Plan Review Details - Project E15070005
Plan Review Stops For Project E15070005
Review Stop ENG-A ENGINEERING FORMAL REVIEW
Rev No 1 Status F Date 07-21-2015 Cont ID  
Sent By Mgonzale Date 07-21-2015 Time   Rev Time 4.00
Received By mgonzale Date 06-25-2015 Time   Sent To I
Notes
2015-07-21 09:49:08PLEASE RESPOND TO COMMENTS IN WRITING:
  
 #1 ALL WATER SERVICES AND WATERMAINS COMING INTO THE
 PROPERTY MUST BE CUT AND CAP BACK AND BE RESTRAINT AT
 THE MAIN.
 #2 A SANITARY SEWER CLEAN-OUT WILL BE REQUIRED AT THE
 PROPERTY LINE.
 #3 PROPOSED SANITARY SEWER LATERAL WILL HAVE LESS
 OBSTRUCTIONS IF TIED INTO THE EXISTING 6IN. LATERAL
 SANITARY DISCHARGING INTO 12IN. SANITARY SEWER LINE AT
 DIXIE HIGHWAY. THIS WOULD AVOID THE WATERMAIN
 DEFLECTION AND CONFLICT WITH THE EXFILTRATION TRENCH.
 NOTE ON PLANS: CONTRACTOR TO VERIFY LOCATION AND IF
 SERVICE IS ACCEPTABLE FOR CONNECTION.
 #4 CITY SANITARY MANHOLE IN THE 3 FEET WIDE UTILITY
 EASEMENT MUST BE REHABILITATED AS PER CITY OF WPB
 SPECS., NOTE MANHOLE TOP MAY NEED RIM HEIGHT ADJUSTMENT
 DEPENDING ON SITE ELEVATION.
 #5 NOTE ON PLANS: REMOVAL OF THE METER BOX WHERE
 EXISTING 3IN. METER WILL NO LONGER BE NEEDED.
 #6 CALL OUT ALL MATERIALS ON PROPOSED WATERMAIN . C900
 ALLOWED AFTER THE DCDA, DIP FOR EVERYTHING ELSE ON THE
 CITY SIDE.
 #7 SHOW ENLARGED METER DETAIL. 3IN. WATERMETER MUST SIT
 ABOVE GROUND, ALL PIPING UP TO AND BEYOND METER MUST BE
 4IN. DIAMETER DIP MINIMUM. METER WITH BYPASS ASSEMBLY
 IS APPROXIMATELY 14 FEET IN LENGTH X 6 FEET WIDE,
 BACKFLOW SHOULD BE JUST BEHIND THE METER BUT OUTSIDE OF
 EASEMENT. IT IS REQUIRED THAT METER SITS JUST INSIDE
 YOUR PROPERTY IN A UTILITY EASEMENT GIVEN TO THE CITY
 OF WPB. LEGAL AND SKETCH WILL BE REQUIRED IF UTILITY
 EASEMENT IS NOT SHOWN ON THE PLAT.
 #8 EXISTING 8IN. DIAMETER SANITARY CLAY SEWER PIPE IN
 THE 3 FEET WIDE UTILITY EASEMENT MUST BE INSPECTED VIA
 VIDEO TO SEE IF REPLACEMENT IS REQUIRED, LINING MAY BE
 AN OPTION. NOTE ON PLANS THAT 6 RESIDENCES AND COTTAGES
 HAVE SANITARY SEWER CONNECTION TO THIS EXISTING 8IN.
 DIAMETER SANITARY CLAY SEWER PIPE.
 #9 WATERMAIN LOCATED IN THE 3 FEET WIDE UTILITY
 EASEMENT DOES NOT SHOW DIAMETER OR MATERIAL. ALSO NOT
 WATER SERVICES ARE SHOWN FOR THE MUSEUM HOUSING.
 #10 3 FEET WIDE UTILITY EASEMENT DOES NOT OFFER ENOUGH
 WIDTH FOR MAINTENANCE OF EXISTING UTILITIES. THE CITY
 REQUIRES A MINIMUM A 15 FEET EASEMENT.
 #11 PROVIDE UTILITY EASEMENTS FOR FIRE HYDRANTS THAT
 SIT JUST INSIDE OF THE PROPERTY. I COUNTED ATLEAST 4
 CITY OF WPB FIRE HYDRANTS.
 #12 CALL OUT ALL WATER SERVICES AND METER BOXES SERVING
 THE PROPERTY. PLEASE SPECIFY IF IRRIGATION, DOMESTIC
 USE FOR EACH SERVICE. THERE IS ONE ON DIXIE HIGHWAY
 NEXT TO 3IN. METER AND ONE ON JEFFERSON ROAD NEAR FDC.
 #13 CALL OUT MATERIAL OF SANITARY SEWER ON JEFFERSON AS
 CLAY PIPE.
 #14 CALL OUT MANHOLES ON DIXIE HWY AS SANITARY. CALL
 OUT SIZE 12IN. CLAY GRAVITY SEWER.
 #15 PLEASE KNOW THAT DIXIE HIGHWAY IS AN FDOT ROAD,
 ADDITIONAL PERMITS WILL BE REQUIRED.
 #16. ANY RELOCATION OF HYDRANTS AND OR CAPPING OF LINES
 MUST BE ADEQUATELY RESTRAINT. THE RESTRAINT LENGTH MUST
 BE SHOWN ON PLANS OR SHOWN AS INSTALLED AND DISPLAYED
 ON AS-BUILTS.
 #17 PROPOSED WATER METER MUST BE TIE-IN AS FAR AWAY
 FROM WATER ARV AS REQUIRED NOT TO ALLOW -FREE AIR- INTO
 THE WATER SERVICE. PLEASE NOTE A MINIMUM DISTANCE FROM
 ARV ON PLANS.
 #18 REVIEW CITY OF WPB STANDARD DETAILS. THERE ARE
 MISSING DETAILS, SUCH AS CURBING, SIDEWALK, DRIVEWAY
 DETAILS. PLEASE REMOVE DETAIL WS-6 AND CONCRETE
 SIDEWALK DETAIL SINCE IT'S NOT A CITY STANDARD DETAIL.
 HTTP://WPB.ORG/ENGINEERING/FORMS-AND-PUBLICATIONS/
 #19 REVISE COST ESTIMATE AS PER REVISIONS.
 #21 SITE PLAN AND LANDSCAPE PLANS WAS MISSING FROM YOUR
 SUBMITTAL.
 #22 PROJECT WILL ALSO REQUIRED A POLLUTION PREVENTION
 PLAN, SHOWING CATCH BASIN PROTECTION, ETC..
  
 MANUEL JULIAN GONZALEZ
 ENGINEERING PROJECT COORDINATOR
 PUBLIC WORKS DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
  
  

Review Stop ENG-D ENGINEERING DEFICIENCY REVIEW
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-E ENGINEERING ENVR. MIT. REVIEW
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-F ENGINEERING FINAL DRAWING REV
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-M ENGINEERING MODIFICATION REV
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-P ENGINEERING PLANNING REVIEW
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-T ENGINEERING TRAFFIC STUDY REV
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***