Plan Review Details - Project E11020022
| Plan Review Stops For Project E11020022 |
| Review Stop |
ENG-A |
ENGINEERING FORMAL REVIEW |
| Rev No |
1 |
Status |
P |
Date |
03-11-2011 |
|
|
Cont ID |
|
| Sent By |
mgonzale |
Date |
03-11-2011 |
Time |
|
Rev Time |
4.00 |
| Received By |
mgonzale |
Date |
03-11-2011 |
Time |
|
Sent To |
|
|
| Notes |
| 2011-03-11 08:10:12 | PASSED WITH PROVISO | | | | | | #1 ADA TRUNCATED DOMES REQUIRED IN DETERIORATED | | | CONCRETE CROSSING AREAS | | | (INCLUDE ROW OF 7TH STREET | | | | | | #2 REPLACE OR REPLANT TREES IN PLANTERS THAT HAVE DIED | | | (7TH STREET) | | | | | | #3 DUMPSTER AREA MUST MEET MINIMUM SCREENING | | | REQUIREMENTS. | | | | | | #4 CONSTRUCTION CAUSING DAMAGE TO ALLEYWAYS WILL | | | TRIGGER ASPHALT OVERLAY. | | | | | | #5 ANY WATER SERVICES FOUND OFF ALLEYWAY MUST BE CAPPED | | | BACK AT MAIN. | | | | | | #6 PRIVATE HYDRANT MUST HAVE THE CLEARANCE REQUIRED TO | | | OPERATE (7.5' RADIUS AT NOZZLES AND 4.5' FROM BACK) | | | | | | ************************************** | | | | | | MANUEL JULIAN GONZALEZ | | | CSD ENGINEERING REVIEW | | | 401 CLEMATIS STREET | | | WEST PALM BEACH, FL 33401 | | | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) | | | MAIN PHONE: (561) 822-1200 | | | DIRECT: (561) 494-1085 | | | FAX: (561) 494-1116 | | | MOBILE: (561) 644-7301 | | | EMAIL: [email protected] | | | WWW.WPB.ORG/ENGINEERING | | | **************************************** | | | COST ESTIMATE WILL BE ADJUSTED DEDUCTING | | | MAINTENANCE OF TRAFFIC (6%) & | | | CLEARING AND GRUBBING (4%) | | | | | | |
|
|
| Review Stop |
ENG-D |
ENGINEERING DEFICIENCY REVIEW |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ENG-E |
ENGINEERING ENVR. MIT. REVIEW |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ENG-F |
ENGINEERING FINAL DRAWING REV |
| Rev No |
1 |
Status |
P |
Date |
07-19-2011 |
|
|
Cont ID |
|
| Sent By |
mgonzale |
Date |
07-19-2011 |
Time |
|
Rev Time |
1.00 |
| Received By |
mgonzale |
Date |
07-19-2011 |
Time |
|
Sent To |
|
|
| Notes |
| 2011-07-19 10:33:02 | VISITED SITE FOR FINAL INSPECTION AND PROJECT HAS | | | COMPLIED WITH ALL REQUIREMENTS UNDER ENGINEERING | | | SERVICES DEPARTMENT PERMIT E1102022. | | | TRAVIS HAWTHORN AND MYSELF VISITED THE SITE. AS-BUIT | | | SURVEY HAS BEEN RECEIVED AND WILL BE KEPT ON FILE. | | | | | | NOTIFICATION SENT TO KEN CONRAD, CONSTRUCTION SERVICES | | | DEPARTMENT. | | | | | | MANUEL JULIAN GONZALEZ | | | ENGINEERING PROJECT COORDINATOR | | | ENGINEERING SERVICES DEPARTMENT | | | 401 CLEMATIS STREET, 4TH FLOOR | | | WEST PALM BEACH, FL 33401 | | | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) | | | MAIN PHONE: (561) 822-1200 | | | DIRECT: (561) 494-1085 | | | FAX: (561) 494-1116 | | | MOBILE: (561) 644-7301 | | | EMAIL: [email protected] | | | WWW.WPB.ORG/ENGINEERING | | | | | | |
|
|
| Review Stop |
ENG-M |
ENGINEERING MODIFICATION REV |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ENG-P |
ENGINEERING PLANNING REVIEW |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ENG-T |
ENGINEERING TRAFFIC STUDY REV |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| |
Print |
|
Account Summary | Usage Policy | Privacy Policy