| 2014-07-07 15:31:32 | DISCUSSED ON PHONE WITH ENGINEER, THEN EMAILED |
| | COMMENTS. |
| | |
| | THE FOLLOWING INFORMATION IS NEEDED TO COMPLETE THE |
| | ENGINEERING DEPARTMENT REVIEW OF THE APPLICATION FOR A |
| | DEVELOPMENT PERMIT AT 4201 GEORGIA AVENUE. |
| | |
| | PLEASE DEMONSTRATE THAT THE FOLLOWING CONDITIONS OF |
| | INFORMAL SITE PLAN APPROVAL HAVE BEEN MET: |
| | 1.C. APPLY FOR AND RECORD THE UNITY OF TITLE |
| | 1.D. DEMONSTRATE THE WORK PROPOSED WITHIN THE EXISTING |
| | EASEMENTS IS ACCEPTABLE TO THE EASEMENT HOLDER(S) |
| | 3. OBTAIN A RIGHT-OF-WAY PERMIT FOR THE WORK PROPOSED |
| | WITHIN THE CITY?S RIGHT-OF-WAYS |
| | |
| | SUBMIT ONE (1) COMPLETE SET OF FINAL SITE PLAN APPROVAL |
| | DRAWINGS. THE FINAL SET WILL BE STAMPED AS APPROVED BY |
| | THE CITY OF WEST PALM BEACH PLANNING DEPARTMENT. |
| | |
| | PLEASE SUBMIT A SIGNED AND SEALED BOUNDARY SURVEY. THE |
| | SURVEY SHOULD SHOW ALL EXISTING EASEMENTS. |
| | |
| | PLEASE PROVIDE A COST ESTIMATE WHICH INCLUDES ONLY THE |
| | CONSTRUCTION PROPOSED WITHIN THE CITY?S EASEMENTS OR |
| | RIGHT-OF-WAYS. |
| | |
| | PLEASE PROVIDE A COPY OF THE FINAL LANDSCAPE PLAN. |
| | - IN ADDITION TO BEING INSTALLED ALONG THE EXFILTRATION |
| | TRENCH AND STORMWATER PIPING (NOTE 1 ON SHEET C-1), |
| | ROOT BARRIERS SHOULD ALSO BE INCLUDED FOR THOSE |
| | PLANTINGS WITHIN FIVE FEET OF ALL MUNICIPAL OWNED |
| | UTILITIES. PLEASE INCLUDE PLAN VIEW AND PROFILE FOR THE |
| | ROOT BARRIERS LOCATIONS. THE ROOT BARRIERS MUST BE |
| | LOCATED AT LEAST FIVE FEET FROM ALL UTILITIES, A |
| | MINIMUM OF 42 INCHES DEEP, AND AT LEAST 15 FEET LONG |
| | CENTERED ON A TREE. |
| | - THE LANDSCAPE PLAN SHOULD ALSO INCLUDE DETAILS OF THE |
| | PROPOSED PRIVACY WALL. |
| | |
| | CONSTRUCTION PLANS |
| | PLEASE INCLUDE A DETAIL FOR THE EXFILTRATION TRENCH |
| | CONTROL STRUCTURE. |
| | |
| | ALTHOUGH THE CITY'S PROJECT AT THIS INTERSECTION IS |
| | PLANNED TO BEGIN CONSTRUCTION WITHIN THE NEXT YEAR, THE |
| | SCHEDULE MAY NOT COINCIDE WITH THE DEVELOPMENT OF THIS |
| | PARCEL. WHAT CONTINGENCY PLANS HAVE BEEN MADE IN THE |
| | EVENT CONSTRUCTION OF THIS PARCEL PROCEEDS BEFORE THE |
| | CITY?S PLANNED UTILITY CONSTRUCTION AND INTERSECTION |
| | IMPROVEMENTS? |
| | |
| | PLEASE SUBMIT CONSTRUCTION PLANS FOR THE IMPROVEMENTS |
| | PROPOSED WITHIN THE RIGHT-OF-WAY TO SUPPORT DEVELOPMENT |
| | OF THIS PARCEL. |
| | |
| | THE DRIVEWAY ON GEORGIA AVENUE IS CENTERED ON TWO |
| | EXISTING POWER POLES. HAVE THE OWNERS OF THE POLES BEEN |
| | CONTACTED TO DETERMINE IF THE POLES CAN BE RELOCATED? |
| | |
| | THERE IS ALSO AN EXISTING ABOVE GROUND VALVE LOCATED |
| | JUST SOUTH OF THE DRIVEWAY. WILL THIS VALVE BE REMOVED |
| | OR RELOCATED? IF THE LINE IS GOING TO BE ABANDONED, |
| | PLEASE INDICATE THAT THE LINE WILL BE REMOVED. |
| | |
| | PLEASE REVISE THE SIDEWALK-DRIVEWAY CROSSINGS TO |
| | INCLUDE DETECTABLE WARNINGS THAT MEET FLORIDA |
| | ACCESSIBILITY CODE AND ADA GUIDELINES. |
| | |
| | THE PLANS SHOW AN EXISTING OVERHEAD UTILITY LINE |
| | CROSSING OVER THE PROPOSED NORTHERN BUILDING |
| | (PHARMACY). IS THE OVERHEAD LINE NOT IN AN EXISTING |
| | EASEMENT? PLEASE VERIFY THAT THE VERTICAL CLEARANCE IS |
| | SUFFICIENT FOR CONSTRUCTION OF THE BUILDING. |
| | |
| | PLEASE SHOW THE LOCATIONS OF THE BACKFLOW PREVENTERS |
| | FOR THE PROPOSED WATER SERVICES. IF ANY OF THE |
| | BUILDINGS ARE PROPOSED TO BE SPRINKLED, PLEASE SHOW THE |
| | LOCATION OF THE FIRE LINES. |
| | |
| | ARE THE SANITARY SERVICE LINES PROPOSED TO TIE INTO |
| | EXISTING LATERALS OR ARE NEW CONNECTIONS PROPOSED? |
| | PLEASE NOTE THAT THE PIPE SIZE BETWEEN THE MAIN LINE |
| | AND THE WYE SHOULD BE A MINIMUM SIZE OF 6-INCHES IN |
| | DIAMETER. |
| | |
| | ADDITIONAL COMMENTS |
| | PRIOR TO SCHEDULING PRECONSTRUCTION MEETING, THE |
| | FOLLOWING DOCUMENTS MUST BE SUBMITTED TO ENGINEERING: |
| | - NPDES PERMIT |
| | - DEWATERING PERMIT (IF DEWATERING IS PROPOSED) |
| | - A COPY THE FDEP SELF-CERTIFICATION FOR A STORMWATER |
| | MANAGEMENT SYSTEM IN UPLANDS SERVING LESS THAN 10 ACRES |
| | OF TOTAL PROJECT AREA AND LESS THAN 2 ACRES OF |
| | IMPERVIOUS SURFACE OR SFWMD PERMIT. |
| | |