Plan Review Details - Project E14040012
Plan Review Stops For Project E14040012
Review Stop ENG-A ENGINEERING FORMAL REVIEW
Rev No 1 Status F Date 04-15-2014 Cont ID  
Sent By Mgonzale Date 04-14-2014 Time   Rev Time 8.00
Received By mgonzale Date 02-28-2014 Time   Sent To Z
Notes
2014-04-15 08:52:41REVIEW - LOFTIN PLACE 04/14/2014
 #1 NOTE ON PLANS THAT MASTER METER WILL BE INSTALLED
 ABOVE GROUND.
 #2 SEPARATE DOMESTIC TAP FROM FIRE TAPP
 #3 TAPPING VALVE AND SLEEVE CAN BE THE VALVES FOR FIRE
 AND DOMESTIC. NO NEED FOR ADDITIONAL VALVES.
 #4 CALL OUT MATERIAL OF PIPE AT THE UTILITY CROSSING
 TABLE FOR WATER SEWER AND STORM.
 #5 FDC LOCATION SHALL BE JUST INSIDE THE PROPERTY AND
 NOT ON CITY OF WPB R.O.W.
 #6 WATER LINES FOR FUTURE SERVICE MUST SHOW VERTICAL
 CLEARANCES AND PIPE MATERIAL CALL OUT.
 #7 NOTE ON PLANS: STORM STRUCTURE THAT IS REMAINING ON
 EUCAPYPTUS STREET CANNOT REMAIN IF BRICK. MAKE NOTE
 PROVISIONS TO REPLACE IN THE EVENT THE STRUCTURE IS
 BRICK.
 #8 ALL PIPING FOR 3 INCH METER TO BE 4 INCH DIAMETER
 DIP.
 #9 NOTE ON PLANS: CITY ONLY GUARANTEES ADEQUATE WATER
 PRESSURES TO 2ND STORY; BEYOND MUST BE THRU PRIVATE
 PUMPING SYSTEM.
 #10 WATER SERVICE STUB FROM NORTH DIXIE UNTO PARCEL C
 MUST BE CUT AND CAPPED AT MAIN. I WOULD SUGGEST
 REDUCING AND UTILIZING FOR A IRRIGATION SERVICE.
 #11 OLD WATER SERVICES MUST BE CUT BACK TO MAIN. NOTE
 TO BE CUT, CAPPED AND RESTRAINED AT MAIN.
 #12 SHOW EXISTING FIRE HYDRANT AT 6TH STREET AND OLIVE
 AVENUE.
 #13 NOTE ON PLANS THAT ANY DISTURBANCE BROUGHT UPON
 EXISTING INFRASTRUCTURE SUCH AS WATER, SEWER AND STORM
 DUE TO ROW WORK IS THE RESPONSIBILITY OF THE CONTRACTOR
 TO REPLACE TO EQUAL OR BETTER.
 #14 SHOW ALL SIDEWALK PATH EASEMENTS. THIS SHOULD
 INCLUDE ADA ACCESS AROUND THE PERIMETER OF THE SITE
 INCLUDING INTERACTION UNTO EXISTING SIDEWALKS AND
 ADJACENT STREETSCAPES. SHEET C-09 WOULD BE MY
 SUGGESTION. CALL OUT MATERIAL OF SURFACES; THAT BEING
 CONCRETE, PAVERS, ASPHALT ETC. ALL APRONS MUST BE 6
 INCH THICK 3000PSI CONCRETE MINIMUM.
 #15 STREET LIGHTS NOT SHOWN, NOR DO I SEE AN IRRIGATION
 PLAN. THIS ALL WILL FALL ON THE DEVELOPER TO OBTAIN A
 MAINTENANCE AGREEMENT WITH THE CITY. CONTACT VINCENT
 NOEL AT CITY OF WPB ENGINEERING (561) 494-1096.
 #16 CALL OUT STRIPING TO BE (THERMOPLASTIC)
 #17 NOTE: EXIST CONCRETE SANITARY MANHOLES IN THE ROW
 THAT WILL BE CONNECTED TO WILL HAVE TO BE REHABILITATED
 PER CITY OF WPB STANDARDS OR REPLACED IF FOUND TO BE OF
 BRICK MATERIAL.
  
  

Review Stop ENG-D ENGINEERING DEFICIENCY REVIEW
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-E ENGINEERING ENVR. MIT. REVIEW
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-F ENGINEERING FINAL DRAWING REV
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-M ENGINEERING MODIFICATION REV
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-P ENGINEERING PLANNING REVIEW
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-T ENGINEERING TRAFFIC STUDY REV
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved