Plan Review Details - Project E11020014
Plan Review Stops For Project E11020014
Review Stop ENG-A ENGINEERING FORMAL REVIEW
Rev No 1 Status P Date 05-13-2011 Cont ID  
Sent By mgonzale Date 05-13-2011 Time   Rev Time 4.00
Received By mgonzale Date 05-13-2011 Time   Sent To  
Notes
***NONE***

Review Stop ENG-D ENGINEERING DEFICIENCY REVIEW
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-E ENGINEERING ENVR. MIT. REVIEW
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-F ENGINEERING FINAL DRAWING REV
Rev No 1 Status P Date 06-24-2011 Cont ID  
Sent By mgonzale Date 06-24-2011 Time   Rev Time 3.00
Received By mgonzale Date 06-24-2011 Time   Sent To  
Notes
2011-07-19 12:46:46FINAL WALK THRU PERFORMED WITH JOSHUA MCDERMOTT CITY OF
 WPB CONSTRUCTION COORDINATOR
 SITE ACCEPTABLE, CUSTOMER SERVICE TO PROGRAM READING
 EQUIPMENT WAS SCHEDULED.
 AS-BUILTS WHERE ACCEPTABLE AND WHERE DISTRIBUTED.

Review Stop ENG-M ENGINEERING MODIFICATION REV
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-P ENGINEERING PLANNING REVIEW
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-T ENGINEERING TRAFFIC STUDY REV
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved