Plan Review Details - Project E11060027
Plan Review Stops For Project E11060027
Review Stop ENG-A ENGINEERING FORMAL REVIEW
Rev No 1 Status F Date 06-28-2011 Cont ID  
Sent By mgonzale Date 06-28-2011 Time   Rev Time 2.00
Received By mgonzale Date 06-28-2011 Time   Sent To  
Notes
2011-06-28 12:13:4806/28/2011
  
 PLEASE SUBMIT THE FOLLOWING:
  
 #1 REVISE SUMMARY OF CONSTRUCTION TO INCLUDE:
 A. ESTIMATED # OF DAYS STORMWATER VENUE WILL BE OUT OF
 SERVICE. (# OF DAYS IT WILL BE BY-PASSED)
 B. STORM CALCULATION SUPPORTING CFS.
 C. AT WHAT POINT WILL THE STORM WILL BE BY-PASSED
  
 #2 BY-PASS SCHEMATIC DRAWING SHOWING
 A. BY-PASS PUMP LOCATION
 LOCATION AND PIPING.
 B. FLOW DIRECTIONS
 C. PUMP SPECS
  
 #3 IDENTIFY FPL ELECTRICAL CROSSING PROPOSED STORM.
 DUCT BANK? FLEX CABLE?
  
 #4 REVISE CONSTRUCTION COST ESTIMATE:
 A. ANY SHORING?
 B. ADD WATER SERVICE RELOCATION
 C. ADD LINE STOP FOR WATERMAIN
 D. REMOVE AS-BUILTS AND REMOVE DENSITIES/TESTING
 (THESE ITEMS ARE ALREADY FACTORED AS A PERCENTAGE IN
 THE SUBTOTALS SECTION.)
 PLEASE RESEND NEW COST ESTIMATE.
  
 #5 MOT AND ROW COMMENTS WHERE EMAILED 06/28/2011
 PLEASE REVIEW AND RESEND.
  
 MANUEL JULIAN GONZALEZ
 ENGINEERING PROJECT COORDINATOR
 ENGINEERING SERVICES DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 MOBILE: (561) 644-7301
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
  
  
  
  
  
  

Review Stop ENG-D ENGINEERING DEFICIENCY REVIEW
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-E ENGINEERING ENVR. MIT. REVIEW
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-F ENGINEERING FINAL DRAWING REV
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-M ENGINEERING MODIFICATION REV
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-P ENGINEERING PLANNING REVIEW
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-T ENGINEERING TRAFFIC STUDY REV
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***