|
 |
 |
 |
 |
 |
Plan Review Details - Project E12080007
| Plan Review Stops For Project E12080007 |
| Review Stop |
ENG-A |
ENGINEERING FORMAL REVIEW |
| Rev No |
2 |
Status |
P |
Date |
11-09-2012 |
|
|
Cont ID |
|
| Sent By |
mgonzale |
Date |
11-09-2012 |
Time |
|
Rev Time |
4.00 |
| Received By |
mgonzale |
Date |
10-09-2012 |
Time |
|
Sent To |
|
|
| Notes |
| 2012-11-09 16:12:49 | JURISDICTIONAL PLAN REVIEW | | | | | | APPROVED AS-NOTED: EOR WILL CERTIFY WORK TO THE CITY OF | | | WEST PALM BEACH | | | | | | CALL 811 BEFORE YOUR DIGG. | | | | | | MANUEL JULIAN GONZALEZ | | | ENGINEERING PROJECT COORDINATOR | | | ENGINEERING SERVICES DEPARTMENT | | | 401 CLEMATIS STREET, 4TH FLOOR | | | WEST PALM BEACH, FL 33401 | | | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) | | | MAIN PHONE: (561) 822-1200 | | | DIRECT: (561) 494-1085 | | | FAX: (561) 494-1116 | | | MOBILE: (561) 644-7301 | | | EMAIL: [email protected] | | | WWW.WPB.ORG/ENGINEERING |
|
|
| Review Stop |
ENG-A |
ENGINEERING FORMAL REVIEW |
| Rev No |
1 |
Status |
F |
Date |
08-01-2012 |
|
|
Cont ID |
|
| Sent By |
mgonzale |
Date |
09-12-2012 |
Time |
|
Rev Time |
3.00 |
| Received By |
mgonzale |
Date |
07-31-2012 |
Time |
|
Sent To |
|
|
| Notes |
| 2012-09-12 11:09:54 | PLAN REQUIRES PD AMENDMENT | | | | | | DUMPSTER DO NOT MEET CITY MINIMUM DIMENSIONS | | | | | | PROPOSED CMU WALL REQUIRES REVISION AS ELEVATIONS | | | CONFLICT WITH EXISTING PROPOSED DRAINAGE. | | | | | | DRAINAGE ELEVATIONS NEED TO BE CHECKED AS PIPING COVER | | | MAY NOT BE ADEQUATE. |
|
|
| Review Stop |
ENG-D |
ENGINEERING DEFICIENCY REVIEW |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ENG-E |
ENGINEERING ENVR. MIT. REVIEW |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ENG-F |
ENGINEERING FINAL DRAWING REV |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ENG-M |
ENGINEERING MODIFICATION REV |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ENG-P |
ENGINEERING PLANNING REVIEW |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ENG-T |
ENGINEERING TRAFFIC STUDY REV |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| |
Print |
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |