Plan Review Details - Project E11020003
Plan Review Stops For Project E11020003
Review Stop ENG-A ENGINEERING FORMAL REVIEW
Rev No 2 Status P Date 02-24-2011 Cont ID  
Sent By mgonzale Date 02-24-2011 Time 13:27 Rev Time 24.00
Received By mgonzale Date 02-18-2011 Time 13:27 Sent To  
Notes
2011-02-24 13:28:49PLANS HAVE BEEN APPROVED.
 PROJECT DOX USED FOR REVIEW.
 2 SETS RETURNED TO EOR TO FWD TO PB HEALTH DEPT.
  
  

Review Stop ENG-A ENGINEERING FORMAL REVIEW
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-D ENGINEERING DEFICIENCY REVIEW
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-E ENGINEERING ENVR. MIT. REVIEW
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-F ENGINEERING FINAL DRAWING REV
Rev No 1 Status P Date 04-22-2011 Cont ID  
Sent By mgonzale Date 04-22-2011 Time   Rev Time 1.00
Received By mgonzale Date 04-22-2011 Time   Sent To  
Notes
2011-04-22 08:18:09SHOP DWGS APPROVED AS- NOTED 04/22/2011
  
 PASSED PACKE TO CRAIG SANDT FOR ASSIGNEMENT AND
 CONSTRUCTION
 PLANS HAVE STAMPED DATE OF 02/23/2011
  
 MGONZALEZ
  
  

Review Stop ENG-M ENGINEERING MODIFICATION REV
Rev No 1 Status P Date 05-11-2011 Cont ID  
Sent By mgonzale Date 05-11-2011 Time   Rev Time 4.00
Received By mgonzale Date 05-11-2011 Time   Sent To  
Notes
2011-05-11 15:24:04WATER AND SEWER SHEET REVISION WAS DONE TO AVOID A
 CONFLICT.
 MODIFICATION REVIEW PASSED WITH THE FOLLOWING PROVISOS:
  
 #1 PLAN MUST BE APPROVED BY PALM BEACH COUNTY ROADWAY
 DEPT PRIOR TO CONSTRUCTION.
  
 #2 CONTRACTOR SHALL FOLLOW INSTRUCTION ON PLAN TO
 ENSURE WM IS RESTRAINT PROPERLY.
  
 #3 PALM BEACH COUNTY HEALTH DEPARMENT WILL ACCEPT
 CHANGE AND WILL REQUIRE AS-BUILT REVIEW PRIOR TO PBC
 HEALTH DEPT RELEASE.
  
 #4 ONCE PALM BEACH COUNTY ROADWAY APPROVES PLAN FOR THE
 WORK CONTACT CONSTRUCTION COORDINATOR - DAVID MCKENZIE
 (561) 644-7342
 SO THAT CONTRACTOR PROCEEDS TO SCHEDULE WORK. REMEMBER
 48 HOURS NOTICE IS THE MINIMUM ALLOWED TIME FOR
 SCHEDULING WORK WITH CWPB ENGINEERING.
  
 MANUEL JULIAN GONZALEZ
 ENGINEERING PROJECT COORDINATOR
 ENGINEERING SERVICES DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 MOBILE: (561) 644-7301
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
  
  

Review Stop ENG-P ENGINEERING PLANNING REVIEW
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-T ENGINEERING TRAFFIC STUDY REV
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved