Plan Review Details - Project E14080009
Plan Review Stops For Project E14080009
Review Stop ENG-A ENGINEERING FORMAL REVIEW
Rev No 1 Status P Date 08-11-2014 Cont ID  
Sent By Mgonzale Date 08-11-2014 Time   Rev Time 36.00
Received By mgonzale Date 08-11-2014 Time   Sent To I
Notes
2014-08-11 09:42:21SHEET C-2 HAS BEEN APPROVED WITH THE FOLLOWING NOTES:
 1. AS-BUILT MUST SHOW CROSSING OF UNDERGROUND CABLES
 RUNNING EAST-WEST IN ALLEY.
 2. PAVEMENT REPAIR MUST INCLUDE A 20? X 20? MINIMUM
 AREA. DENSITIES WILL BE REQUIRED.
 3. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO
 COORDINATE ALL RELOCATIONS AND ALL MODIFICATIONS OF THE
 EXISTING UTILITIES.
  
 MANUEL JULIAN GONZALEZ
 PROJECT COORDINATOR
 ENGINEERING AND PUBLIC WORKS DEPARTMENT
 CITY OF WEST PALM BEACH
  
  
  

Review Stop ENG-D ENGINEERING DEFICIENCY REVIEW
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-E ENGINEERING ENVR. MIT. REVIEW
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-F ENGINEERING FINAL DRAWING REV
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-M ENGINEERING MODIFICATION REV
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-P ENGINEERING PLANNING REVIEW
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-T ENGINEERING TRAFFIC STUDY REV
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved