| 2012-03-15 13:33:59 | RE: PBC 12" WATERMAIN, PARALLEL WEST SIDE OF MILITARY |
| | TRAIL ROW, INSIDE 10' UTILITY EASEMENT WITH A 1 1/2" |
| | SERVICE TO OXBRIDGE ACADEMY ATHLETIC FIELDS 3151 NORTH |
| | MILITARY TRAIL, WEST PALM BEACH, FL 33409 |
| | |
| | PLANS ARE APPROVED AS_NOTED. 03/15/2012 |
| | |
| | #1 WATERMAIN WORK MUST REMAIN INSIDE EASEMENT AND NOT |
| | INTO THE MILITARY TRAIL ROW AS THIS ROW FALLS WITHIN |
| | THE JURISDICTION OF FLORIDA DEPARTMENT OF |
| | TRANSPORTATION. |
| | |
| | #2 HAVING MET WITH WESLEY JOLIN, FIRE PROTECTION |
| | ENGINEER, CITY OF WEST PALM BEACH FIRE DEPARTMENT 500 |
| | NORTH DIXIE HWY ,WEST PALM BEACH, FL 33401 PHONE: (561) |
| | 804-4700 EXT: 6730 FAX: (561) 804-4774 E-MAIL: |
| | [email protected], IT WAS UNDERSTOOD THAT HYDRANTS ALONG |
| | THIS ALIGNMENT WILL BE USED PRIMARILY BY THE CITY OF |
| | WEST PALM BEACH, HAVING SAID THIS MR. JOLIN WOULD |
| | STRONGLY RECOMMEND THAT HYDRANTS CONFORM TO CITY OF |
| | WEST PALM BEACH STANDARDS - PLEASE SEE ATTACHED CITY OF |
| | WPB HYDRANT DETAIL SPECIFICATION AND APPROVED PRODUCT |
| | FOR SUCH COMPONENTS. |
| | |
| | FIRE HYDRANTS APPROVED FOR USE: |
| | HYDRANTS SHALL CONFORM TO THE REQUIREMENTS OF AWWA |
| | STANDARD C502-94 FOR DRY BARREL HYDRANTS, OR THE LATEST |
| | REVISION, AS TO THE DESIGN, COMPONENT MATERIALS, |
| | CONSTRUCTION AND MANUFACTURE, EXCEPT ASMODIFIED OR |
| | NOTED IN THE CITY TECHNICAL SPECIFICATIONS. APPROVED |
| | HYDRANTS SHALL BE USED IN THE CONSTRUCTION OF SYSTEMS |
| | TO BE OWNED AND OPERATED BY THE CITY OF WEST PALM BEACH |
| | PUBLIC UTILITIES DEPARTMENT. |
| | |
| | APPROVED HYDRANTS SHALL BE USED IN THE CONSTRUCTION OF |
| | PRIVATE SYSTEMS WITH IN THE CORPORATE BOUNDARIES OF THE |
| | CITY OF |
| | WEST PALM BEACH. |
| | ____ CLOW MEDALLION ____ AMERICAN B-84-B ____ MUELLER |
| | SUPER CENTURION 250 ____ KENNEDY GUARDIAN |
| | |
| | HYDRANT COATINGS: |
| | WHEN CONSTRUCTED TO THE CITY OF WEST PALM BEACH |
| | TECHNICAL SPECIFICATIONS, HYDRANTS SHALL HAVE A SHOP |
| | COAT OF SILVER |
| | PAINT APPLIED DURING THE MANUFACTURER. CONTRACTORS |
| | SHALL PAINT THE HYDRANT BONNET WITH THE FOLLOWING |
| | COATING AFTER |
| | INSTALLATION AND PRIOR TO ACCEPTANCE. CONTRACTORS SHALL |
| | CLEAN, PREP, AND PAINT ALL DAMAGED FACTORY PAINT. |
| | |
| | PAINT FOR FIRE HYDRANT BONNET. (REQUIRED) |
| | AXON AEROSPACE, INC.: ALERT SERIES LIGHT REFLECTIVE |
| | COATING. DISTRIBUTED BY J. D. L. INDUSTRIES, INC. |
| | |
| | PAINT FOR BARREL SECTION AND NOZZLE CAPS. (TOUCH-UP |
| | PAINT) |
| | SHERMAN-WILLIAMS: SILVER-BRITE ALUMINUM PAINT. TWO |
| | NUMBERS ON THE CAN ARE B59-511 AND 631-1336 |
| | |
| | MISCELLANEOUS COLORS: |
| | HYDRANTS INSTALLED OUTSIDE THE CITY OF WEST PALM BEACH |
| | CORPORATE BOUNDARIES, MAY BE PAINTED ALTERNATE COLORS. |
| | A |
| | LETTERHEAD CORRESPONDENCE FROM THE FIRE CHIEF OR FIRE |
| | MARSHAL OF THE CORRESPONDING SERVICE AREA (TOWN OF PALM |
| | BEACH, TOWN OF SOUTH PALM BEACH, AND UNINCORPORATED |
| | PALM BEACH COUNTY) MAY REQUEST PERMISSION TO PAINT THE |
| | BARREL SECTION ANY ALTERNATE COLOR. AN ORIGINAL COPY OF |
| | THE REQUEST SHALL ACCOMPANY THE AML SUBMITTAL. THE |
| | REFLECTIVE |
| | BONNET PAINT COLOR CAN NOT BE CHANGED. |
| | PROPOSED COLOR: _____________________________ |
| | MANUFACTURER: ______________________________ |
| | PAINT COLOR NO.: _____________________________ |
| | |
| | #3 WATERMAIN WILL REQUIRE A PERMIT THRU PALM BEACH |
| | COUNTY HEALTH DEPARTMENT. |
| | |
| | #4 NOTIFICATION TO THE CITY OF WEST PALM BEACH SHALL BE |
| | GIVEN AT THE TIME OF FINAL WALK THRU SO THAT A COPY OF |
| | THE AS-BUILTS BE SUPPLIED AND THESE HYDRANTS BE SHOWN |
| | ON OUR SYSTEM TO MAKE AVAILABLE TO FIRST RESPONDERS. |
| | |
| | #5 CONTRACTOR MUST COORDINATE ANY TREE REMOVAL AND OR |
| | TREE RELOCATIONS THRU THE CITY'S PLANNING DEPARTMENT. |
| | CONTRACTOR MUST OBTAIN ALL PROPER PERMITS AS REQUIRED. |
| | ANY NEW LANDSCAPE MUST BE PERMITTED THRU CITY OF WEST |
| | PALM BEACH CONSTRUCTION SERVICES DEPARTMENT. |
| | |
| | THIS JURISDICTIONAL REVIEW INCLUDES SOLELY THE |
| | INSTALLATION OF THE PROPOSED WATERMAIN. ALL SITE |
| | DEMOLITION AND SITE DEVELOPMENT INFRASTRUCTURE WILL BE |
| | REVIEWED THRU A DEVELOPMENT PERMIT AS SUBMITTED BY |
| | OXBRIDGE ACADEMY / JEWISH COMMUNITY CENTER PROJECT TO |
| | CITY OF WEST PALM BEACH, ENGINEERING SERVICES |
| | DEPARTMENT ON 03/15/2012. |
| | |
| | MANUEL J GONZALEZ |
| | UTILITIES ENGINEERING PROJECT COORDINATOR |
| | ENGINEERING SERVICES DEPARTMENT |
| | 401 CLEMATIS STREET, 4TH FLOOR |
| | WEST PALM BEACH, FL 33401 |
| | PHONE: 494-1040 EXT: 1085 |
| | FAX: 494-1116 |
| | E-MAIL: [email protected] |
| | |
| | CC. |
| | HEDRICK BROTHERS CONSTRUCTION CO., INC |
| | 2200 CENTREPARK WEST DRIVE, SUITE 100 |
| | WEST PALM BEACH, FL 33409 |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |