Plan Review Details - Project E11020022
Plan Review Stops For Project E11020022
Review Stop ENG-A ENGINEERING FORMAL REVIEW
Rev No 1 Status P Date 03-11-2011 Cont ID  
Sent By mgonzale Date 03-11-2011 Time   Rev Time 4.00
Received By mgonzale Date 03-11-2011 Time   Sent To  
Notes
2011-03-11 08:10:12PASSED WITH PROVISO
  
 #1 ADA TRUNCATED DOMES REQUIRED IN DETERIORATED
 CONCRETE CROSSING AREAS
 (INCLUDE ROW OF 7TH STREET
  
 #2 REPLACE OR REPLANT TREES IN PLANTERS THAT HAVE DIED
 (7TH STREET)
  
 #3 DUMPSTER AREA MUST MEET MINIMUM SCREENING
 REQUIREMENTS.
  
 #4 CONSTRUCTION CAUSING DAMAGE TO ALLEYWAYS WILL
 TRIGGER ASPHALT OVERLAY.
  
 #5 ANY WATER SERVICES FOUND OFF ALLEYWAY MUST BE CAPPED
 BACK AT MAIN.
  
 #6 PRIVATE HYDRANT MUST HAVE THE CLEARANCE REQUIRED TO
 OPERATE (7.5' RADIUS AT NOZZLES AND 4.5' FROM BACK)
  
 **************************************
  
 MANUEL JULIAN GONZALEZ
 CSD ENGINEERING REVIEW
 401 CLEMATIS STREET
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 MOBILE: (561) 644-7301
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
 ****************************************
 COST ESTIMATE WILL BE ADJUSTED DEDUCTING
 MAINTENANCE OF TRAFFIC (6%) &
 CLEARING AND GRUBBING (4%)
  
  

Review Stop ENG-D ENGINEERING DEFICIENCY REVIEW
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-E ENGINEERING ENVR. MIT. REVIEW
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-F ENGINEERING FINAL DRAWING REV
Rev No 1 Status P Date 07-19-2011 Cont ID  
Sent By mgonzale Date 07-19-2011 Time   Rev Time 1.00
Received By mgonzale Date 07-19-2011 Time   Sent To  
Notes
2011-07-19 10:33:02VISITED SITE FOR FINAL INSPECTION AND PROJECT HAS
 COMPLIED WITH ALL REQUIREMENTS UNDER ENGINEERING
 SERVICES DEPARTMENT PERMIT E1102022.
 TRAVIS HAWTHORN AND MYSELF VISITED THE SITE. AS-BUIT
 SURVEY HAS BEEN RECEIVED AND WILL BE KEPT ON FILE.
  
 NOTIFICATION SENT TO KEN CONRAD, CONSTRUCTION SERVICES
 DEPARTMENT.
  
 MANUEL JULIAN GONZALEZ
 ENGINEERING PROJECT COORDINATOR
 ENGINEERING SERVICES DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 MOBILE: (561) 644-7301
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
  

Review Stop ENG-M ENGINEERING MODIFICATION REV
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-P ENGINEERING PLANNING REVIEW
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-T ENGINEERING TRAFFIC STUDY REV
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved