 19:12:08E22100001 - HOTEL BIBA, 320 BELVEDERE RD FIRST REVIEW
 9.30.22
  
 COMMENTS FROM RICK ROSSANO, PROJECT COORDINATOR,
 ENGINEERING SERVICES DEPT., 561-494-1098
 [email protected] :
 1. CONFIRM THAT A COMPLETED LOS ANALYSIS SUMMARY TABLE
 HAS BEEN SUBMITTED DIRECTLY TO ENGINEERING (SHEET 33 OF
 CITY OF WPB DEVELOPMENT APPLICATION).
 2. PROVIDE CALCULATIONS ON PLANS OF EXISTING AND
 PROPOSED DEMANDS FOR WATER & SEWER (AVERAGE, MAXIMUM
 AND PEAK) AND FIRE FLOW DEMANDS. CALCULATIONS SHALL BE
 PER FAC 64E-8 FOR WATER AND PER FAC 64-E.008 FOR SEWER.
 3. PLEASE PROVIDE CALCULATIONS OF REVISED PERVIOUS AND
 IMPERVIOUS CALCULATIONS FOR THE PROPOSED IMPACTED
 AREAS.
 4. COORDINATE WITH MARK HURLEY, FIELD CUSTOMER SERVICE
 SUPERVISOR WITH CITY OF WPB PUBLIC UTILITIES, REGARDING
 PLACEMENT OF BACKFLOW DEVICES AND WATER METERS. CONTACT
 HIM AT 561-494-2262 OR [email protected]
 5. PLANS SHALL SHOW EXISTING AND PROPOSED LOCATIONS AND
 DIMENSIONS OF ALL WATER, STORMWATER, AND SANITARY AND
 SEWER LINES AND CLEANOUTS, GREASE TRAPS, ETC. INCLUDING
 STUBS TO EACH PROPERTY LINE FOR WATER AND SANITARY
 SEWERS, THE MAKE AND MODEL OF ALL VALVES, POTABLE AND
 IRRIGATION METERS, BACKFLOWS, FIRE HYDRANTS AND FDCS,
 AND OTHER DEVICES TO BE INSTALLED ON THE SYSTEM, CATCH
 BASINS, CULVERTS, DITCHES INCLUDING GRADES, PIPES
 SIZES, MATERIALS, ELEVATIONS, ASSUMPTIONS,
 CALCULATIONS, INVERT ELEVATIONS FOR ALL INLETS AND
 MANHOLES AND PROFILES OF SANITARY SEWER LINES. GATE
 VALVE BOXES SHALL NOT BE INSTALLED IN CURB OR SIDEWALK.
 ALL AVAILABLE ELEVATION SHALL BE SHOWN ON THE PROFILE
 VIEW. DIRECTION OF FLOW SHALL BE SHOWN ON PLAN VIEW ON
 PLAN VIEW FOR ALL SANITARY AND STORM SEWERS. PLEASE
 SHOW SLOPE % ON ALL SANITARY LINES AND CALL OUT
 MATERIAL. ADDITIONALLY, PLAN VIEW SHALL SHOW ALL
 EXISTING AND PROPOSED UNDERGROUND UTILITY LAYOUT,
 INCLUDING FIBER OPTIC, ELECTRIC, GAS, AND CABLEVISION &
 TELECOMMUNICATION FACILITIES INCLUDING PIPES SIZES AND
 MATERIALS, LOCATED ON THE RIGHT-OF-WAY.
 6. LABEL LENGTH OF PROPOSED WATER SERVICE IN BELVEDERE
 RD. ROW.
 7. PLEASE CUT AND CAP UTILITIES NOT IN USE AND REMOVE
 ANY ABANDONED UTILITY LINES LARGER THAN 2 INCHES FROM
 CITY RIGHT OF WAY.
 8. PLEASE SHOW EXISTING AND PROPOSED UTILITY EASEMENTS,
 INCLUDING THOSE PROPOSED TO ALLOW ACCESS FOR CITY
 PERSONNEL TO PROPOSED UTILITY WATER METERS.
 9. PLEASE PROVIDE ENLARGED VIEW ON PLANS OF PROPOSED
 LOCATION OF WATER METER AND BACKFLOW PREVENTION, AND
 EXISTING METER AND BACKFLOW (ANY TO BE REMOVED?).
 BACKFLOWS SHALL BE INSTALLED ON PRIVATE PROPERTY
 OUTSIDE OF EASEMENTS AND RIGHTS OF WAY. DOMESTIC WATER
 METERS SHALL BE INSTALLED IMMEDIATELY ADJACENT TO
 PROPERTY LINE. 3 INCH AND LARGER WATER METERS SHALL BE
 INSTALLED ABOVE-GROUND ONLY.
 10. PLEASE CALLOUT DOMESTIC BACKFLOW PREVENTER AS RPPA
 AND FIRE BACKFLOW PREVENTER AS DCDA AS APPLICABLE.
 SPECIFY LEAD FREE DESIGN ON ALL BACKFLOWS.
 11. ENGINEERING PLANS SHALL INCLUDE PIGGING, FLUSHING
 AND SAMPLE POINTS ON ANY WATER RUNS 60 FT. IN LENGTH OR
 GREATER.
 12. FOR FORMAL ENGINEERING SUBMITTAL, SFWMD ERP AND
 NPDES NOI REQUIREMENTS WILL BE ENFORCED.
 - AN NOI IS REQUIRED FOR PROJECTS THAT:
 - 1) DISTURB ONE OF MORE ACRES OF LAND OR DISTURB LESS
 THAN ON ACRE OF LAND BUT ARE PART OF A COMMON PLAN OF
 DEVELOPMENT OR SALE;
 - 2) DISCHARGE STORMWATER TO SURFACE WATERS OF THE
 STATE OR TO SURFACE WATERS OF THE STATE THROUGH A
 MUNICIPAL SEPARATE STORM SEWER SYSTEM (MS4).
 - THE SFWMD ERP CAN BE OBTAINED THROUGH A 10-2 SELF
 CERTIFICATION THROUGH FDEP OR AN ERP APPLICATION
 THROUGH SFWMD. EITHER WAY, THE DEVELOPER/ENGINEER SHALL
 SUBMIT A COPY OF THE ERP PERMIT OR FDEP ACKNOWLEDGEMENT
 OF THE 10-2 CERTIFICATION.
 13. PROVIDE PROFILE AND CLEARANCES BETWEEN WATER, SEWER
 AND STORM LINES AT ALL UTILITY CROSSINGS WITHIN ROW PER
 CITY OF WEST PALM BEACH STANDARD DETAIL GN-2 SERIES.
 PLEASE SHOW ALL EXISTING AND PROPOSED UNDERGROUND
 UTILITY LAYOUT, INCLUDING FIBER OPTIC, ELECTRIC, GAS,
 AND CABLEVISION & TELECOMMUNICATION FACILITIES WITH
 PIPE MATERIAL AND SIZE, LOCATED ON THE RIGHT-OF-WAY.
 14. WHEN SUBMITTING APPROVED MATERIALS LIST, PLEASE
 PROVIDE MATERIAL/CUT SHEETS FOR ALL PROPOSED BACKFLOW
 DEVICES SHOWING SPECIFIC MODEL NUMBER AND SPECIFYING
 USC APPROVED LEAD-FREE DESIGN.
 15. PLEASE CLEARLY LABEL RIGHT OF WAY OF BELVEDERE RD.
 16. PLEASE PROVIDE LEGEND ON ALL PLAN SHEETS TO INCLUDE
 STREETLIGHT, SIGN POSTS, TRANSFORMER BOXES ETC.
 17. PLEASE RESPOND TO ALL COMMENTS IN WRITING AND
 INCLUDE PROJECT NAME, ADDRESS AND PERMIT NUMBER
 (E-XXXXXXXX).
  
 COMMENTS FROM MARK HURLEY, FIELD CUSTOMER SERVICE
 SUPER., WPB PUBLIC UTILITIES, 561-822-2262 OR
 [email protected]:
  
 -ADD WATER AND SEWER DEMAND CALCULATIONS TO C3.00
  
 -CALLOUT PROPOSED METER SIZE.
  
 -WHICH BUILDINGS AND USES (IRRIGATION, DOMESTIC,
 ETC???) WILL PROPOSED 2 INCH WATER SERVICE FEED?
  
 -ADD SIZE OF BACKFLOW ASSEMBLY TO LABEL.
  
 -CALLOUT WATER SERVICE PIPE MATERIAL TYPE.
  
 -ADD VISUAL SCALE MEASUREMENT ICON.
  
 -SOME CALLOUTS ARE GOING OFF SHEET AND UNREADABLE.
  
 -CLEARLY SHOW AND LABEL ENTIRE PROPERTY LINE.
  
 -ADD COPY OF SURVEY IN RESUBMITTAL PACKAGE.
  
 -CLEARLY LABEL ALL SEWER LATERALS WITH PIPE SIZE AND
 MATERIAL TYPE.
  
 -CLEARLY LABEL ALL EXISTING WATER SERVICES WITH PIPE
 SIZE AND MATERIAL TYPE.
  
 -PROVIDE PROFILE OF PROPOSED WATER SERVICE FROM TAP TO
 POINT OF SERVICE.
  
 -ADJUST BACKFLOW ASSEMBLY LOCATION SO IT IS ON PRIVATE
 PROPERTY AND NOT IN RIGHT OF WAY.
  
 -OTHER PLANS SHOW WALLS OR FENCES NEAR BACKFLOW
 ASSEMBLY. SHOW AND LABEL THEM ON ENGINEERING PLANS IF
 ANY WILL BE THERE.
  
