| 2012-03-12 09:09:04 | MARCH 3, 2012 |
| | |
| | MR. GLENN AND/OR RITA WELLER |
| | 12557 EQUINE LANE |
| | WELLINGTON, FL 33414 |
| | |
| | RE: SERVICE AVAILABILITY FOR: N.W. CORNER OF PARKER |
| | AVE. & SOUTHERN BLVD. |
| | PCN: 74434333060010010 ADDRESS: 901 SOUTHERN BLVD |
| | WEST PALM BEACH, PALM BEACH COUNTY, FLORIDA |
| | |
| | DEAR MR. WELLER AND/OR MRS. WELLER, |
| | |
| | IN RESPONSE TO YOUR REQUEST FOR VERIFICATION OF SERVICE |
| | AVAILABILITY FOR THE SUBJECT AREA, PLEASE BE ADVISED OF |
| | THE FOLLOWING: |
| | WATER SERVICE: |
| | THE CITY HAS SUFFICIENT WATER PLANT CAPACITY TO SERVE |
| | THIS PROPERTY. DOMESTIC, FIRE AND IRRIGATION WATER |
| | SERVICE TO THE SUBJECT LOT DESCRIBED AREAS MUST BE |
| | DESIGNED AND INSTALLED AT THE DEVELOPER?S EXPENSE. |
| | WASTEWATER SERVICE: |
| | THE CITY HAS SUFFICIENT WASTEWATER PLANT CAPACITY TO |
| | SERVE THIS PROPERTY. SANITARY SEWER SERVICE FOR EACH OF |
| | THE DESCRIBED AREAS MUST BE DESIGNED AND INSTALLED AT |
| | THE DEVELOPER?S EXPENSE. |
| | STORM WATER: |
| | WE WILL REQUIRE THAT YOU RETAIN STORM WATER ON YOUR |
| | SITE TO MEET THE SOUTH FLORIDA WATER MANAGEMENT |
| | DISTRICT (SFWMD) CRITERIA AND OBTAIN PERMITS FROM THE |
| | PROPER DRAINAGE DISTRICT TO DISCHARGE STORM WATER INTO |
| | THEIR SYSTEM. |
| | SOLID WASTE COLLECTION: |
| | THE CITY WILL BE ABLE TO SUPPLY SOLID WASTE COLLECTION |
| | TO SERVE THIS PROPERTY. DUMPSTER AREA(S) MUST BE |
| | PROVIDED BY THE DEVELOPER PER CITY OF WEST PALM BEACH |
| | STANDARD. |
| | ROADWAYS: |
| | THE CITY HAS ADEQUATE ACCESS TO SERVE THIS PROPERTY. |
| | DRIVEWAY CONNECTIONS MUST BE DESIGNED AND INSTALLED AT |
| | THE DEVELOPER?S EXPENSE. ANY DRIVEWAY CONNECTIONS TO |
| | SOUTHERN BLVD MUST BE PERMITTED THRU FLORIDA DEPARTMENT |
| | OF TRANSPORTATION. |
| | |
| | THIS LETTER OF SERVICE AVAILABILITY DOES NOT GIVE |
| | APPROVAL OF THE DEVELOPMENT OR SERVICE CONNECTIONS. THE |
| | CITY OF WEST PALM BEACH ENGINEERING SERVICES DEPARTMENT |
| | STILL REQUIRES THE REVIEW AND APPROVAL OF THE PLANS FOR |
| | THE ACTUAL SERVICE CONNECTIONS TO BE MADE, AT THE |
| | OWNER?S EXPENSE. UPGRADE TO CITY INFRASTRUCTURE WILL BE |
| | A PERTINENT ITEM DISCUSSED AND DETERMINED AT THE TIME |
| | OF DESIGN. THE DEVELOPER WILL ASSUME ALL RIGHT-OF-WAY |
| | UTILITY IMPROVEMENTS AND UPGRADES ASSOCIATED WITH THIS |
| | PROJECT. THE APPLICABLE CAPACITY CHARGES, INSTALLATION |
| | CHARGES, DEPOSITS, AND OTHER NORMAL FEES CHARGED BY THE |
| | PUBLIC UTILITIES DEPARTMENT SHALL BE ASSESSED AT THE |
| | TIME OF REQUEST FOR PERMITS/REVIEW. |
| | THANK YOU FOR THE REQUEST AND INTEREST IN BEING SERVED |
| | BY THE CITY OF WEST PALM BEACH, PUBLIC UTILITIES |
| | DEPARTMENT. PLEASE FEEL FREE TO CONTACT US AT (561) |
| | 494-1040 REGARDING THIS OR ANY OTHER RELATED MATTER. |
| | |
| | SINCERELY, |
| | |
| | MANUEL GONZALEZ, PROJECT COORDINATOR |
| | CC: BRIAN M. MOREE, AICP |
| | |