| 2016-10-20 15:54:43 | PLANS APPROVED CONDITIONALLY. |
| | |
| | THE CONSTRUCTION PLANS DATED OCTOBER 3, 2016 AND |
| | RECEIVED BY OUR DEPARTMENT, HAVE BEEN APPROVED FOR |
| | CONSTRUCTION AT 1615 CLARE AVENUE (AKA CLARE AVE) WITH |
| | CONDITIONS. THE CITY OF WEST PALM BEACH ENGINEERING |
| | DEPARTMENT APPROVAL IS VALID UNTIL OCTOBER 20, 2017. |
| | |
| | PLEASE NOTE: |
| | |
| | 1 OTHER CITY PERMITS AND APPROVALS MAY BE REQUIRED FOR |
| | THE CONSTRUCTION OF THIS PROJECT SUCH AS A BUILDING |
| | PERMIT FOR UNDERGROUND FIRELINE. PLEASE CONTRACT PETER |
| | LEDUC ([email protected] OR (561)804-4700) TO DETERMINE IF |
| | A SEPARATE PERMIT IS REQUIRED. |
| | |
| | 2. PROOF OF SITE PLAN APPROVAL MEETING ALL CONDITIONS |
| | MUST BE PRESENTED AT TIME OF PRE-CONSTRUCTION ALONG |
| | WITH SURETY FOR CONSTRUCTION AREAS IN THE ROW. IT IS |
| | SUGGESTED THAT A CONSTRUCTION COST ESTIMATED BE |
| | SUBMITTED WITH EACH SURETY OF THE SPECIFIC WORK THAT |
| | WILL BE PERFORMED. |
| | |
| | A PRE-CONSTRUCTION MEETING MUST BE SCHEDULED WITH THE |
| | CITY OF WEST PALM BEACH ENGINEERING DIVISION AT LEAST |
| | 10 DAYS PRIOR TO INTENDED CONSTRUCTION START DATE. |
| | PLEASE SUBMIT THE FOLLOWING PRIOR TO THE MEETING. |
| | |
| | 1. COPY OF VALID ERP MODIFICATION FROM SFWMD SHALL BE |
| | ON-SITE AT ALL TIMES. |
| | |
| | 2. COPY OF VALID CITY OF WEST PALM BEACH RIGHT-OF-WAY |
| | PERMIT WITH APPROVED MAINTENANCE OF TRAFFIC (MOT) PLANS |
| | FOR AFFECTED PUBLIC ROADS AND SIDEWALKS. |
| | |
| | 3. IF ANY DEWATERING, PROVIDE A COPY OF THE DEWATERING |
| | PERMIT OR EVIDENCE THAT THE PROJECT QUALIFIES FOR A NO |
| | NOTICE DEWATERING PERMIT PER SECTION 40E-20.302(3) FAC |
| | |
| | 4. AN EROSION CONTROL BOND AND LAND STABILIZATION BOND |
| | HAVE BEEN POSTED FOR EARTH MOVING ACTIVITIES ON-SITE. |
| | THIS BOND WILL BE RELEASED UPON THE FIRST VERTICAL |
| | INSPECTION. |
| | |
| | 5. PERMANENT TRAFFIC STRIPPING, SIGNAGE AND MEDIAN |
| | CONFIGURATION PLAN SHALL SATISFY PLANNING DEPARTMENT?S |
| | WRITTEN CONDITIONS, IT SHALL BE PRESENTED TO CITY |
| | TRAFFIC DEPARTMENT WITH SUPPORTING DOCUMENTATION FOR |
| | THE FINAL DESIGN. |
| | |
| | 6. SITE CONSTRUCTION TRAILERS SHALL BE TIED TO CITY |
| | SANITARY SEWER. ANY DEVIATION SHALL BE APPROVED THRU |
| | PALM BEACH COUNTY HEALTH DEPARTMENT. |
| | |
| | 7. CONSTRUCTION TRAFFIC SHALL MAKE USE OF CLARE AVENUE |
| | TO ENTER AND EXIT THE CITY. THIS WILL ASSURE FEWER |
| | DISTURBANCES TO CITY RESIDENTS. ALTERNATE ROUTES WOULD |
| | REQUEST FORMAL WRITTEN REQUEST AND APPROVAL. |
| | |
| | 8. PROJECT IS RESTRICTED TO WORK DURING REGULAR |
| | BUSINESS HOURS. DEVIATION TO USE ANY OTHER SCHEDULE OF |
| | WORK WILL REQUIRE FORMAL WRITTEN REQUEST AND APPROVAL |
| | TO THE CITY MAYOR?S OFFICE. |
| | |
| | 9. PROJECT NOTIFICATIONS SHALL BE COMMUNICATED THRU |
| | ELECTRONIC MESSAGE BOARDS WITH ENOUGH NOTICE. CASE BY |
| | CASE OR CONSTRUCTION ACTIVITY WILL BE REVIEWED TO |
| | LESSEN IMPACT TO CITY RESIDENTS AND NEARBY EVENTS. |
| | |
| | 10. 110% SURETY WILL BE REQUIRED IN A FORM OF BOND OR |
| | LETTER OF CREDIT FOR UTILITY OFF-SITE WORK. BOND SHALL |
| | BE GOOD FOR 1 YEAR. |
| | |
| | |
| | 11. THREE (3) COPIES OF 'APPROVED MATERIALS LIST' |
| | SIGNED BY CONTRACTOR AND ENGINEER OF RECORD, WITH |
| | SELECTED MATERIALS HIGHLIGHTED. |
| | HTTP://WPB.ORG/ENGINEERING/FORMS-AND-PUBLICATIONS/ |
| | |
| | 12. THREE (3) COPIES OF SHOP DRAWINGS/SPECIFICATIONS |
| | FOR ANY MATERIALS NOT INCLUDED ON CITY'S APPROVED |
| | MATERIALS LIST. COPIES SHOULD BE STAMPED AS APPROVED BY |
| | CONTRACTOR AND ENGINEER OF RECORD. |
| | |
| | MOSTAQUE KHAN |
| | |
| 2016-10-14 16:49:17 | CREATED INVOICE AND EMAILED TO GEORGE BALABAN WITH |
| | BOHLER. INVOICE TOTAL IS $3,685.13 FOR THIS TIME (THEY |
| | ALREADY MADE A PAYMENT FOR $1000 THAT WAS RECEIVED ON |
| | 6/6/2016). |