 -SEE IF CAN ADJUST METER BOX LOCATION SOUTH SUCH THAT
 IT IS OUT OF PEDESTRIAN TRAFFIC ADJACENT PROPERTY LINE,
 BUT STILL ACCESSIBLE FROM RIGHT OF WAY OUTSIDE OF ANY
 WALLS OR FENCES. SMALL UTILITY EASEMENT MAY BE NEEDED
 TO FACILITATE THIS.
  
 -LABEL WHAT IS HAPPENING TO THE EXISTING METERED WATER
 SERVICES. IF ANY WILL NOT BE USED, SHOULD BE CUT BACK
 TO THE MAIN AND CAPPED.
  
 -LABEL WHAT IS HAPPENING TO THE EXISTING SEWER
 LATERALS.
  
 -ADD DATUM STATEMENT AND CONVERSION EQUATION.
  
 -ADD NOTE FOR CONTRACTOR TO REPLACE STRIPING.
  
 -SHOW AND LABEL ANY EXISTING UTILITY EASEMENTS ON THE
 PROPERTY.
  
 -VERIFY BUILDINGS WILL NOT HAVE FIRE SPRINKLERS.
  
 -PLAN P1.00 SHOWS SEWER LATERAL IN RIGHT OF WAY AND
 ALSO A GREASE INTERCEPTOR. P1.00 WAS PROBLEMATIC AS
 SHOWING SEWER LATERAL RUNNING ALONG SIDEWALK. PLEASE
 COMPARE BOTH PLANS, SHOW GREASE INTERCEPTOR ON
 ENGINEERING PLAN IF THERE WILL BE ONE, AND ENSURE
 PLUMBING WILL WORK WITH PROPOSED ENGINEERING DESIGN.
  
 -CLEARLY SHOW AND LABEL ALL EXISTING AND PROPOSED SEWER
 LATERAL CLEANOUTS WITH RIM AND INVERT ELEVATIONS.
  
 -VERIFY IF HEALTH PERMIT IS REQUIRED.
  
 -IF SAMPLE POINT IS NEEDED OR REQUIRED, SHOW AND LABEL
 ON PLAN.
  
 COMMENTS FROM TRACY WARD, SR. STORMWATER ENG.,
 ENGINEERING SERVICES, [email protected] 561-494-1120:
 1. ON SHEET T.100, CONFLICTING INFORMATION ON NUMBER OF
 ROOMS BEING TRANSFORMED. GUEST ROOMS SECTION INDICATES
 REDUCTION OF 22 GUEST ROOMS TO 14 GUEST ROOMS IN
 BUILDING B. PROJECT DESCRIPTION SECTION INDICATES 20
 ROOMS TO BE REDUCED TO 15 GUEST ROOMS IN BUILDING B.
 2. RESTORE STRIPING IN MILL AND RESURFACING LIMITS.
 3. SHOW BELVEDERE ROAD MEDIAN AND ADJUST MILL AND
 RESURFACING HATCHING. DAMAGED LANDSCAPING AND
 IRRIGATION TO BE REPLACED IN KIND OR BETTER.
 4. PROVIDE VERTICAL CLEARANCES BETWEEN PROPOSED WATER
 SERVICE AND EXISTING SANITARY SEWER, EXISTING FORCE
 MAIN AND EXISTING STORM PIPE.
 5. CALLOUT SIDEWALK AND CURB REPLACEMENT FOR THE WATER
 SERVICE INSTALLATION.
 6. MILL AND RESURFACING LIMITS SHOULD BE COORDINATED
 WITH THE CITY???S CONSTRUCTION COORDINATOR.
 7. ALL DRAINAGE STRUCTURES THAT POTENTIALLY RECEIVE
 SURFACE RUNOFF FROM THE CONSTRUCTION AREA SHALL BE
 PROTECTED FROM RECEIVING CONSTRUCTION SEDIMENT INTO THE
 STRUCTURE.
  
 COMMENTS FROM MIKE TECHNOW, PUB. UTILITIES ENGINEER,
 [email protected], 561-494-1047:
  
 -PROVIDE A PROFILE OR CALL OUT VERTICAL CLEARANCE
 BETWEEN EXISTING UTILITIES AND PROPOSED WATER SERVICE.
 -PROVIDE LEVEL OF SERVICE CALCULATIONS ON PLAN SHEET
 PER SUBMITTAL GUIDELINES.
  
  

Review Stop ENG-D ENGINEERING DEFICIENCY REVIEW
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-E ENGINEERING ENVR. MIT. REVIEW
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-F ENGINEERING FINAL DRAWING REV
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-M ENGINEERING MODIFICATION REV
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-P ENGINEERING PLANNING REVIEW
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-T ENGINEERING TRAFFIC STUDY REV
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***