Plan Review Details - Project E17010029
Plan Review Stops For Project E17010029
Review Stop ENG-A ENGINEERING FORMAL REVIEW
Rev No 2 Status P Date 08-04-2017 Cont ID  
Sent By squinone Date 08-04-2017 Time   Rev Time 2.00
Received By squinone Date 08-04-2017 Time   Sent To  
Notes
2017-08-04 16:54:00APPROVED WITH CONDITIONS:
  
 - CITY WILL INSPECT PROPOSED 10-FT CROSSWALK AND STOP
 BAR ALONG PARK PL SHALL BE DESIGNED AND INSTALLED PER
 FDOT STANDARDS. PAVEMENT MARKING WILL BE IN
 THERMOPLASTIC.
  
 - CITY WILL INSPECT PROPOSED CR-C CURB RAMP ON SOUTH
 CORNER OF PARK PL.
  
 - ISOLATION VALVE WILL BE REQUIRED BETWEEN THE CITY
 WATERMAIN AND PRIVATE FIRELINE.
  
 - UNDERGROUND CONTRACTOR NEITHER THE CITY CONSTRUCTION
 COORDINATOR DID NOT ATTEND THE MEETING ON 08/04/2017 TO
 EVELUATE PENDING ENGINEERING PERMIT COMMENTS.
  
 - APPROVED MATERIAL LIST MUST BE SUBMITTED TO THE CITY.
  
 - BACKFLOW PREVENTION AND FITTING CUT-SHEET MUST BE
 PROVIDED TO THE CITY. ITEMS SHALL BE LEAD-FREE.
  
 SINCERELY,
 SOFIA QUINONES-BENEJAM, EI
 PROJECT ENGINEER
 CITY OF WEST PALM BEACH
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 P: 561.494.1040 EXT: 1108
 C: 561.459.6518
 F: 561.494.1116
 EMAIL: [email protected]

Review Stop ENG-A ENGINEERING FORMAL REVIEW
Rev No 1 Status F Date 01-26-2017 Cont ID  
Sent By mkhan Date 12-30-2016 Time 14:47 Rev Time 2.00
Received By mkhan Date 12-19-2016 Time 14:46 Sent To  
Notes
2017-01-26 14:57:16PROJECT NAME: CITY OF WEST PALM BEACH FIRE STATION #4 -
 1718 PARKER AVENUE (RELATED PERMIT #16051078)
  
 DATE: DECEMBER 30, 2016
  
 AFTER A REVIEWING THE PLANS DATED 9/1/2016 FOLLOWING
 ARE OUR COMMENTS:
  
 1. REVISE THE ?AUTO-CALC CERTIFIED COST ESTIMATE? TO
 SHOW IN THE SPREADSHEET THE ITEMS SEPARATED FOR ONSITE
 AND FOR WITHIN THE CITY?S RIGHT-OF-WAY. THIS WILL
 DERIVE THE ACCURATE ?SITE DEVELOPMENT REVIEW FEES? AND
 ?CONSTRUCTION ADMIN. FEES?;
 2. PROPOSED DUMPSTER SHOWN TO BE ON AN EXISTING WATER
 MAIN. PLEASE MOVE IT OUT OF THE WAY SO THAT FOUNDATION
 WORK FOR THE DUMPSTER PAD AND ENCLOSURE WALLS DOES NOT
 DAMAGE IT DURING CONSTRUCTION;
 3. SHOW GATE VALVE AT THE PROPERTY LINE BEFORE THE
 WATER MATER FOR THE 6? WATER LINE. ALSO SHOW AN
 ?ISOLATION VALVE? BEFORE THE ?DOUBLE DETECTOR CHECK
 VALVE/ASSEMBLY?;
 4. REVISE CLEANOUT LOCATIONS FOR THE SANITARY SERVICES;
 5. INCLUDE LATEST VERSION OF THE CITY?S STANDARD
 DETAILS IN THE PLANS;
  
 MOSTAQUE KHAN, P.E.
 LAND DEVELOPMENT ENGINEER
 [email protected]
 561-494-1124 (OFFICE)
  

Review Stop ENG-D ENGINEERING DEFICIENCY REVIEW
Rev No 1 Status F Date 01-26-2017 Cont ID  
Sent By mkhan Date 01-26-2017 Time 14:55 Rev Time 2.00
Received By mkhan Date 01-24-2017 Time 14:53 Sent To  
Notes
2017-01-26 15:56:45CITY OF WEST PALM BEACH
  
 ENGINEERING SERVICES DEPARTMENT
  
 PROJECT NAME: CITY OF WEST PALM BEACH FIRE STATION #4 ?
 1718 PARKER AVENUE - PERMIT #16051078
  
 DATE: JANUARY 24TH AND 26TH, 2017
  
 AFTER A REVIEWING THE REVISED PLANS DATED 1/24/2017
 FOLLOWING ARE GENERAL AND UTILITY RELATED COMMENTS:
  
 1. REVISED THE ?AUTO-CALC CERTIFIED COST ESTIMATE? HAS
 NOT BEEN RECEIVED WITH THE REVISED PLANS;
 5. INCLUDE IN ALL DETAIL SHEETS CITY?S LATEST VERSION
 OF THE STANDARD DETAILS (2016) IN THE PLANS. CAD FILES
 FOR ALL CITY DETAILS HAVE BEEN EMAILED ON 1/24/2017;
  
 FOLLOWING COMMENTS ARE FROM COTY?S STORMWATER ENGINEER
 AND RELATED TO DRAINAGE:
  
 1. MINIMUM GRATE ELEVATION (PARKING LOT) FOR
 EXFILTRATION TRENCH SHOULD BE 12.0;
 2. H2 IN THE EXFILTRATION TRENCH CALCULATION SHOULD BE
 12.0? MINUS THE TRENCH BOTTOM ELEVATION. REVISE THE
 CALCULATIONS;
 3. EXPLAIN HOW THE RUNOFF IS CONTROLLED FOR
 25-YEAR/3-DAY STORM. CALCULATIONS SHOW PEAK STAGE 15.17
 NGVD (PAGE 11). PERIMETER GRADE IS 13.24 OFF PARKER
 AVE.;
 4. THIS IS A CRITICAL FACILITY (FIRE STATION), HENCE
 PROVIDE THE 500-YEAR FLOOD STAGE ELEVATION;
 5. INSTEAD OF REDUCING RAINFALL BY THE EQUIVALENT
 TREATMENT STORAGE DEPTH, KEEP RAINFALL AT 12.8 INCH AND
 15 INCH. AND ADD THE TREATMENT STORAGE TO THE
 STAGE-STORAGE TABLE;
 6. DOES THE PROPOSED GRADING MEET THE C-51 BASIN
 COMPENSATORY STORAGE?
 7. DOUBLE STRIPING ON STREET PARALLEL PARKING DOES NOT
 MEET CITY STANDARD;
  
 MOSTAQUE KHAN, P.E.
 LAND DEVELOPMENT ENGINEER
 [email protected]
 561-494-1124 (OFFICE)
  

Review Stop ENG-E ENGINEERING ENVR. MIT. REVIEW
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-F ENGINEERING FINAL DRAWING REV
Rev No 1 Status P Date 11-08-2018 Cont ID  
Sent By Mgonzale Date 11-08-2018 Time   Rev Time 1.00
Received By mgonzale Date 11-08-2018 Time   Sent To I
Notes
2018-11-08 14:14:32PASSED - FINAL AS-BUILTS AND CERTIFICATION RECEIVED FOR
 FIRE STATION #4 11/7/2018
  

Review Stop ENG-M ENGINEERING MODIFICATION REV
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-P ENGINEERING PLANNING REVIEW
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-T ENGINEERING TRAFFIC STUDY REV
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***