|
 |
 |
 |
 |
 |
Plan Review Details - Project E16040025
| Plan Review Stops For Project E16040025 |
| Review Stop |
ENG-A |
ENGINEERING FORMAL REVIEW |
| Rev No |
1 |
Status |
P |
Date |
04-25-2016 |
|
|
Cont ID |
|
| Sent By |
mGONZALE |
Date |
04-25-2016 |
Time |
|
Rev Time |
8.00 |
| Received By |
mgonzale |
Date |
03-25-2016 |
Time |
|
Sent To |
I |
|
| Notes |
| 2016-04-25 08:55:08 | PROVISOS: | | | | | | #1 CALL 811 BEFORE ANY DIGGING. WWW.SUNSHINE811.COM | | | | | | #2 MUNICODE 94-450 SWPPP SHALL BE IN PLACE AND ENFORCED | | | AT ALL TIMES. | | | | | | #3 DUMPSTER FOR CITY SANITATION PICK-UP, MINIMUM | | | OPENING DIMENSION SHALL BE 12'-6" CLEAR. | | | | | | #4 EOR SHALL INSPECT AND CERTIFY ALL SITE MODIFICATIONS | | | AS PER APPROVED PLAN. | | | | | | MANUEL JULIAN GONZALEZ | | | ENGINEERING PROJECT COORDINATOR | | | PUBLIC WORKS DEPARTMENT | | | 401 CLEMATIS STREET, 4TH FLOOR | | | WEST PALM BEACH, FL 33401 | | | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) | | | MAIN PHONE: (561) 822-1200 | | | DIRECT: (561) 494-1085 | | | FAX: (561) 494-1116 | | | EMAIL: [email protected] | | | WWW.WPB.ORG/ENGINEERING | | | | | | IMPORTANT MESSAGE: AS OF DECEMBER 20, 2015 THE CITY OF | | | WEST PALM BEACH | | | CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED, | | | MAKING KNOWN THAT "ALL BACKFLOW DEVICES MUST BE LEAD | | | FREE." | | | FOR MORE INFORMATION REFER TO THE LINK BELOW: | | | HTTP://WPB.ORG/DEPARTMENTS/PUBLIC-UTILITIES/FORMS-PUBLI | | | CATIONS/BACKFLOW-CROSS-CONNECTION-CONTROL-MANUAL | | | | | | | | | | | | |
|
|
| Review Stop |
ENG-D |
ENGINEERING DEFICIENCY REVIEW |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ENG-E |
ENGINEERING ENVR. MIT. REVIEW |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ENG-F |
ENGINEERING FINAL DRAWING REV |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ENG-M |
ENGINEERING MODIFICATION REV |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ENG-P |
ENGINEERING PLANNING REVIEW |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ENG-T |
ENGINEERING TRAFFIC STUDY REV |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| |
Print |
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |