2013-08-12 11:06:54COMMENTS
  
 REMOVING EXISTING APRON OFF DIXIE.
 SHOWING CONDUITS FOR IRRIGATION ON PLANTER AREAS.
 VERTICAL DISTANCE BETWEEN WATER AND PROPOSED DRAINAGE
 ON EXFILTRATION WE ASKED THAT THE PIPE BE 18" IN
 DIAMETER MINIMUM
 WHERE SEWER CONNECTION IS MADE IN THE ALLEY WE ASK THAT
 A MANHOLE BE PLACED (TOO LONG OF A RUN TO NEXT MANHOLE)
 300'+
 STOP SIGN AND STOP BARS AT DRIVEWAYS (THERMO PLASTIC)
 EXPLAIN BUILDING FFE LOWER THAN STORM MH M-4.
 PLAN SHOW A DOOR OPENING OUT UNTO ROW
 OVERLAY FOR STORM AND WATER SHALL BE ONE.
 PLACE IRRIGATION METER ON-SITE IN AN EASEMENT.
 SURVEY HIBISCUS STREET AS YOUR PLAN DOES NOT MATCH
 CORRECT FIELD DIMENSIONS.
  
 TWARD COMMENTS
 REFER TO Z12110016 COMMENTS 07/23/2013
  
 MANUEL JULIAN GONZALEZ
 ENGINEERING PROJECT COORDINATOR
 ENGINEERING SERVICES AND PUBLIC WORKS DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 MOBILE: (561) 644-7301
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  

Review Stop ENG-D ENGINEERING DEFICIENCY REVIEW
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-E ENGINEERING ENVR. MIT. REVIEW
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-F ENGINEERING FINAL DRAWING REV
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-M ENGINEERING MODIFICATION REV
Rev No 1 Status P Date 11-12-2013 Cont ID  
Sent By mgonzale Date 11-12-2013 Time   Rev Time 40.00
Received By mgonzale Date 10-21-2013 Time   Sent To  
Notes
2013-11-12 21:05:43PASSED WITH PROVISOS:
  
 #1 DIRECT TAP FOR DOMESTIC AND FIRE WILL BE DONE
 INDEPENDENT OFF EACH OTHER TIED BACK TO THE 12" DIP WM.
 PROPER CLEARANCE AND PIPE RESTRAINTS MUST BE USED
 DURING THIS INSTALLATION.
  
 #2 IRRIGATION SERVICES WILL REQUIRE AN RPZ JUST INSIDE
 THE PROPERTY.
  
 #3 IRRIGATION CONDUITS WILL BE REQUIRED FOR LANDSCAPE
 ISLANDS IN THE ROW OF HIBISCUS.
  
 #4 EXISTING STORM WATER PIPING IN CITY ROW OR EASEMENTS
 ABANDONED IN PLACE MUST BE REMOVED WHEN POSSIBLE.
 FLOWABLE FILL WOULD BE CONSIDERED AN ALTERNATE OPTION
 AS APPROVED.
  
 #5 CONTRACTOR MUST IMPLEMENT NPDES AND SHALL
 IMPLEMENTPOLLUTION PREVENTION FOR ALL WORK IN ROW.
  
 #6 AS-BUILTS AND E.O.R. CERTIFICATION WILL BE REQUIRED
 FOR THIS PROJECT.
  
 #7 ROW PERMIT IS REQUIRED FOR WORK PERFORMED IN ROW.
  
 #8 48 HOUR NOTICE MUST BE PROVIDED THRU EOR TO CITY'S
 ASSIGNED CONSTRUCTION COORDINATOR.
  
 #9 ANY ROW WORK WILL REQUIRE A CERTIFIED MAINTENANCE OF
 TRAFFIC PLAN APPROVED BY CITY'S TRAFFIC ENGINEER.
  
 #10 LARGE DOMESTIC METER WILL BE INSTALLED ABOVE
 GROUND, CONTRACTOR MUST FOLLOW THE RECOMMENDED
 INSTALLATION PROCEDURE FROM THE MANUFACTURER
 WHICH OUTLINES METER POSITION AND COMPONENT SPACING
 WHICH ALLOWS THE METER TO READ WITH ACCURACY. METER
 LOCATION WILL REQUIRE A UTILITY EASEMENT.
 SUBMISSION OF A LEGAL AND SKETCH SURVEY DESCRIPTION
 WILL BE SUBMITTED BY THE OWNER FOR CITY TO REVIEW,
 ACCEPT AND RECORD IN PUBLIC RECORDS.
  
 #11 EXTENTS OF PAVEMENT REPLACEMENT WILL BE DETERMINED
 AREAS DISTURBED DURING EXCAVATION AND AS SET FORTH ON
 ROW PERMIT SPECIFICATIONS.
 FURTHER ENQUIRE SHALL BE MADE THRU THE CITY TRAFFIC
 ENGINEER'S OFFICE.
  
 MANUEL JULIAN GONZALEZ
 ENGINEERING PROJECT COORDINATOR
 ENGINEERING SERVICES AND PUBLIC WORKS DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 MOBILE: (561) 644-7301
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  

Review Stop ENG-P ENGINEERING PLANNING REVIEW
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-T ENGINEERING TRAFFIC STUDY REV
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved