| 2016-01-26 15:40:37 | 01/25/2016 |
| | |
| | #1 CONTRACTOR SHALL USE LATEST CITY OF WPB STANDARD |
| | DETAILS AND APPROVE MATERIAL LIST FOR CITY OWNED |
| | UTILITY ELEMENTS. |
| | |
| | #2 DEVELOPER HAS RESPONDED THAT POWER POLES ALONG |
| | ALLEYWAY WILL BE RELOCATED BY FPL. |
| | |
| | #3 EOR, MIKE JEFFERY,STORM WATER CALCULATIONS WHERE |
| | REVISED. |
| | |
| | #4 PROJECT WILL BE SERVED BY A SINGLE METER. PLAN CALLS |
| | 2" DIAMETER METER / DEVELOPER WILL MAKE PROVISIONS FOR |
| | SUB-METERING. |
| | BADGER MODEL 170 (2" DISC METER)= AVERAGE GPM 100 GPM |
| | MAX CONTINUOUS OPERATION |
| | RCDL DISC 2" FLGD (15PSI MAX FLOW LOSS) - IT CAN GO UP |
| | TO 17PSI AT 240 GPM |
| | AWWA SAYS 160 GPM. NOTE: AS OF DECEMBER 20, 2015 THE |
| | CITY OF WEST PALM BEACH |
| | CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED, |
| | MAKING KNOWN THAT "ALL BACKFLOW DEVICES MUST BE LEAD |
| | FREE." |
| | FOR MORE INFORMATION REFER TO THE LINK BELOW: |
| | HTTP://WPB.ORG/DEPARTMENTS/PUBLIC-UTILITIES/FORMS-PUBLI |
| | CATIONS/BACKFLOW-CROSS-CONNECTION-CONTROL-MANUAL |
| | |
| | #5 ADDITIONAL PERMITS THRU CONSTRCUCTION SERVICES |
| | INCLUDE FIRELINE PERMIT (ON-SITE FIRELINE), PAVING FOR |
| | FINAL LIFT OF ASPHALT (PRIVATE PROPERTY), ROW PERMIT |
| | WILL ALSO BE REQUIRED FOR PAVING ALLEY AND N STREET ROW |
| | / LAKE AVE. |
| | |
| | #6 SUBMIT PLAT AND SUBDIVISION BOND. (IF YOU PREFER TO |
| | USE CITY BOND DOCUMENTS CAN BE DOWNLOADED AT LINK |
| | BELOW) |
| | HTTP://WPBFL.US/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FO |
| | RMS,-PERMITS-APPLICATIONS |
| | |
| | #7 CITY SIDEWALKS TO BE 3000 PSI AS PER LATEST DETAIL |
| | GC-1 |
| | HTTP://WPBFL.US/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FO |
| | RMS,-PERMITS-APPLICATIONS |
| | |
| | #8 CONDO DOCS SHALL ADDRESS - SANITATION LOCATIONS - |
| | PATH FOR SANITATION TRUCK ACCESS MUST MEET THE |
| | FOLLOWING: THE TRUCK NEEDS TO HAVE NO LESS THAN A 26' |
| | HIGH VERTICAL CLEARANCE AREA FOR THE TRUCK TO PICK UP |
| | THE DUMPSTER. THIS IS THE CLEAR AREA OVER WHERE THE |
| | TRUCK WILL BE STOPPED TO DUMP THE CANS. THE TRUCK NEEDS |
| | TO HAVE NO LESS THAN 14' HIGH VERTICAL CLEARANCE TO |
| | DRIVE THRU AND 12' HORIZONTAL CLEARANCES FOR THE TRUCK |
| | TO DRIVE THROUGH. PICKUP AREAS MUST BE LOCATED TO ALLOW |
| | THE SANITATION TRUCK TO BACK UP NO MORE THAN 50' |
| | STRAIGHT BACK AFTER RESETTING THE CAN. CANS MUST BE |
| | PLACED WHERE TRUCK ARM CAN EXTEND AND PICKUP EACH CAN |
| | INDIVIDUALLY. YOU MAY DEMONSTRATE TURN RADIUS AND TRUCK |
| | MANEUVERING VIA PLAN. ONWER MAY AGREE TO THE CONDITION |
| | OF PLACING THE DUMPSTER IN AN OPEN AREA FOR PICKUP; |
| | HOWEVER THIS CONDITION WILL BE PLACED VIA NOTE ON YOUR |
| | APPROVED SITE PLAN. |
| | |
| | MANUEL JULIAN GONZALEZ |
| | ENGINEERING PROJECT COORDINATOR |
| | PUBLIC WORKS DEPARTMENT |
| | 401 CLEMATIS STREET, 4TH FLOOR |
| | WEST PALM BEACH, FL 33401 |
| | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) |
| | MAIN PHONE: (561) 822-1200 |
| | DIRECT: (561) 494-1085 |
| | FAX: (561) 494-1116 |
| | EMAIL: [email protected] |
| | WWW.WPB.ORG/ENGINEERING |
| | |
| | |
| | |
| | |
| | |