Plan Review Stops For Project E16090014
Review Stop ENG-A ENGINEERING FORMAL REVIEW
Rev No 1 Status F Date 11-04-2016 Cont ID  
Sent By mkhan Date 09-23-2016 Time 15:48 Rev Time 6.00
Received By mkhan Date 09-19-2016 Time 10:00 Sent To  
Notes
2016-09-19 15:14:28PLANS DATED 8/12/2016 IN REVIEW. DEVELOPMENT REVIEW FEE
 RECEIVED FOR THE AMOUNT OF $1000 (INVOICE #16-1408;
 DEPOSITED ON 9/20/2016).
  
 COMMENT NO. 1: PLEASE COMPLETE AND SUBMIT 'DEVELOPMENT
 APPLICATION'.
  
 FOLLOWING ARE THE OTHER COMMENTS FOR THE PROJECT.
 PLEASE RESPOND TO THE COMMENTS IN WRITING:
  
 #1: REMOVE EXISTING DRIVE APPROACH AND REPLACE WITH
 CONCRETE DRIVE APRON (DETAIL GC-7) FOR THE ENTRANCE ON
 THE NORTHWEST CORNER OF THE PARKING LOT
  
 #2: WE RECEIVED THE REVISED COST ESTIMATE THAT SHOWS
 THE ITEMS TO BE INCLUDED IN THE BLDG DEPT ESTIMATE
 (WITH AN 'Y'). BUT IT DID NOT CHANGE THE 'DEV. REVIEW
 FEE'.
  
 IF THE SPREADSHEET IS NOT UPDATING THE NUMBERS YOU CAN
 REMOVE THE DOLLAR FIGURES (ALL COST AMOUNTS FROM THE
 ROADWAY CONSTRUCTION COST SECTION I.E. MAKE THE
  
 TOTAL COST FOR THIS SECTION TO 'ZERO'.
  
 #3: WATER METERS NOT USED SHALL BE CUT AND CAPPED TO
 THE MAIN.
  
 #4: SHOW IRRIGATION AND BACKFLOW PREVENTER ON PAVING
 AND DRAINAGE PLAN IN LIGHT LINE TYPE. SUBMIT
 SPECIFICATION SHEETS FOR 1" WATTS MODEL 919 AS
 SPECIFIED IN YOUR IRRIGATION PLAN/DETAILS. BACKFLOW
 PREVENTER
  
 SHALL BE LEAD FREE TYPE AND USC APPROVED.
  
 #5: NOTE ON PLAN "CUT AND PLUG ANY EXISTING SANITARY
 SEWER SERVICES. ANY SEWER LEFT IN PLACE SHALL HAVE A
 CLEAN-OUT AT PROPERTY LINE"
  
 #6: ADD A NOTE ON THE PAVING AND DRAINAGE PLAN:
 "MINIMIZE RUNOFF INTO ALLEY"
  
 #7: ALL BROKEN SIDEWALK SHALL BE REPLACED WITH NEW.
  
 #8: ALL SLOPES IN THE ROW / SIDEWALKS / DRIVEWAY APRONS
 SHALL CONFORM TO LATEST ADA.
  
 #9: PROVIDE TRUNCATED DOME (2' MIN WIDTH X 5' WIDE,
 YELLOW) AT THREE PEDESTRIAN ENTRANCES ALONG GARDENIA
 ST.
  
 #10: PLEASE VERIFY THE COLLECTOR STREET SIGNAGE FOR
 PROPER TURNING MOVEMENT
  
 #11: TRACY IS STILL DOING HIS REVIEW.
  

Review Stop ENG-D ENGINEERING DEFICIENCY REVIEW
Rev No 1 Status F Date 11-04-2016 Cont ID  
Sent By mkhan Date 10-17-2016 Time 15:42 Rev Time 2.00
Received By mkhan Date 10-13-2016 Time 15:41 Sent To  
Notes
2016-11-04 15:47:29RECEIVED REVISED PLANS ON OCTOBER 13. ALTHOUGH UTILITY
 COMMENTS ARE ADDRESSED, CITY'S SENIOR STORMWATER
 ENGINEER, TRACY WARD'S COMMENTS ARE NOT FULLY
 ADDRESSED. FOLLOWING ARE HIS COMMENTS ON DRAINAGE:
  
 1. ADD A WEIR INSIDE THE DRAINAGE STRUCTURE NO. A-1.
 PLEASE NOTE THAT IN THE PLAN AND SHOW A DETAIL FOR
 THAT. ATTACHED PLEASE FIND A 'WEIR DETAIL' (CITY'S
 STANDARD DETAIL ST-6) THAT YOU CAN USE AS GUIDELINE.
 ST-6.PDF ST-6_082616.DWG
  
 2. ADD BAFFLES INSIDE BOTH DRAINAGE STRUCTURES A-1 AND
 A-2. PLEASE NOTE IT IN THE PLAN AND INCLUDE A DETAIL.
 ATTACHED PLEASE FIND A 'POLLUTION RETARDANT BAFFLE
 DETAIL' (CITY'S STANDARD DETAIL ST-7) THAT YOU CAN USE
 AS GUIDELINE. ST-7.PDF ST-7_082616.DWG
  
 3. SHOW ON THE PLANS (TENTATIVELY NEAR THE STOP BAR)
 THAT A HIGH POINT (GRADE BREAK) WILL BE CREATED IN
 BETWEEN THE DRAINAGE STRUCTURES (FOR BOTH A-1 AND A-2)
 AND THE DRIVEWAY/EXITS TO THE SOUTH FROM THE PARKING
 LOT. ATTACHED IS A MARKUP FOR YOUR INFORMATION.
  
 4. REVISE THE DRAINAGE CALCULATION WITH NEW CONTROL
 ELEVATION.
  
 PLEASE REVISE THE PLANS AND THE 'DRAINAGE REPORT/WATER
 MANAGEMENT CALCULATIONS' AND SUBMIT TO OUR OFFICE. ONCE
 APPROVED, I WILL EMAIL YOU REQUESTING SIX (6) SETS OF
 COMPLETE SET OF PLANS AND A CHECK FOR THE ADDITION FEES
 (FOR $1379.96).
  

Review Stop ENG-E ENGINEERING ENVR. MIT. REVIEW
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-F ENGINEERING FINAL DRAWING REV
Rev No 1 Status P Date 11-04-2016 Cont ID  
Sent By mkhan Date 11-03-2016 Time 1:30 Rev Time 2.00
Received By mkhan Date 11-02-2016 Time 15:48 Sent To  
Notes
2016-11-04 15:50:47PLANS ARE ACCEPTED (SATISFACTORILY ADDRESSED THE
 REMAINING OUTSTANDING DRAINAGE COMMENTS) ON 11/03/2016
 . AN APPROVAL LETTER CONFIRMING THAT HAS BEEN EMAILED
 TO THE ENGINEER. ENGINEER WAS ASKED TO NOTIFY OUR
 OFFICE TWO WEEKS PRIOR TO THE ANTICIPATED CONSTRUCTION
 DATE SO THAT WE CAN ASSIGN AN INSPECTOR FOR THE
 PROJECT. PLEASE SEND ME A LIST OF PERSONS THAT YOU LIKE
 TO ATTEND IN THE PRE-CONSTRUCTION MEETING TO BE HELD AT
 THE CITY OF WEST PALM BEACH CITY HALL.
  
  
 REMAINDER OF THE DEVELOPMENT REVIEW FEES AND
 CONSTRUCTION ADMIN FEES RECEIVED FOR THE AMOUNT OF
 $1379.96 (INVOICE #16-1426; DEPOSITED ON 11/03/2016).

Review Stop ENG-M ENGINEERING MODIFICATION REV
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-P ENGINEERING PLANNING REVIEW
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-T ENGINEERING TRAFFIC STUDY REV
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

  Print