|
 |
 |
 |
 |
 |
Plan Review Details - Project E14030024
| Plan Review Stops For Project E14030024 |
| Review Stop |
ENG-A |
ENGINEERING FORMAL REVIEW |
| Rev No |
1 |
Status |
P |
Date |
03-10-2014 |
|
|
Cont ID |
|
| Sent By |
MGONZALE |
Date |
03-10-2014 |
Time |
|
Rev Time |
4.00 |
| Received By |
mgonzale |
Date |
03-10-2014 |
Time |
11:07 |
Sent To |
I |
|
| Notes |
| 2014-03-10 11:06:33 | PASSED WITH PROVISO: | | | | | | #1 STAINLESS STEEL TAPPING SLEEVE IS NOT ALLOWED SINCE | | | TAPPED LINE ONLY TWICE THE DIAMETER OF THE PROPOSED 4" | | | PIPE. | | | PLEASE USE A DUCTILE IRON SLEEVE. ON PAGE 19 OF 54 OF | | | THE CITY'S APPROVED MATERIAL LIST YOU MAY FIND | | | ACCEPTABLE PRODUCTS. | | | | | | #2 PLEASE SUBMIT AML PAGE 19 VIA EMAIL TO | | | [email protected] | | | | | | #3 PLANS ARE BEING APPROVED "AS-NOTED" | | | | | | MANUEL JULIAN GONZALEZ | | | ENGINEERING PROJECT COORDINATOR | | | ENGINEERING SERVICES AND PUBLIC WORKS DEPARTMENT | | | 401 CLEMATIS STREET, 4TH FLOOR | | | WEST PALM BEACH, FL 33401 | | | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) | | | MAIN PHONE: (561) 822-1200 | | | DIRECT: (561) 494-1085 | | | FAX: (561) 494-1116 | | | EMAIL: [email protected] | | | WWW.WPB.ORG/ENGINEERING | | | | | | | | | |
|
|
| Review Stop |
ENG-D |
ENGINEERING DEFICIENCY REVIEW |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ENG-E |
ENGINEERING ENVR. MIT. REVIEW |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ENG-F |
ENGINEERING FINAL DRAWING REV |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ENG-M |
ENGINEERING MODIFICATION REV |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ENG-P |
ENGINEERING PLANNING REVIEW |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ENG-T |
ENGINEERING TRAFFIC STUDY REV |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| |
Print |
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |