Plan Review Details - Project E12050019
Plan Review Stops For Project E12050019
Review Stop ENG-A ENGINEERING FORMAL REVIEW
Rev No 1 Status P Date 05-23-2012 Cont ID  
Sent By mgonzale Date 05-23-2012 Time   Rev Time 8.00
Received By mgonzale Date 04-26-2012 Time   Sent To  
Notes
***NONE***

Review Stop ENG-D ENGINEERING DEFICIENCY REVIEW
Rev No 1 Status F Date 05-30-2012 Cont ID  
Sent By mgonzale Date 05-30-2012 Time   Rev Time 1.00
Received By mgonzale Date 05-30-2012 Time   Sent To  
Notes
2012-05-30 08:10:26STORMWATER COMMENTS: PLEASE RESPOND IN WRITING.
  
 I REVIEWED THE DRAINAGE CALCULATIONS AND DESIGN PLANS
 FOR THE SUBJECT PROJECT AND OFFER THESE COMMENTS:
 1. DRAINAGE CALCULATIONS DO NOT LIST THE EXISTING LAND
 USES (PAVEMENT, LAKE, PERVIOUS, ETC.). A PORTION OF THE
 LAKE IS BEING FILLED BUT THE POST-DEVELOPMENT PEAK
 STAGES AND PEAK DISCHARGE RATES ARE LESS THAN THE
 REPORTED EXISTING PEAK STAGES AND PEAK DISCHARGE RATES.
 2. IN THE CASCADE MODEL, GROUND STORAGE IS LISTED AS
 3.75 INCHES COMPARED TO THE CALCULATED SOIL STORAGE OF
 3.55 INCHES. CORRECTING THIS IN THE CASCADE MODEL WILL
 HAVE A NEGLIGIBLE IMPACT ON THE RESULTS.
 3. MATCH LINES ON SHEETS PD-3 AND PD-4 MISLABELED.
 4. WHAT IS THE PURPOSE OF THE ROCK TRENCH? THE PIPE
 INVERT ELEVATIONS FOR THE 15" PHDPE ARE BELOW THE
 CONTROL ELEVATION OF THE LAKE CONTROL STRUCTURE. THESE
 PIPES WILL BE NEARLY HALF FULL OF WATER MOST OF THE
 TIME.
 5. THE PROPOSED LAKE BANK AT THE NORTHWEST CORNER OF
 THE SOCCER/LACROSSE/FOOTBALL FIELD APPEARS TO HAVE A
 SLOPE OF 3:1 (TOP OF BANK ELEVATION = 17.60 FT NGVD;
 WATER ELEVATION = 14.39 FT NGVD; HORIZONTAL DISTANCE =
 10'+/-).
 6. THERE DOESN'T APPEAR TO BE A PERIMETER BERM AT
 ELEVATION 18.5 FT NGVD ALONG THE WEST AND SOUTH
 BOUNDARIES.
 7. A FEW OF THE NOTES ON SHEET PD-5 REFERENCE VILLAGE
 OF WELLINGTON.
  
 TRACY L. WARD, P.E.
 SENIOR STORMWATER ENGINEER
 CITY OF WEST PALM BEACH
 ENGINEERING SERVICES DIVISION
 401 CLEMATIS ST., 4TH FLOOR
 WEST PALM BEACH, FL 33401
 PHONE: 561-494-1120
 FAX: 561-494-1116

Review Stop ENG-E ENGINEERING ENVR. MIT. REVIEW
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-F ENGINEERING FINAL DRAWING REV
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-M ENGINEERING MODIFICATION REV
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-P ENGINEERING PLANNING REVIEW
Rev No 1 Status P Date 05-23-2012 Cont ID  
Sent By mgonzale Date 05-23-2012 Time   Rev Time 1.00
Received By mgonzale Date 05-23-2012 Time   Sent To  
Notes
2012-05-23 11:38:36REVIEWED PLAN WITH ALEX HANSEN, CITY OF WPB PLANNING
 DEPT.
 ALL PHASE I APPEARS TO BE AS PER APPROVED SITE PLANS.

Review Stop ENG-T ENGINEERING TRAFFIC STUDY REV
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***