| 2013-06-05 07:49:59 | PROVISOS: |
| | |
| | #1 FIRELINE CONNECTION IS APPROVED WITH THE CONDITION |
| | THAT IF IT IS NOT FEASIBLE TO CONNECT TO EXISTING |
| | FIRELINE STUB THEN A NEW TAP MUST BE MADE AT MAIN. |
| | |
| | #2 FOR CONSTRUCTION PLEASE ADD CITY OF WPB STANDARD |
| | DETAILS - FOR SIDEWALKS, CURB, PRESSURE PIPE RESTRAINT, |
| | WATER METER WS-1, |
| | |
| | #3 OWNER WILL NEED TO GRANT THE CITY A SIDEWALK |
| | EASEMENT ALONG BANYAN BLVD. (CONTACT VINCENT NOEL, CITY |
| | PROPERTY MANAGER (561) 494-1096) |
| | |
| | #4 PLEASE PROVIDE A 6" CURB ALONG YOUR WEST AND EAST |
| | PROPERTY LINE. LANDSCAPE AREAS MUST BE CONTAINED. |
| | |
| | #5 CONTRACTOR FOR THE PROJECT MUST OBTAIN A |
| | RIGHT-OF-WAY PERMIT TO PERFORM UTILITY WORK / SIDEWALK |
| | / DRIVEWAYS / ALLEYWORK. |
| | (LIMITS OF PAVEMENT REPLACEMENT WILL BE IMPOSED BY THE |
| | RIGHT-OF-WAY PERMIT CONDITIONS.) |
| | |
| | #6 PUBLIC FIRE HYDRANT SERVING FDC MAY NEED |
| | REPLACEMENT. THIS WILL BE DETERMINED BY CITY OF WPB |
| | OPERATIONS AND MAINTENANCE DEPT. |
| | |
| | #7 ZONING CONDITIONS MUST BE MET PRIOR TO PERMIT |
| | CLOSURE. |
| | |
| | #8 AS-BUILTS AND ENGINEER-OF-RECORD CERTIFICATION WILL |
| | BE REQUIRED PRIOR TO C.O. |
| | |
| | #9 ADA PATH TO ALLEY SHOULD BE SIGNED TO ADVICE OF |
| | ALLEY TRAFFIC. IT SHOULD ALSO PROVIDE A FLAT 5' X 5' |
| | LANDING AREA. AREA MUST BE PROPERLY LIGHTED. |
| | |
| | #10 ONCE METER AND FIRELINE VALVES ARE INSTALLED |
| | PROVIDE A SKETCH AND LEGAL FOR EASEMENT TO THE CITY OF |
| | WEST PALM BEACH. |
| | |
| | MANUEL JULIAN GONZALEZ |
| | ENGINEERING PROJECT COORDINATOR |
| | ENGINEERING SERVICES AND PUBLIC WORKS DEPARTMENT |
| | 401 CLEMATIS STREET, 4TH FLOOR |
| | WEST PALM BEACH, FL 33401 |
| | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) |
| | MAIN PHONE: (561) 822-1200 |
| | DIRECT: (561) 494-1085 |
| | FAX: (561) 494-1116 |
| | MOBILE: (561) 644-7301 |
| | EMAIL: [email protected] |
| | WWW.WPB.ORG/ENGINEERING |
| | |
| | |
| | |
| | |
| | |
| | |