Plan Review Details - Project E12050022
Plan Review Stops For Project E12050022
Review Stop ENG-A ENGINEERING FORMAL REVIEW
Rev No 1 Status P Date 06-26-2012 Cont ID  
Sent By mgonzale Date 07-10-2012 Time   Rev Time 1.00
Received By mgonzale Date 06-26-2012 Time 16:32 Sent To  
Notes
2012-07-10 12:05:41PLEASE FOLLOW PERMITTING REQUIREMENTS AS COMMENTED BY
 PLANNING DEPT.
  
 MANUEL JULIAN GONZALEZ
 ENGINEERING PROJECT COORDINATOR
 ENGINEERING SERVICES DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 MOBILE: (561) 644-7301
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  

Review Stop ENG-D ENGINEERING DEFICIENCY REVIEW
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-E ENGINEERING ENVR. MIT. REVIEW
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-F ENGINEERING FINAL DRAWING REV
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-M ENGINEERING MODIFICATION REV
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-P ENGINEERING PLANNING REVIEW
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-T ENGINEERING TRAFFIC STUDY REV
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 06-19-2012 Cont ID  
Sent By ajones Date 06-19-2012 Time 15:27 Rev Time 0.00
Received By ajones Date 06-19-2012 Time 15:27 Sent To  
Notes
2012-06-19 15:32:486/18/12- 1. PASSED WITH PROVISO THAT A SEPERATE PARKING
 LOT RESURFACING AND STRIPING PERMIT BE APPLIED FOR
 PRIOR TO THE FIRST INSPECTION.
 2. IF ANY LANDSCAPING IS BEING REMOVED, RELOCATED OR
 INSTALLED, SEPERATE PERMITS FROM THE PLANNING DIVISION
 ARE REQUIRED.
 3. WHERE ADDITIONAL PARKING SPACES ARE BEING ADDED THAT
 INCREASES THE PARKING SPACES TO MORE THAN 10 IN A ROW,
 A TERMINAL LANDSCAPE ISLAND IS REQUIRED. CONTACT ME FOR
 MORE DETAILS BEFORE YOU POUR THE CURBS.
  
 ANGELLA VANN
 561-822-1441
 [email protected]
  
  

  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved