| 2010-11-03 08:50:35 | 11/03/2010 |
| | SPOKE TO KUSHALA GOWDA - MALCOLM-PIRNIE 1-954-414-9001 |
| | UTILITY JURISDICTION PERMITTING REVIEW |
| | AMOUNT PAID $515.00 TO CITY OF WPB ESD |
| | |
| | PROPOSED PPP AND CONSTRUCTION SEQUENCE PLAN ON-FILE. |
| | |
| | MANUEL JULIAN GONZALEZ |
| | ENGINEERING PROJECT COORDINATOR |
| | ENGINEERING SERVICES DEPARTMENT |
| | 401 CLEMATIS STREET, 4TH FLOOR |
| | WEST PALM BEACH, FL 33401 |
| | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) |
| | MAIN PHONE: (561) 822-1200 |
| | DIRECT: (561) 494-1085 |
| | FAX: (561) 494-1116 |
| | MOBILE: (561) 644-7301 |
| | EMAIL: [email protected] |
| | WWW.WPB.ORG/ENGINEERING |
| | |
| 2010-11-01 09:02:31 | PASSED WITH PROVISOS: |
| | |
| | STORMWATER POLLUTION PREVENTION PLAN |
| | A NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM |
| | (NPDES) STORMWATER PERMIT IS REQUIRED FOR YOUR SITE |
| | UNDER RULE 62-621.300(7) (A) OF THE FLORIDA |
| | ADMINISTRATIVE CODE (F.A.C.). A COPY OF THIS PERMIT |
| | REQUIREMENTS AND FURTHER INFORMATION CAN BE FOUND AT |
| | THE FDEP WEBSITE |
| | (WWW.DEP.STATE.FL.US/WATER/STORMWATER/NPDES). |
| | HTTP://WWW.DEP.STATE.FL.US/WATER/STORMWATER/NPDES/DOCS/ |
| | SWPPPTEMPLATE.PDF |
| | |
| | IN ORDER TO PROVIDE CONSISTENCY IN THE PREPARATION, |
| | REVIEW AND IMPLEMENTATION OF A SWPPP, PLEASE REVIEW THE |
| | FOLLOWING ITEMS. |
| | THESE COMMENTS WILL BE PART OF YOUR PROJECT COMPLIANCE |
| | WITH THE REQUIREMENTS OF THE FLORIDA STATUTE THAT |
| | GOVERNS THE PERMIT. |
| | |
| | THE DESIGN ENGINEER SHOULD INCLUDE THE FOLLOWING: |
| | SEQUENCE OF SOIL DISTURBING ACTIVITIES |
| | 1.THE INTENDED SEQUENCE OF THE SOIL DISTURBING |
| | ACTIVITIES WITH DESCRIPTION OF EACH SOIL DISTURBING |
| | ACTIVITIES |
| | 2. FOR THIS SECTION, PROVIDE THE PHASING OF |
| | CONSTRUCTION. IN THE EVENT THE CONTRACTOR CHANGES IT, |
| | THE CONTRACTOR WILL BE RESPONSIBLE FOR UPDATING THIS |
| | SECTION AS WELL. |
| | |
| | STABILIZATION |
| | THERE ARE TWO TYPES OF STABILIZATION PRACTICES THAT |
| | SHOULD BE ADDRESSED: |
| | 1. TEMPORARY STABILIZATION - SHOULD BE USED WHEN AN |
| | AREA IS GOING TO BE REWORKED SEVERAL TIMES DURING THE |
| | LIFE OF THE CONSTRUCTION PROJECT. |
| | 2. PERMANENT STABILIZATION - SHOULD BE IDENTIFY THE |
| | METHOD THAT WILL BE USED TO STABILIZE ALL AREAS WITHIN |
| | THE PROJECT LIMITS THAT WERE CLEARED AND GRUBBED AT THE |
| | START OF CONSTRUCTION. |
| | |
| | OFF-SITE VEHICLE TRACKING AND DUST CONTROL |
| | 1. THE CONTRACTOR SHALL TAKE MEASURES TO INSURE THE |
| | CLEANUP OF SEDIMENTS THAT HAVE BEEN TRACKED BY VEHICLES |
| | OR HAVE BEEN TRANSPORTED BY WIND OR STORMWATER ABOUT |
| | THE SITE OR ONTO NEARBY ROADWAYS. |
| | 2. YOUR EROSION CONTROL DETAILS DO NOT SHOW A |
| | STABILIZED CONSTRUCTION ENTRANCE OR WASH-DOWN AREA |
| | DETAIL. THIS SHALL BE IMPLEMENTED IN ORDER TO REDUCE |
| | OFF-SITE TRACKING. |
| | 3. LOADED HAUL TRUCKS SHALL BE COVERED WITH TARPAULIN. |
| | EXCESS DIRT ON THE ROAD SHALL BE REMOVED DAILY. |
| | 4. PROVIDE LOCATIONS WHERE VEHICLES ENTER OR EXIT THE |
| | SITE. |
| | 5. THE CONTRACTOR SHALL INITIATE REPAIRS WITHIN 24 |
| | HOURS OF INSPECTIONS THAT INDICATE ITEMS ARE NOT IN |
| | GOOD WORKING ORDER. |
| | 6. IF INSPECTIONS INDICATE THAT THE INSTALLED |
| | STABILIZATION AND STRUCTURAL PRACTICES ARE NOT |
| | SUFFICIENT TO MINIMIZE EROSION, RETAIN SEDIMENT, AND |
| | PREVENT DISCHARGING POLLUTANTS, THE CONTRACTOR SHALL |
| | PROVIDE ADDITIONAL MEASURES, AS APPROVED BY THE |
| | ENGINEER. |
| | |
| | WASTE DISPOSAL |
| | 1. THE CONTRACTOR SHALL DEMONSTRATE THE PROPER DISPOSAL |
| | OF ALL CONSTRUCTION WASTE GENERATED WITHIN THE PROJECT |
| | LIMITS. WASTE MAY INCLUDE, BUT NOT BE LIMITED TO, |
| | VEGETATION FROM CLEARING AND GRUBBING ACTIVITIES, |
| | PACKAGING MATERIALS, SCRAP BUILDING MATERIALS, LITTER |
| | FROM TRAVELING PUBLIC, SEWAGE FROM SANITARY FACILITIES, |
| | HERBICIDES AND PESTICIDES AND THEIR CONTAINERS, AND |
| | HYDROCARBON PRODUCTS. CONTRACTOR SHALL DESIGNATE A |
| | WASTE COLLECTION AREA ONSITE AND DELINEATE THE AREA ON |
| | THE SWPPP SITE MAP. |
| | 2. SANITARY/SEPTIC FACILITIES SHALL BE PROVIDED AND |
| | MAINTAINED IN A NEAT AND SANITARY CONDITION, FOR THE |
| | USE OF THE CONTRACTOR'S EMPLOYEES AS NECESSARY TO |
| | COMPLY WITH THE REQUIREMENTS AND REGULATIONS OF THE |
| | STATE AND LOCAL BOARDS OF HEALTH. A LICENSED SANITARY |
| | WASTE MANAGEMENT CONTRACTOR AS REQUIRED BY STATE |
| | REGULATIONS WILL COLLECT ALL SANITARY WASTE FROM |
| | PORTABLE UNITS. |
| | 3. THE CONTRACTOR WILL PROVIDE LITTER CONTROL AND |
| | COLLECTION WITHIN THE PROJECT LIMITS DURING |
| | CONSTRUCTION ACTIVITIES. CONTRACTOR WILL PROVIDE AN |
| | ADEQUATE NUMBER OF LITTER CONTAINERS WITH LIDS AT THE |
| | STAGING, STOCKPILE AND FIELD OFFICE AREAS. WASTE |
| | COLLECTION WILL BE SCHEDULED SO THAT CONTAINERS ARE |
| | EMPTIED PRIOR TO OVERFLOW. SPILLED LITTER CONTAINERS |
| | WILL BE CLEANED UP IMMEDIATELY. |
| | |
| | NON-STORMWATER DISCHARGES |
| | 1. PLEASE CONSIDER CONSTRUCTION ACTIVITIES THAT MIGHT |
| | GENERATE NON-STORMWATER DISCHARGES. INCLUDE A STATEMENT |
| | THAT REQUIRES THE CONTRACTOR TO PROVIDE AN EROSION |
| | CONTROL PLAN TO ADDRESS THE ACTIVITY. |
| | 2. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DEVELOP A |
| | DEWATERING SYSTEM THAT PROVIDES PRETREATMENT OF |
| | EFFLUENT PRIOR TO DISCHARGE INTO ADJACENT SURFACE |
| | WATERS. THE CONTRACTOR'S DEWATERING METHOD MUST MEET |
| | ALL LAWS (FEDERAL, STATE, AND LOCAL) RULES AND |
| | REGULATIONS CONCERNING THIS PRACTICE, INCLUDING THE USE |
| | OF PERMITTED OUTFALL STRUCTURES. IT IS THE CONTRACTOR'S |
| | RESPONSIBILITY TO COORDINATE AND APPLY FOR A DEWATERING |
| | PERMIT WITH THE APPROPRIATE WATER MANAGEMENT DISTRICT. |
| | 3. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DESIGNATE |
| | AN AREA WITHIN THE PROJECT LIMITS FOR CONCRETE TRUCK |
| | WASHOUT ACTIVITIES. THIS AREA SHALL PROVIDE EROSION |
| | CONTROL DEVICES THAT PREVENT CONTACT BETWEEN CONCRETE |
| | WASHOUT MATERIALS AND STORMWATER AND/OR SURFACE WATERS. |
| | 4. IF CONTAMINATED SOIL OR GROUNDWATER IS ENCOUNTERED |
| | DURING CONSTRUCTION, THE CONTRACTOR IS TO CEASE |
| | OPERATIONS IN THAT AREA AND CONTACT PROPER AUTHORITIES. |
| | |
| | CONTRACTOR SUBMITTAL |
| | PLEASE HAVE CONTRACTOR PROVIDE THE FOLLOWING 30 DAYS |
| | PRIOR TO PROJECT COMMENCEMENT FOR REVIEW. |
| | IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO DEVELOP |
| | AN EROSION CONTROL PLAN THAT PROVIDES A DETAILED |
| | DESCRIPTION OF ALL EROSION AND SEDIMENT CONTROLS, BMPS, |
| | AND MEASURES THAT WILL BE IMPLEMENTED AT THE |
| | CONSTRUCTION SITE FOR EACH ACTIVITY. CONTRACTOR IS |
| | RESPONSIBLE FOR PROVIDING TIMEFRAMES IN WHICH THE |
| | CONTROLS WILL BE IMPLEMENTED, MAINTAINED AND REMOVED. |
| | THIS INFORMATION SHALL BE KEPT AT THE PROJECT FIELD |
| | OFFICE IN ORDER FOR THE PROJECT TO BE CONSIDERED IN |
| | COMPLIANCE WITH THE FDEP GENERIC PERMIT FOR STORMWATER |
| | DISCHARGE FROM LARGE AND SMALL CONSTRUCTION SITES. |
| | |
| | THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THE |
| | FOLLOWING ITEMS ARE ON SITE: |
| | 1. COPY OF THE SWPPP WITH THE ORIGINAL CERTIFICATION |
| | SIGNATURES. |
| | 2. COPY OF THE CONTRACTOR'S EROSION CONTROL PLAN. |
| | 3. HAZARDOUS SPILL CONTROL PLAN WITH GUIDELINES ON |
| | CONTACTING THE 24-HOUR EMERGENCY RESPONSE PROGRAM FOR |
| | HAZARDOUS MATERIAL SPILLS. THIS SHALL INCLUDE COPIES OF |
| | DISCHARGE NOTIFICATIONS THAT HAVE OCCURRED WITHIN THE |
| | PROJECT LIMITS. |
| | 4. COMPLETED INSPECTION FORMS. |
| | |
| | PLEASE FEEL FREE TO CONTACT ME SHOULD YOU HAVE ANY |
| | QUESTIONS. |
| | THANK YOU! |
| | |
| | MANUEL JULIAN GONZALEZ |
| | ENGINEERING PROJECT COORDINATOR |
| | ENGINEERING SERVICES DEPARTMENT |
| | 401 CLEMATIS STREET, 4TH FLOOR |
| | WEST PALM BEACH, FL 33401 |
| | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) |
| | MAIN PHONE: (561) 822-1200 |
| | DIRECT: (561) 494-1085 |
| | FAX: (561) 494-1116 |
| | MOBILE: (561) 644-7301 |
| | EMAIL: [email protected] |
| | WWW.WPB.ORG/ENGINEERING |
| | |
| | |
| | |
| | |