| 2010-11-04 08:13:24 | PLAN REVIEW COMMENTS: 11/1/2010 |
| | WATER AND SEWER |
| | SHEET 3 OF 22 |
| | 1.WATER SERVICE TO LIFT STATION CROSSES FM AT TWO |
| | LOCATIONS. |
| | 2.WATER SERVICE TO BUILDING CROSSES DRAINAGE LINE. |
| | 3.WATER SERVICE CROSSES GRAVITY SEWER. |
| | 4.CALL OUT CITY OF WPB L.S. |
| | 5.SHOW F.F.E. FOR BUILDING. |
| | 6.WATER CROSSES DRAINAGE |
| | 7.POSSIBLE CONFLICT WITH PROPOSED CATCH BASIN AND |
| | PROPOSED SEWER. |
| | 8.CALL OUT 8" TAP AS 8"X8" TAPPING SLEEVE AND VALVE. |
| | 9. CHANGES 1-8 SHOULD ALSO REFLECT ON SHEET 4 OF 22. |
| | SHEET 4 OF 22 |
| | 10.SHOW EXISTING FM MANHOLE TO BE REHABILITATED. |
| | 11.EXISTING MANHOLE MISSING SOUTH INVERT AND EAST |
| | INVERT ELEVATION. |
| | 12.EXISTING SEWER MANHOLE TO BE REHABILITATED |
| | 13.EXISTING MANHOLE MISSING S.W. INVERT ELEVATION |
| | 14.IS LAST MANHOLE NEEDED? WHAT DOES IT SERVE? |
| | 15.IDENTIFY STORAGE BUILDINGS AND THEIR F.F.E. |
| | SHEET 5 OF 22 |
| | 16. SHOW INVERT ELEVATIONS OF EXISTING SEWER MANHOLE IN |
| | PARKER AVENUE. |
| | 17. SHOW DIMENSION MINIMUM SEPARATION BETWEEN WATER AND |
| | SEWER. |
| | 18. ADD CLEAN-OUTS EVERY 75 LINEAR FEET. |
| | 19. MH-12 DOES NOT SHOW WEST INVERT AND EAST INVERT |
| | ELEVATION DEFINED. |
| | 20. EXISTING SEWER PIPE DIAMETER AND MATERIAL IS NOT |
| | SHOWN. |
| | 21. WATER SERVICE CROSSES OVER DRAINAGE, SHOW CONFLICT |
| | ELEVATIONS. |
| | SHEET 6 OF 22 |
| | 22. MH-3 IS MISSING WEST ELEVATION AND EAST ELEVATION. |
| | 23. SHOW F.F.E. FOR 3 BUILDINGS. |
| | 24. MOVE PROPOSED VALVE CLOSER TO HYDRANT FOR THE EASE |
| | OF LOCATING. |
| | 25. EASEMENT LINE SHOWN BOLD AND SOLID, PLEASE CORRECT. |
| | 26. METER LOCATION NEEDS TO BE MORE ELABORATE DO TO A |
| | 4'X6' VAULT AREA REQUIRED FOR METER. SHOW DOMESTIC |
| | BACKFLOW LOCATION. |
| | METER WILL NEED TO BE SHOWN IN THE EASEMENT, BACKFLOW |
| | IS PRIVATE. |
| | 27. CALL OUT 4"X8" TEE. |
| | 28. SHOW ALL UTILITY CROSSING CONFLICTS. |
| | SHEET 7 OF 22 |
| | 29. SHOW INVERT ELEVATION OF EXISTING MANHOLE OR DELETE |
| | THE XX.XX |
| | SHEET 8 OF 22 |
| | 30. DESCRIBE THE ARV WILL BE IN A MANHOLE. |
| | 31. MH-7 SOUTH INVERT IS MISSING. |
| | 32. SHOW ALL CROSSINGS CONFLICTS WITH WATER. |
| | 33. ADD NOTE TO ADJUST TOP TO EXISTING ARV MANHOLE. |
| | 34. WM AND FM CONFLICT POINTS TO WRONG CROSSING |
| | 35. SHOW FFE ELEVATIONS TO BUILDINGS. |
| | SHEET 9 OF 22 |
| | 36. SHOW ALL UTILITY CROSSING CONFLICTS. |
| | 37. CALL OUT SIZE AND MATERIAL OF NEW SEWER PIPE YOU |
| | ARE CONNECTING TO EXISTING MANHOLE. |
| | 38. NOTE EXISTING MANHOLE TO BE REHABILITATED AS PER |
| | CITY OF WEST PALM BEACH SPEC. |
| | 39. PROVIDE EASEMENT AROUND FIRE HYDRANT ON-SITE. 5 |
| | FEET MINIMUM AROUND. |
| | 40. SHOE STREET NAMES HILLCREST AND PARKER. |
| | 41. SHOW F.F.E. OF EXISTING BUILDINGS. |
| | SHEET 10 OF 22 |
| | 42. SHOW EXISTING F.M. CROSSING PROPOSED FIRE HYDRANT. |
| | 43. CALL OUT SECTION A-A ON PLAN VIEW. |
| | 44. WM ELEVATION DEVIATION WILL REQUIRE A NEW ARV. |
| | 45. SHOW CROSS SECTION OF A-A WITH BENDS. |
| | 46. SHOW EXISTING SEWER MANHOLE TO CAP E. AND W. |
| | ELEVATION. |
| | SHEET 11 OF 22 |
| | 47. EXISTING MANHOLE IS MISSING SOUTH AND EAST INVERT |
| | ELEVATIONS. |
| | 48. EXISTING MANHOLE WILL NEED TO BE REHABILITATED AS |
| | PER CITY OF WEST PALM BEACH SPEC. |
| | 49. SHOW ALL UTILITY CROSSINGS. |
| | 50. PROPOSED WATERMAIN TO TIE INTO 16" DIP WATERMAIN |
| | WITH 8"X16" TAPPING VALVE AND SLEEVE. |
| | 51. EXISTING HYDRANT TO REMAIN. ADD EASEMENT AS NEEDED. |
| | 52. EXISTING 6" G.V. STUB TO BE RESTRAINT BACK TO MAIN. |
| | 53. EXISTING SANITARY SEWER MANHOLE ON PARKER SHOWS |
| | DUPLICATE INFORMATION. |
| | SHEET 12 OF 22 |
| | 54. SHOW ALL UTILITY CROSSINGS. |
| | 55. MH-13 SHOWS DUPLICATE INVERT INFORMATION. |
| | 56. ADD CLEAN-OUTS EVERY 75 LINEAR FEET. |
| | 57. SHOW BUILDING F.F.E. |
| | SHEET 13 OF 22 |
| | 58. SHOW BUILDING F.F.E. |
| | 59. ADD CLEAN-OUTS EVERY 75 LINEAR FEET |
| | 60. EXISTING MANHOLE WHERE NEW GRAVITY SEWER TIES IN |
| | NEED TO BE NOTED: TO BE REHABILITATED AS PER CITY OF |
| | WEST PALM BEACH SPEC. |
| | 61. TO WHAT MAIN IS SERVING EXISTING WATER SERVICE TO |
| | CITY LIFT STATION? WILL THAT SERVICE BE CAPPED AND |
| | WHERE? |
| | SHEET 15 OF 22 |
| | 62. SHOW EXISTING WATERMAIN STUB TO BE CUT BACK AND |
| | RETRAIN. |
| | 63. ADJUST WATER AND SEWER PROFILES PER PLAN COMMENTS. |
| | |
| | PLAN REVIEW COMMENTS: 11/1/2010 |
| | PAVING AND DRAINAGE |
| | SHEET 4 OF 20 |
| | 1. PROPOSED ACCESS TO WPB LIFT STATION SHALL BE |
| | CONCRETE. |
| | SHEET 5 OF 20 |
| | 2. TRUNCATED DOMES REQUIRED AT ALL STREET CROSSING AND |
| | ALL ADA LOCATIONS. |
| | SHEET 6 OF 20 |
| | 3. H.C. RAMPS MISSING AT TWO SOUTHERN H.C. PARKING |
| | LOCATION. |
| | 4. NOTE: NEW DRIVEWAYS PER CITY OF WEST PALM BEACH |
| | STANDARD (CONCRETE APPROACH)(ADA RAMPS WITH 2 FEET WIDE |
| | TRUNCATED DOME PADS) |
| | 5. MODIFY EXISTING CATCH BASIN TOP TO CORRECT ALIGNMENT |
| | OF PARKER AVENUE. UNEVEN CURB IS A HAZARD TO DRIVERS. |
| | 6. THERE ARE ATLEAST 5 CONCRETE DRIVEWAY APRONS THAT |
| | NEED REMOVAL. YOU MAY SUMMARIZE IN A NOTE TO CONTRACTOR |
| | TO REPLACE APRONS (12 FEET WIDE +/-) WITH NEW SIDEWALK, |
| | GREEN AREA AND CURB. |
| | 7. NEW ENTRANCE DRIVE TO PARK DOES NOT ALIGN WITH |
| | RIDGEWOOD AVENUE CENTERLINE. CAN WE GET A BETTER |
| | ALIGNMENT ON THIS? |
| | SHEET 7 OF 20 |
| | 8. TRUNCATED DOMES REQUIRED AT ALL STREET CROSSING AND |
| | ALL ADA LOCATIONS. |
| | 9. REVIEW H.C. RAMP ALIGNMENT AT ROAD CROSSING. RAMP |
| | CANNOT LEAD TO A CURB. |
| | 10. CROSSING TEXT BLOCKED BY ELEVATION. |
| | SHEET 8 OF 20 |
| | 11. TYPICAL RESTORATION DETAIL IS NOT SHOWN. |
| | 12. 2 BRICK CATCH BASINS WILL NEED MODIFIED TOPS TO |
| | ALIGN WITH NEW TYPE 'D' CURB ALONG PARKER AVENUE. |
| | 13. PIPE INVERT ELEVATIONS ARE MISSING FROM STORM |
| | PIPES. |
| | SHEET 9 OF 20 |
| | 14. HANDICAP PARKING DOES NOT SHOWN RAMPS OR ADA PATH. |
| | 15. CROSSWALKS ARE NOT IDENTIFIED WITH ADA RAMPS OR |
| | TRUNCATED DOMES (SEE MARK-UP FOR LOCATIONS). |
| | SHEET 10 OF 20 |
| | 16. NO SIGNAGE PLANS WHERE INCLUDED WITH SUBMITTAL. |
| | INTERSECTION AT HILLCREST WILL NEED SIGNAGE AND |
| | CROSSWALK STRIPING. PAINT SHALL BE THERMOPLASTIC. |
| | 17. INCLUDE STANDARD NOTE FOR THE REMOVAL OF DRIVEWAY |
| | APPROACHES ALONG PARKER AVENUE AND REPLACE WITH |
| | SIDEWALK AND CURB. |
| | 18. SHOW AREA TO MILL AND OVERLAY, HILLCREST BLVD AND |
| | PARKER AVENUE, INTERSECTION TRANSITION OF PAVEMENT FROM |
| | CENTERLINE OF PARKER AVENUE TO EDGE OF PAVEMENT OF |
| | PARKER AVE (APPROXIMATE AREA 50 FEET NORTH AND 50 FEET |
| | SOUTH FROM CENTERLINE). |
| | SHEET 11 OF 20 |
| | 19. SECTION DD IS SHOWN ON PLAN VIEW HOWEVER NOT SHOWN |
| | ANYWHERE IN PROFILE. |
| | SHEET 12 OF 20 |
| | 20. SECTION AA, BB, CC ARE SHOWN ON PLAN VIEW HOWEVER |
| | NOT SHOWN ANYWHERE IN PROFILE. |
| | 21. INCLUDE STANDARD NOTE FOR THE REMOVAL OF DRIVEWAY |
| | APPROACHES ALONG PARKER AVENUE AND REPLACE WITH |
| | SIDEWALK AND CURB. |
| | SHEET 16 OF 20 |
| | 22. SECTION EE AND FF ARE SHOWN ON PLAN VIEW HOWEVER |
| | NOT SHOWN ANYWHERE IN PROFILE. |
| | SHEET 19 OF 20 |
| | 23. CORRECT STREET NAME AT EL PRADO INTERSECTION (FROM |
| | AVENIDA HERMOSA TO EL PRADO) |
| | 24. SHOW VIEW OF INTERSECTION OF EL VEDADO AND PARKER |
| | AVENUE. |
| | 25. CATCH BASIN MODIFICATION ALONG PARKKER AVENUE WILL |
| | BE REQUIRED. INCLUDE A MODIFIED TOP TO ADJUST TO NEW |
| | ROAD CURB ALIGNMENT |
| | THOSE NOT BEING ABLE TO MODIFY PROVIDE NEW STRUCTURES |
| | AS NECESSARY. |
| | 26. EVALUATE LOCUST ST AND EL PRADO, MILL AND OVERLAY |
| | AREA TO CORRECT THE EXISTING PRONOUNCED CROWNING. |
| | |
| | MANUEL JULIAN GONZALEZ |
| | ENGINEERING PROJECT COORDINATOR |
| | ENGINEERING SERVICES DEPARTMENT |
| | 401 CLEMATIS STREET, 4TH FLOOR |
| | WEST PALM BEACH, FL 33401 |
| | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) |
| | MAIN PHONE: (561) 822-1200 |
| | DIRECT: (561) 494-1085 |
| | FAX: (561) 494-1116 |