Plan Review Details - Project E12080024
| Plan Review Stops For Project E12080024 |
| Review Stop |
ENG-A |
ENGINEERING FORMAL REVIEW |
| Rev No |
1 |
Status |
P |
Date |
11-05-2012 |
|
|
Cont ID |
|
| Sent By |
mgonzale |
Date |
11-05-2012 |
Time |
|
Rev Time |
24.00 |
| Received By |
mgonzale |
Date |
09-04-2012 |
Time |
|
Sent To |
Z |
|
| Notes |
| 2012-11-05 16:13:35 | PLANS ARE APPROVED AS-NOTED. | | | | | | #1 SHOW FDC LOCATION ON AS-BUILT (MUST BE NO MORE THAN | | | 150' FROM EXISTING FIRE HYDRANT) | | | #2 DUMPSTER(S) ON PLAN VIEW MUST HAVE OPENING OF 12'-6" | | | #3 USE DUCTILE IRON PIPE MATERIAL ON CITY OF WPB | | | PORTION ON INSTALL. | | | | | | MANUEL JULIAN GONZALEZ | | | ENGINEERING PROJECT COORDINATOR | | | ENGINEERING SERVICES DEPARTMENT | | | 401 CLEMATIS STREET, 4TH FLOOR | | | WEST PALM BEACH, FL 33401 | | | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) | | | MAIN PHONE: (561) 822-1200 | | | DIRECT: (561) 494-1085 | | | FAX: (561) 494-1116 | | | MOBILE: (561) 644-7301 | | | EMAIL: [email protected] | | | WWW.WPB.ORG/ENGINEERING | | | |
|
|
| Review Stop |
ENG-D |
ENGINEERING DEFICIENCY REVIEW |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ENG-E |
ENGINEERING ENVR. MIT. REVIEW |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ENG-F |
ENGINEERING FINAL DRAWING REV |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ENG-M |
ENGINEERING MODIFICATION REV |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ENG-P |
ENGINEERING PLANNING REVIEW |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ENG-T |
ENGINEERING TRAFFIC STUDY REV |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
P |
Date |
12-03-2012 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
12-03-2012 |
Time |
17:53 |
Rev Time |
1.00 |
| Received By |
eschneid |
Date |
12-03-2012 |
Time |
17:53 |
Sent To |
|
|
| Notes |
| 2012-12-03 18:01:19 | PASSED W/PROVISO | | | | | | 1) PROVIDE A BICYCLE PAD, WITH ONE BICYCLE RACK, ON | | | SITE THAT IS SIX (6) FEET DEEP BY FOUR (4) FEET WIDE. | | | THE BICYCLE RACK SHALL BE A POST AND LOOP, INVERTED U | | | OR SIMILAR STYLE. WAVE STYLE IS NOT PERMITTED. THE PAD | | | SHALL BE LOCATED IN A CONVENIENT, HIGHLY VISIBLE, | | | ACTIVE, WELL LIGHTED AREA. | | | | | | 2) A SEPARATE PARKING LOT STRIPING PERMIT IS REQUIRED | | | TO BE SUBMITTED TO THE BUILDING DEPARTMENT. | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
11-26-2012 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
11-26-2012 |
Time |
10:51 |
Rev Time |
0.50 |
| Received By |
eschneid |
Date |
11-26-2012 |
Time |
10:51 |
Sent To |
|
|
| Notes |
| 2012-11-26 11:04:36 | FAILED | | | | | | 1) PROVIDE DIMENSION LINES ON THE PAVING PLAN FOR THE | | | ENTIRE LENGTH OF EACH PARKING BAY, THE DRIVEWAY | | | CONNECTIONS, THE DRIVE AILSES AND THE LOADING AREAS TO | | | ENSURE THAT THE CURBS ARE POURED IN THE CORRECT | | | LOCATIONS. | | | | | | 2) THE PARKING STALL DETAIL INCORRECTLY SHOWS REGULAR | | | PARKING SPACES AT A MINIMUM OF EIGHT (8) FEET IN WIDTH, | | | YET WEST PALM BEACH REQUIRES SPACES TO BE A MINIMUM OF | | | 8.5 FEET IN WIDTH (PARKING SPACES ON PLAN SCALE AT 8.5 | | | FEET WIDE). | | | | | | 3) THE PARKING STALL DETAIL ALSO FAILS TO SHOW A WHEEL | | | STOP FOR THE REGULAR PARKING SPACE, WHICH WILL BE | | | REQUIRED TO PROTECT THE LANDSCAPE AT THE HEAD OF THE | | | SPACES IN THE TWO OUTER PARKING ROWS. | | | | | | 4) A SEPARATE STRIPING PERMIT WILL BE REQUIRED TO BE | | | SUBMITTED TO THE CITY'S BUILDING DEPARTMENT. | | | | | | CONTACT ERIC SCHNEIDER @ (561) 822-1446. |
|
|
| |