| 2014-12-08 15:43:29 | THE FOLLOWING PLANS, WHICH WERE SUBMITTED BY YOU |
| | (SHEETS 1 THROUGH 17) DATED JUNE 12, 2014) HAVE BEEN |
| | REVIEWED AND THE FOLLOWING COMMENTS WHERE GENERATED. |
| | SHEETS 1 THRU 17 SUBMITTED VIA E-MAIL NOVEMBER 12, |
| | 2014 THEREFORE WHERE NOT SIGNED AND SEALED. PLEASE |
| | SUBMIT REVISIONS WITH TWO SIGNED AND SEALED PAPER SETS. |
| | SHEET 1 - COVER SHEET ? PLEASE INCLUDE SECTION |
| | TOWNSHIP AND RANGE AND REFERENCE: NATIONAL GEODETIC |
| | VERTICAL DATUM NGVD OF 1929. |
| | SHEET 6 COMMENTS: |
| | 1. PLEASE IDENTIFY OUTFALL PIPE DIAMETER LOCATED ON |
| | LAKE L-1 NEAR WHITEHALL (OUR GIS SHOWS 15? RCP). |
| | PROPOSED PIPE MATERIAL TO MATCH EXISTING. |
| | 2. TOE-OF-BERM MEETS HOUSE WALL AT LOT 1 WILL REQUIRE |
| | ADDITIONAL DRAINAGE TO ADDRESS STORM RUN-OFF FROM BERM. |
| | 3. 8? DIAMETER WATER MAIN GOES UNDER WALL, WALL SECTION |
| | THRU EASEMENT MUST BE REMOVABLE. A 50 L.F. DUCTILE IRON |
| | SLEEVE WILL BE REQUIRED WHERE PIPES CROSS BERMS. |
| | 4. WATER SERVICES SERVING LOTS 5 AND 6 MUST BE |
| | SEPARATED TO AVOID CONFLICT WITH STORM STRUCTURE. |
| | 5. MANHOLE 2 SHALL HAVE A CONCRETE COLLAR OR A 6? CURB |
| | AROUND THROAT TO AVOID WATER INFILTRATION FROM BERM |
| | STORM RUN-OFF. |
| | 6. SHOW ALL PROPOSED DRIVEWAYS. (TYPICAL FOR ALL |
| | SHEETS) |
| | 7. ADD DRAINAGE EASEMENT TO OUTFALL AT STRUCTURE C-12. |
| | PIPE MATERIAL IN DRAINAGE EASEMENT PORTION SHALL BE OF |
| | RCP MATERIAL. (THIS WOULD BE A DRAINAGE EASEMENT THAT |
| | WOULD NEED TO BE ADDED ON THE PLAT. OTHER PLAT COMMENTS |
| | WILL BE FORTHCOMING.) |
| | 8. SHOW FDOT TRUNCATED DOMES AT PEDESTRIAN/ADA |
| | LOCATIONS. (TYPICAL FOR ALL CROSSINGS) |
| | 9. MINIMUM CROSSWALK WIDTH IS 6 FEET (SHOW SIGNAGE ON A |
| | SEPARATE STRIPPING PLAN) |
| | 10. CALL OUT ALL TRAFFIC CONTROL DEVICES AS PER FDOT |
| | DESIGN. |
| | 11. SIDEWALK RAMP AT CURVE (INTERSECTION OF MEDJOOL |
| | COURT AND SEA PALM DRIVE) SHOULD NOT EXIT PEDESTRIANS |
| | UNTO THE ROADWAY. CROSSWALKS AT CURVES ARE NOT |
| | RECOMMENDED DUE TO LESS VISIBILITY. |
| | 12. 30? RCP DRAINAGE PIPE COMING FROM THE NORTH |
| | (WHITEHALL) IS NOT SHOWN. PLEASE SHOW THIS PIPE ON YOUR |
| | PLAN SO THAT IT IS ADDRESSED WITH THE NEW LAKE EDGE |
| | CONFIGURATION. |
| | |
| | SHEET 7 COMMENTS: |
| | 1. LIFT STATION PAD AND DRIVEWAY EXCEED THE EASEMENT |
| | ALLOCATED ON PLAT. PLEASE INCLUDE THE EASEMENT TO |
| | INCORPORATE THE PROPER DIMENSIONS. |
| | 2. 8? DIAMETER WM AND 4? FM THAT GOES UNDER WALL AND |
| | BERM, A 50 L.F. DUCTILE IRON SLEEVE WILL BE REQUIRED |
| | WHERE PIPES CROSS BERMS. |
| | 3. 4? FM ALIGNMENT LEAVING L.S. SHOWN ON SHEET 6 AND |
| | SHEET 16 ARE NOT THE SAME. |
| | 4. WATER AND SEWER SERVICE FOR THE FUTURE REC CENTER |
| | SHALL BE PLACED TO AVOID WALL SECTION. |
| | 5. ?FUTURE? OUTFALL PIPE FROM STRUCTURE C-3 SHALL BE |
| | INSTALLED NOW AS PART OF THE ROADWAY DRAINAGE. |
| | 6. NO WATER AND SEWER PROVISION ARE MADE TO GUARDHOUSE. |
| | 7. NO WATER METERS FOR IRRIGATION TO LANDSCAPE AREAS |
| | SUCH AS GUARDHOUSE, BERM, LANDSCAPED R.O.W. HAVE BEEN |
| | DESIGNED ON THE PLAN. |
| | 8. ALL PVC PIPE SHALL BE MANUFACTURED IN ACCORDANCE |
| | WITH AWWA STANDARD C900. PIPE THAT IS 4 TO 12 INCHES IN |
| | DIAMETER SHALL BE C900-DR18. PIPE LARGER THAN 12 INCHES |
| | IN DIAMETER SHALL BE C905 OR C909 AND BE DR 25. |
| | 9. ADD ADDITIONAL RW GATE VALVE AT THE WATER MAIN AT |
| | INTERSECTION OF SAND PALM WAY AND SEA PALM DRIVE FOR |
| | TWO WAY FLOW OPERATION. |
| | 10. PROPOSED SEWERS SHALL BE DESIGNED TO HAVE THE SEWER |
| | ELEVATION AS SHALLOW AS THE DESIGN PARAMETERS |
| | PERIMETER. SEWER SLOPE COULD BE KEPT AT .40 PERCENT. |
| | SHALLOWEST MANHOLES COULD BEGIN TO BE 4? DEEP. CURRENT |
| | DESIGN HAS SEWERS OVER 12? DEEP WHICH WOULD BE |
| | DIFFICULT FOR THE CITY OF WPB TO MAINTAIN. |
| | 11. SEWER MAIN IN THE SAME VICINITY MUST BE ADDRESSED. |
| | MANHOLE WILL BE REQUIRED TO CAP SEWER JUST INSIDE YOUR |
| | PROPERTY LINE. 15? UTILITY EASEMENTS MUST BE PROVIDED |
| | ACCORDINGLY. |
| | 12. WATER SERVICES OR EXTENSION FOR FUTURE RESIDENTIAL |
| | AND OR COMMERCIAL SERVED OFF SEA PALM DRIVE MUST BE IN |
| | PRIOR TO FINAL LIFT OF PAVEMENT. (SHEET 8) |
| | 13. LIGHTING PLAN MUST BE APPROVED BY PLANNING AND |
| | ZONING AND SHALL BE SUBMITTED THRU CONSTRUCTION |
| | SERVICES DEPARTMENT FOR PERMITS. SHOW LIGHTING |
| | LOCATIONS ON UTILITY PLAN. |
| | 14. WHEN REMOVING EXISTING DRAINAGE OUTFALL STRUCTURE |
| | EX-CS-S, REMOVE PIPE UP TO STRUCTURE M-30. |
| | 15. LIGHTING ON CONGRESS AVENUE WILL BE APPROVED BY |
| | PALM BEACH COUNTY ROADWAY. |
| | 16. WHERE STOP BAR AND STOP SIGNS ARE PLACED A DOUBLE |
| | YELLOW IS REQUIRED AS PER MUTCD SINCE THERE IS TRAFFIC |
| | MOVING IN THE OPPOSITE DIRECTION. |
| | ALL OTHER SHEETS HAVE BEEN REVIEWED WITH THE FOLLOWING |
| | SPECIAL NOTATIONS. |
| | |
| | 1. NOTE: APPLICANT IS HEREBY NOTIFIED THAT PRIOR TO |
| | COMMENCEMENT OF CONSTRUCTION OF PRIVATE UTILITIES ON |
| | THIS SITE, A SEPARATE PERMIT MUST BE OBTAINED FROM THE |
| | CONSTRUCTION SERVICES DEPARTMENT. (THIS WOULD INCLUDE |
| | PAVING PERMIT, PLUMBING PERMITS FOR RESIDENCES AND IF |
| | ANY PRIVATE FIRE-LINES ARE REQUIRED.) |
| | 2. FM ON CONGRESS AVENUE PARALLELING THE CANAL LOCATION |
| | POSES A GENUINE AND JUSTIFIABLE FEAR OF FUTURE CROSS |
| | CONNECTION SHOULD FM PIPING FAIL. IT IS ASKED THAT THE |
| | EOR REVIEWS THE ALIGNMENT TO ADDRESS THIS TOPIC. 10 |
| | STATE STANDARDS REQUIRE NEW FM TO BE A MINIMUM FOOTAGE |
| | FROM A BODY OF WATER. |
| | 3. SHEET 11 REMOVE ADA PARKING DETAIL SINCE IT WILL NOT |
| | BE USED. |
| | 4. SHEET 12 SHOWS DIP FOR USE IN ALL SEWER PIPE, PLAN |
| | SHOWS PVC. |
| | 5. SHEET 15 WS-6 AND WS-7 DETAILS ARE NOT NEEDED. |
| | 6. SHEET 12 MH-5 AND MH-15 MEET QUALIFICATIONS BE ?DROP |
| | MANHOLES? SEE STANDARD DETAIL GS-4. |
| | 7. PLEASE PROVIDE DETAIL P-9 FORCE-MAIN AT MANHOLE. |
| | 8. MANHOLE WHERE PROPOSED MANHOLE TIES INTO MUST BE |
| | REHABILITATED TO CITY SPECIFICATIONS. |
| | 9. SHEET 8 NO DRAINAGE PROVISIONS HAVE BEEN PROVIDED |
| | FOR TRACT M. |
| | 10. SHEET 8 10? DIP WM SHALL BE INCORPORATED UNTO |
| | PROPOSED PLATTED PARCEL IN AN CITY OF WPB UTILITY |
| | EASEMENT NOT IN FUTURE PARCEL. |
| | 11. CONTRACTOR WILL PROVIDE RTU AND PANEL YOUR LS-1 |
| | DETAILS SAYS CITY. |
| | 12. ABOVE GROUND PIPING CAN BE DIP AT LS-1 |
| | 13. NO SURGE BUSTER CHECK VALVES. |
| | 14. USE HDPE ON RISER PIPES AT LS-1 |
| | 15. LS-1 DRIVEWAY MUST PROVIDE ENOUGH RADIUS AND SPACE |
| | FOR A VAC TRUCK TO STAGE. |
| | 16. USE DROP BOWL ON LS-1 IF NEEDED |
| | 17. INSTALL FALL PROTECTION ON LS-1 AS PER PBC STANDARD |
| | 18. CITY O&M HAS SUPPLIED DETAIL FOR RTU AND PANEL (SEE |
| | ATTACHED) |
| | 19. NOTE ON PLANS THAT EXISTING LIGHTING AND ROW |
| | IRRIGATION SHALL BE THE RESPONSIBILITY OF THE |
| | CONTRACTOR TO RELOCATE OR REPLACE. |
| | 20. PALM BEACH COUNTY ROADWAY PERMIT IS REQUIRED FOR |
| | IMPROVEMENTS TO CONGRESS AVENUE. APPROVED PLANS MUST BE |
| | PROVIDED PRIOR TO DEVELOPMENT PERMIT WILL BE ISSUED. |
| | 21. ANY AND ALL CITY BRICK MANHOLES SHALL BE REPLACED |
| | WITH PRE-CAST CONCRETE SPEC MANHOLE. |
| | 22. ANY DISTURBANCE BROUGHT UPON EXISTING |
| | INFRASTRUCTURE SUCH AS WATER, SEWER AND STORM DUE TO |
| | ROW WORK IS THE RESPONSIBILITY OF THE CONTRACTOR TO |
| | REPLACE TO EQUAL OR BETTER CONDITION. |
| | 23. SUPPLY AS-BUILTS OF ALL INFRASTRUCTURE IN THE ROW |
| | UPON COMPLETION. |
| | |
| | SUPPLY TWO COPIES OF DEP FORMS TO ENGINEERING |
| | DEPARTMENT OF THE PALM BEACH HEALTH DEPARTMENT FORMS. |
| | FORMS MUST SUPPLY UTILITY CAPACITY DEMANDS FOR PHASE |
| | BEING PERMITTED. ESTIMATES FOR FUTURE PHASE WILL BE |
| | REQUIRED TO KEEP ON FILE. |
| | |
| | THE CITY OF WEST PALM BEACH ENGINEERING DEPARTMENT |
| | RESERVES THE RIGHT TO ANOTHER 30 DAY REVIEW SHOULD IT |
