Plan Review Details - Project E21050006
Plan Review Stops For Project E21050006
Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 05-26-2021 Cont ID  
Sent By rrossano Date 05-26-2021 Time   Rev Time 0.00
Received By rrossano Date 05-26-2021 Time   Sent To  
Notes
***NONE***

Review Stop ENG-A ENGINEERING FORMAL REVIEW
Rev No 1 Status F Date 05-10-2021 Cont ID  
Sent By rrossano Date 05-10-2021 Time   Rev Time  
Received By rrossano Date 05-10-2021 Time   Sent To  
Notes
2021-05-10 09:19:17COMMENTS PER MARK HURLEY, CITY OF WPB PUB. UTIL. FIELD
 CUSTOMER SVC. SUPV., [email protected]. 561-822-2262:
  
 -PLEASE LABEL THE NORTH-SOUTH DIMENSION OF THE UTILITY
 EASEMENT ON THE ENLARGED DETAIL.
  
 -PLEASE RELOCATE REDUCER AFTER METER TAP INSTEAD OF
 BEFORE IT.
  
 -VERIFY THERE WILL BE NO CHEMICALS BEING ADDED TO
 CUSTOMER?S FIRELINE PIPING SYSTEM.
  
 -THE AREA AROUND 6 INCH TAP LOOKS LIKE IT WAS
 HISTORICALLY ASPHALT. IS IT PROPOSED TO REMAIN ASPHALT,
 OR CHANGING TO GRASS?
  
 -THE FDC LOCATION APPEARS TO CONFLICT WITH FIRE HYDRANT
 CLEARANCE SHOWN ON STANDARD DETAIL P-8.
  
 -PLEASE ADD FIRELINE POINT OF SERVICE WORDING TO LABEL
 FOR 4 INCH GATE VALVE NUMBER 3.
  
 -PIPING BETWEEN 1 INCH METER AND BACKFLOW ASSEMBLY
 CANNOT BE PE MATERIAL TYPE. PLEASE ADD REFERENCE TO
 WS-6 ON RPPA LABEL SO WRONG PIPE NOT USED.
  
 -ON ENLARGED WATER SERVICE DETAIL, PLEASE LABEL THE
 LARGER PIPE SEGMENTS WITH PIPE SIZE AND MATERIAL TYPE.
  
 -IS LABEL FOR 4 INCH GATE VALVE NUMBER 3 FINE, OR
 SHOULD IT BE 4 INCH GATE VALVE NUMBER 1?
  
 -DID NOT SEE SEWAGE UTILITY FOR NEW BUILDING. WHERE
 DOES SEWAGE GO? IF NOT SHOWN PLEASE ADD TO PLAN. IF
 ADDITION WILL USE EXISTING SEWER INFRASTRUCTURE ON
 SITE, THEN PLEASE NOTE THAT ON WASTEWATER PLAN. VERIFY
 IT IS SUFFICIENT AND LABEL SEWER LATERAL WITH PIPE SIZE
 AND MATERIAL TYPE. ALSO LABEL ANY CLEANOUTS.
  
 -NOTE 12 ON WATER PLAN TALKS ABOUT ELECTRICITY TO A
 LIFT STATION. WHERE IS LIFT STATION LOCATED?
  
 -DOES THE NEW 1 INCH METER PROVIDE WATER FOR THE
 BUILDING ADDITION OR IRRIGATION?
  
  
 COMMENTS FROM TRACY WARD:
  
 1. ALTHOUGH THE PERVIOUS AREA IS INCREASING AND THERE
 IS LESS STORMWATER RUNOFF FOR THE VARIOUS STORM EVENTS,
 THERE IS ALSO LESS SITE STORAGE AVAILABLE BECAUSE OF
 THE NEW BUILDING. THE 25-YEAR 3-DAY ZERO DISCHARGE PEAK
 STAGE INCREASES FROM 13.78? NAVD DURING EXISTING
 CONDITIONS TO 14.09? NAVD FOR PROPOSED CONDITIONS. THE
 100-YEAR 3-DAY ZERO DISCHARGE PEAK STAGE INCREASES FROM
 14.51? NAVD FOR EXISTING CONDITIONS TO 15.08? NAVD FOR
 PROPOSED CONDITIONS.
 2. THE SITE IS IN THE C-51 DRAINAGE BASIN. PROVIDE
 CALCULATIONS FOR THE C-51 BASIN RULE FOR COMPENSATORY
 STORAGE.
 3. FOR WATER QUALITY CALCULATIONS, WHY WAS ONLY THE
 ?AFFECTED AREA? OF 1.04 ACRES USED FOR THE 2.5? TIMES
 PERCENT IMPERVIOUSNESS USED INSTEAD OF THE TOTAL BASIN
 AREA OF 2.32 ACRES?
  
 TRACY L. WARD, P.E., CITY OF WPB SENIOR STORMWATER
 ENGINEER, ENGINEERING SERVICES DEPARTMENT
 561-494-1120 [email protected]
  
 FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR
 CONCERNS, THANKS.
 RICK ROSSANO, PROJECT COORDINATOR, ENGINEERING SERVICES
 DEPARTMENT
 DIRECT: (561) 494-1098 [email protected]
  

Review Stop ENG-D ENGINEERING DEFICIENCY REVIEW
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-E ENGINEERING ENVR. MIT. REVIEW
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-F ENGINEERING FINAL DRAWING REV
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-M ENGINEERING MODIFICATION REV
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-P ENGINEERING PLANNING REVIEW
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-T ENGINEERING TRAFFIC STUDY REV
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved