Review Stop ENG-A ENGINEERING FORMAL REVIEW
Rev No 1 Status F Date 02-12-2014 Cont ID  
Sent By Mgonzale Date 02-11-2014 Time   Rev Time 32.00
Received By mgonzale Date 01-08-2014 Time   Sent To Z
Notes
2014-02-12 08:10:33DRAINAGE COMMENTS:
  
 CONVENTION CENTER HILTON HOTEL CIVIL ENGINEERING PLANS:
 SHEET C2.00
 1. LOCATION OF CONSTRUCTION ENTRANCE NOT SHOWN.
  
 SHEET C3.02
 2. NOTE SHOULD BE ADDED TO INDICATE CONTRACTOR TO
 VERIFY EXISTING WATER MAIN IS PROPERLY RESTRAINED
 BEFORE CUTTING AND CAPPING WATER MAIN AT SOUTHEAST
 CORNER OF PARKING GARAGE.
  
 SHEET C4.01
 3. ROOF DRAIN PIPING COMING OUT THE FRONT OF THE HOTEL
 ENTRANCE CHANGES FROM 12" HDPE TO 10" HDPE BACK TO 12"
 HDPE.
 4. ROOF DRAIN PIPING ALONG SOUTH SIDE OF BUILDING
 CHANGES FROM 10" TO 12". ARE THERE ROOF DRAIN
 CONNECTIONS AFTER THE CHANGE IN PIPE SIZE?
 5. MAINTENANCE OF ALL ROOF DRAINAGE PIPING IN THE
 RIGHT-OF-WAY SHOULD BE THE RESPONSIBILITY OF OTHERS AND
 NOT THE CITY.
 6. SUGGEST POOL DECK DRAINAGE BE ROUTED TO EXFILTRATION
 TRENCH TO BE CONSTRUCTED ON WEST SIDE OF BUILDING.
  
 SHEET C4.02
 7. 3' WIDE SIDEWALK PROPOSED ON NORTH AND EAST SIDES OF
 PARKING GARAGE. EAST SIDEWALK IS IN THE ALABAMA AVE.
 RIGHT-OF-WAY. DOES THIS WIDTH MEET CITY CODE?
 8. NORTH DRIVEWAY APPEARS TO SLOPE INTO THE GARAGE.
 PROPOSED GRADES AT SOUTH END OF THIS DRIVEWAY ARE
 23.50. EXISTING PAVEMENT GRADE NEAR MIDDLE OF DRIVEWAY
 IS 23.58.
  
 SHEET C5.01
 9. CONSULTANT TO VERIFY UTILITY CROSSING "O".
 ELEVATIONS INDICATE FIRE MAIN CROSSES UNDER STORM.
  
 UTILITIES / ROW COMMENTS:
  
 #1 A DETECTOR CHECK ASSEMBLY (DCDA) WILL BE REQUIRED
 JUST INSIDE THE
 PROPERTY LINE. LOCATION TIE-IN AT OKEECHOBEE BLVD.
  
  
 #2 THE PROPOSED METER ASSEMBLY OFF OKEECHOBEE BLVD CAN
 COME OFF THE
 FIRELINE BEFORE ?THE CITY'S RWGV?.
  
  
 #3 POOL BACKWASH EQUIPMENT MUST DRAIN INTO THE SEWER.
 AIR GAP IS REQUIRED
 IN A MANNER TO PREVENT CROSSCONNECTION.
  
  
 #4 SHOW FDC LOCATION(S)
  
  
 #5 FLORIDA AVENUE CONSTRUCTION ? CITY WILL REQUIRE A
 SEPARATE PLAN OR MORE
 DETAIL ON CURENT PLANS ADDRESSING RE-STRIPING,
 IRRIGATION, AND LIGHTING.
 PLAN SHOULD ALSO DEPICT AREAS OF PAVEMENT REPLACEMENT.
 THERMOPLASTIC MUST
 BE SPECIFIED WHERE STRIPING OR TRAFFIC DEVICES ARE USED
 OR INTERACT
 DIRECTLY WITH THE R.O.W.
  
  
 #6 ADA RAMPS AND CROSSWALKS ARE REQUIRED TO CROSS
 PATRONS FROM PARKING TO
 THE CONVENTION CENTER. THIS MAY INCLUDE RAMPS AND CROSS
 WALK THRU HOTEL
 SERVICE ENTRANCE APRON.
  
  
 #7 DEPRESSED CURB ON SOUTH ENTRANCE MUST MEET ADA
 SLOPES.
  
  
 #8 FIRELINE COMING FROM OKEECHOBEE MUST BE LAYED ON
 YOUR SITE. PLEASE NOTE
 A SMALL PORTION COMES OUT INTO R.O.W., PLEASE CORRECT
 ALIGNMENT.
  
  
 #9 VERIFY SIDEWALK WIDTHS ON ALABAMA AVE AND ALONG
 ONE-WAY DRIVE. ADAAG
 REQUIRES A MINIMUM OF 36? WIDTH WITH 60? AREAS WHERE
 MANUVERABILITY IS
 REQUIRED.
  
  
 #10 ENTRY AND EXIT DRIVEWAY APRONS ON PARKING GARAGE
 MUST MEET CITY OF WPB
 STANDARD, CONCRETE APRON. CONCRETE INSTEAD OF ASPHALT
 WILL BE REQUIRED AT
 HOTEL ENTRANCE APROACH.
  
  
 #11 WILL THERE BE ANY SIDEWALK EASEMENTS? FOR WALKING
 PATRONS FROM
 OKEECHOBEE BLVD ALONG THE FRONT OF THE HOTEL TO REACH
 THE CONVENTION
 CENTER.
  
  
 #12 EXIST FIRE HYDRANT LOCATED NEAR SOUTH EAST CORNER
 OF HOTEL SITE IS NOT
 SHOWN. WM FEEDING THE HYDRANT MAY BE IN CONFLICT WITH
 PROPOSED SANITARY
 SEWER.
  
  
 #13 LIGHT POLES ALONG THE SOUTH SIDE OF THE HOTEL
 PROPERTY ARE NOT SHOWN IN
 THE NEW SIDEWALK SCHEME. COULD YOU SHOW OR CALL OUT.
  
  
 #14 IRRIGATION ALONG THE FRONTAGE OF THE HOTEL SITE IS
 NOT SHOWN. ALONG
 ROW OF OKEECHOBEE, FLORIDA. DEVELOPER WILL BE
 RESPONSIBLE TO IRRIGATE NEW
 LANDSCAPE.
  
  
 #15 PROPOSED SEWER LATERAL INTO ANY EXISTING MANHOLE
 WILL REQUIRE THE
 EXISTING MANHOLE TO BE REHABILITATED. PLEASE NOTE OR
 CHANGE TIE-IN LOCATION
 UNTO SEWER MAIN.
  
  
 #16 CALL OUT DOMESTIC WATER METER VAULT AS ?CONCRETE?
 WITH ?H-20 ALUMINUM
 SPRING LOADED HINGES?.
  
  
 #17 PLEASE INSTALL A DCDA JUST PASSED 12?X8? AND GATE
 VALVE.
  
  
 #18 REWORK THE OUTLINE AROUND METER AREA(S) ?UTILITY
 EASEMENT? TO INCLUDE
 FIRELINE CONTROL VALVE BUT EXCLUDING THE BACKFLOWS AS
 THEY ARE CONSIDERED
 PRIVATE.
  
  
 #19 SIGNAGE PLAN MUST INCLUDE DO NOT ENTER SIGNS UNTO
 ONE-WAY DRIVE.
 SIGNAGE AT ISLANDS TO GUIDE TRAFFIC IN AND OUT OF HOTEL
 ENTRANCES.
  
  
 #20 STREET LIGHT RELOCATIONS WILL BE PERFORMED BY
 DEVELOPER.
  
  
 #21 SANITARY SERVICES ALONG FLORIDA AVE NOT USED MUST
 BE CUT AND CAPPED AT
 MAIN. THERE ARE 5.
  
  
 #22 CITY STADARD SANITARY SEWER SERVICE AND CLEAN-OUT
 DETAILS ARE NOT ON
 PLAN.
  
  
 #23 FOR IRRIGATION REMOVE DETAIL WS-10 (CITY REQUIRES
 RPPA DEVICE ON ALL
 PROPOSED IRRIGATION.
  
  
  

Review Stop ENG-D ENGINEERING DEFICIENCY REVIEW
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-E ENGINEERING ENVR. MIT. REVIEW
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-F ENGINEERING FINAL DRAWING REV
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-M ENGINEERING MODIFICATION REV
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
2014-04-18 10:48:28WPB CONVENTION CENTER HOTEL

Review Stop ENG-P ENGINEERING PLANNING REVIEW
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-T ENGINEERING TRAFFIC STUDY REV
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***