| | BECOME NECESSARY. |
| | |
| | PRIOR TO SCHEDULING THE PRE-CONSTRUCTION MEETING, |
| | PLEASE SUBMIT THE FOLLOWING. THE CITY MAY TAKE UP TO 10 |
| | DAYS TO REVIEW AND ACCEPT THE SUBMITTAL(S). |
| | SUBMIT RIGHT-OF-WAY RESTORATION BOND IN THE AMOUNT OF |
| | 110% OF THE ESTIMATE COST OF CONSTRUCTION FOR THE WORK |
| | WITHIN THE RIGHT OF WAY AND EASEMENTS. PLEASE UTILIZE |
| | THE ENGINEERING DEPARTMENT?S STANDARD PERFORMANCE BOND |
| | PUBLIC IMPROVEMENTS FORM. |
| | HTTP://WPB.ORG/ENGINEERING/FORMS-AND-PUBLICATIONS/ |
| | 1. STORM-WATER POLLUTION PREVENTION PLAN. |
| | 2. COPY OF NPDES NOTICE OF INTENT WHICH WAS SUBMITTED |
| | TO DEP. |
| | 3. COPY OF VALID ERP FROM SFWMD/DEP OR COPY OF DEP 10/2 |
| | SELF-CERTIFICATION. |
| | 4. COPY OF VALID PALM BEACH COUNTY PERMITS (DRIVEWAY). |
| | 5. COPY OF PALM BEACH COUNTY HEALTH DEPARTMENT OR FDEP |
| | UTILITY PERMIT. |
| | 6. COPY OF VALID DEWATERING PERMIT OR EVIDENCE THAT THE |
| | PROJECT QUALIFIES FOR A NO NOTICE DEWATERING PERMIT PER |
| | SECTION 40E-20.302(3) FAC. |
| | 7. THREE (3) COPIES OF STREET LIGHTING PLANS, INCLUDING |
| | FP&L TRANSFORMER LAYOUT, OR UTILITY PLANS SHOWING |
| | LOCATIONS OF PROPOSED STREET LIGHTS AND TRANSFORMERS. |
| | 8. THREE (3) COPIES OF ?APPROVED MATERIALS LIST? SIGNED |
| | BY CONTRACTOR AND ENGINEER OF RECORD, WITH SELECTED |
| | MATERIALS HIGHLIGHTED. |
| | HTTP://WPB.ORG/ENGINEERING/FORMS-AND-PUBLICATIONS/ |
| | 9. THREE (3) COPIES OF SHOP DRAWINGS/SPECIFICATIONS |
| | MUST BE SUBMITTED ON CITY?S APPROVED MATERIALS LIST. |
| | COPIES SHOULD BE STAMPED AS APPROVED BY CONTRACTOR AND |
| | ENGINEER OF RECORD. |
| | 10. THREE (3) COPIES OF MAINTENANCE OF TRAFFIC (MOT) |
| | PLANS FOR AFFECTED PUBLIC ROADS AS APPROVED BY THE CITY |
| | TRAFFIC ENGINEER AND THE ROAD OWNER (I.E. CITY, PALM |
| | BEACH COUNTY). PRIOR COORDINATION WITH NEAR BYE SCHOOLS |
| | MUST BE CONSIDERED WHEN REQUESTING UTILITY AND OR ROAD |
| | WORK. |
| | |
| | THE PRE-CONSTRUCTION MEETING MUST BE SCHEDULED WITH |
| | THE CITY OF WEST PALM BEACH ENGINEERING DEPARTMENT AT |
| | LEAST 10 DAYS PRIOR TO INTENDED CONSTRUCTION START DATE |
| | UPON APPROVAL. |
| | ALL FEES MUST BE PAID PRIOR TO THE PRE-CONSTRUCTION |
| | MEETING. AN INVOICE WILL BE PROVIDED FOR THE CITY |
| | CONSTRUCTION ADMINISTRATION UPON SUBMISSION OF A SIGNED |
| | AND SEALED COST ESTIMATE ADDRESSING REVISIONS. |
| | ROW FEES FOR PAVEMENT OVERLAY WILL BE ASSESSED BY PALM |
| | BEACH COUNTY AT TIME OF ROW PERMIT. |
| | A QUOTATION FOR THE UTILITY METERS FROM THE CITY WILL |
| | BE SUPPLIED. THE QUOTE IS VALID UNTIL OCTOBER 1, 2015. |
| | |