|
 |
 |
 |
 |
 |
Plan Review Details - Project E16050077
| Plan Review Stops For Project E16050077 |
| Review Stop |
ENG-A |
ENGINEERING FORMAL REVIEW |
| Rev No |
1 |
Status |
P |
Date |
05-27-2016 |
|
|
Cont ID |
|
| Sent By |
Mgonzale |
Date |
05-16-2016 |
Time |
|
Rev Time |
24.00 |
| Received By |
mgonzale |
Date |
04-15-2016 |
Time |
|
Sent To |
I |
|
| Notes |
| 2016-05-27 17:07:51 | PROVISOS: | | | | | | 1. MUNICODE 94-450 STORMWATER POLLUTION PREVENTION PLAN | | | REQUIRED AT ALL TIMES. | | | 2. ALL WORK MUST BE PERFORMED IN ACCORDANCE TO THE | | | APPROVED SITE PLAN. | | | 3. A SEPARATE PAVING PERMIT IS REQUIRED THRU CITY OF | | | WPB DEVELOPMENT SERVICES DEPT ( BUILDING DEPT.) | | | 4. ENGINEER OF RECORD SHALL INSPECT AND CERTIFY TO CITY | | | OF WPB. | | | 5. PROVIDE ALL CLOSE OUT AS-BUILTS AND CERTIFICATIONS | | | WITH FIELD CALCULATIONS TO UPDATE CITY'S STORMWATER | | | ACCOUNT. | | | 6. CLOSURE OF ALL PERMITS WILL BE REQUIRED AT TIME OF | | | PERMIT C.O. REQUEST. | | | | | | MANUEL JULIAN GONZALEZ | | | ENGINEERING PROJECT COORDINATOR | | | PUBLIC WORKS DEPARTMENT | | | 401 CLEMATIS STREET, 4TH FLOOR | | | WEST PALM BEACH, FL 33401 | | | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) | | | MAIN PHONE: (561) 822-1200 | | | DIRECT: (561) 494-1085 | | | FAX: (561) 494-1116 | | | EMAIL: [email protected] | | | WWW.WPB.ORG/ENGINEERING | | | | | | |
|
|
| Review Stop |
ENG-D |
ENGINEERING DEFICIENCY REVIEW |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ENG-E |
ENGINEERING ENVR. MIT. REVIEW |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ENG-F |
ENGINEERING FINAL DRAWING REV |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ENG-M |
ENGINEERING MODIFICATION REV |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ENG-P |
ENGINEERING PLANNING REVIEW |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ENG-T |
ENGINEERING TRAFFIC STUDY REV |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| |
Print |
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |