Plan Review Details - Project E15080030
Plan Review Stops For Project E15080030
Review Stop ENG-A ENGINEERING FORMAL REVIEW
Rev No 1 Status P Date 02-12-2016 Cont ID  
Sent By mgonzale Date 12-18-2015 Time 07:33 Rev Time 0.00
Received By mgonzale Date 12-01-2015 Time 07:33 Sent To  
Notes
***NONE***

Review Stop ENG-D ENGINEERING DEFICIENCY REVIEW
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-E ENGINEERING ENVR. MIT. REVIEW
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-F ENGINEERING FINAL DRAWING REV
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-M ENGINEERING MODIFICATION REV
Rev No 1 Status P Date 02-12-2016 Cont ID  
Sent By Mgonzale Date 02-12-2016 Time   Rev Time 16.00
Received By mgonzale Date 01-04-2016 Time   Sent To I
Notes
2016-02-12 07:35:49APPROVED WITH CONDIDITION:
  
 PROJECT SHALL OBTAIN A ROW PERMIT WITH PBC ROAD ROW.
 ALL PAVEMENT REPLACEMENTS ON HAVERHILL ROAD SHALL BE BE
 PBC ROADWAY STANDARDS.
  
 WHEN SERVICE IS REMOVED, IT MUST BE CUP AND CAPPED AT
 THE MAIN. IF IT IS NOT REMOVED YOU MAY SET A CITY FIRE
 HYDRANT AT THE PROPERTY LINE.
  
 CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED MAKING
 KNOWN THAT "ALL BACKFLOW DEVICES MUST BE LEAD FREE."
 FOR MORE INFORMATION REFER TO THE LINK BELOW: HTTP://WP
 B.ORG/DEPARTMENTS/PUBLIC-UTILITIES/FORMS-PUBLICATIONS/B
 ACKFLOW-CROSS-CONNECTION-CONTROL-MANUAL
 YOU MUST SUBMIT A SPECIFICATION SHEET FOR EACH BACKFLOW
 APPARATUS FOR APPROVAL.
  
 ALL UTILITY ELEMENTS SHALL BE INSTALLED AS PER LATEST
 CITY OF WPB STANDARDS AND APPROVED MATERIAL LIST.
  
 OTHER PERMITS MAY BE REQUIRED SUCH AS UG FIRELINE, FA
 OR FS THRU DEVELOPMENT SERVICES (BUILDING DEPARTMENT).
  
 MANUEL JULIAN GONZALEZ
 ENGINEERING PROJECT COORDINATOR
 PUBLIC WORKS DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
 I
  
  

Review Stop ENG-P ENGINEERING PLANNING REVIEW
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-T ENGINEERING TRAFFIC STUDY REV
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved