Plan Review Details - Project E15080030
| Plan Review Stops For Project E15080030 |
| Review Stop |
ENG-A |
ENGINEERING FORMAL REVIEW |
| Rev No |
1 |
Status |
P |
Date |
02-12-2016 |
|
|
Cont ID |
|
| Sent By |
mgonzale |
Date |
12-18-2015 |
Time |
07:33 |
Rev Time |
0.00 |
| Received By |
mgonzale |
Date |
12-01-2015 |
Time |
07:33 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ENG-D |
ENGINEERING DEFICIENCY REVIEW |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ENG-E |
ENGINEERING ENVR. MIT. REVIEW |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ENG-F |
ENGINEERING FINAL DRAWING REV |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ENG-M |
ENGINEERING MODIFICATION REV |
| Rev No |
1 |
Status |
P |
Date |
02-12-2016 |
|
|
Cont ID |
|
| Sent By |
Mgonzale |
Date |
02-12-2016 |
Time |
|
Rev Time |
16.00 |
| Received By |
mgonzale |
Date |
01-04-2016 |
Time |
|
Sent To |
I |
|
| Notes |
| 2016-02-12 07:35:49 | APPROVED WITH CONDIDITION: | | | | | | PROJECT SHALL OBTAIN A ROW PERMIT WITH PBC ROAD ROW. | | | ALL PAVEMENT REPLACEMENTS ON HAVERHILL ROAD SHALL BE BE | | | PBC ROADWAY STANDARDS. | | | | | | WHEN SERVICE IS REMOVED, IT MUST BE CUP AND CAPPED AT | | | THE MAIN. IF IT IS NOT REMOVED YOU MAY SET A CITY FIRE | | | HYDRANT AT THE PROPERTY LINE. | | | | | | CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED MAKING | | | KNOWN THAT "ALL BACKFLOW DEVICES MUST BE LEAD FREE." | | | FOR MORE INFORMATION REFER TO THE LINK BELOW: HTTP://WP | | | B.ORG/DEPARTMENTS/PUBLIC-UTILITIES/FORMS-PUBLICATIONS/B | | | ACKFLOW-CROSS-CONNECTION-CONTROL-MANUAL | | | YOU MUST SUBMIT A SPECIFICATION SHEET FOR EACH BACKFLOW | | | APPARATUS FOR APPROVAL. | | | | | | ALL UTILITY ELEMENTS SHALL BE INSTALLED AS PER LATEST | | | CITY OF WPB STANDARDS AND APPROVED MATERIAL LIST. | | | | | | OTHER PERMITS MAY BE REQUIRED SUCH AS UG FIRELINE, FA | | | OR FS THRU DEVELOPMENT SERVICES (BUILDING DEPARTMENT). | | | | | | MANUEL JULIAN GONZALEZ | | | ENGINEERING PROJECT COORDINATOR | | | PUBLIC WORKS DEPARTMENT | | | 401 CLEMATIS STREET, 4TH FLOOR | | | WEST PALM BEACH, FL 33401 | | | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) | | | MAIN PHONE: (561) 822-1200 | | | DIRECT: (561) 494-1085 | | | FAX: (561) 494-1116 | | | EMAIL: [email protected] | | | WWW.WPB.ORG/ENGINEERING | | | | | | I | | | | | | |
|
|
| Review Stop |
ENG-P |
ENGINEERING PLANNING REVIEW |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ENG-T |
ENGINEERING TRAFFIC STUDY REV |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| |
Print |
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |