Plan Review Details - Project E09110010
Plan Review Stops For Project E09110010
Review Stop ENG-A ENGINEERING FORMAL REVIEW
Rev No 2 Status P Date 12-09-2009 Cont ID  
Sent By mgonzale Date 02-03-2010 Time 11:37 Rev Time 36.00
Received By mgonzale Date 12-15-2009 Time   Sent To  
Notes
***NONE***

Review Stop ENG-A ENGINEERING FORMAL REVIEW
Rev No 1 Status F Date 11-13-2009 Cont ID  
Sent By mgonzale Date 11-13-2009 Time 06:36 Rev Time 36.00
Received By mgonzale Date 11-13-2009 Time 06:35 Sent To  
Notes
2009-11-13 06:36:19 
 NOV 12, 2009 KELLY FREEMAN REVIEWED - NO COMMENTS
  
 NOV. 13, 2009 ESD MANNY GONZALEZ, STILL REVIEWING
  
 NOV. 23, 2009 MJG / JEFF RENAULT
 MJG
 1) RIGHT TURN LANE SIGN AND TRAFFIC PATTERN TO BE
 APPLIED WITH PBC TRAFFIC AS BELVEDERE IS PBC ROADWAY
 2) IMPROVEMENTS IN ROW AND OFF-SITE DESIGN PLAN NEEDED
 FOR REVIEW.
 3) PROVIDE CONDUITS FOR IRRIGATION IN THE ROW FROM SITE
 TO PLANTERS 3" MIN. SDR-26
 4) HC RAMP COMING FROM SIDEWALK WILL REQUIRE A LANDING
 AREA.
 5) DRIVEWAY MUST BE PER FDOT INDEX 515 PAGE 2 OF 6 TO
 ACHIEVE THE 2% CROSS-SLOPE UNTO BELVEDERE.
 6) DUMPSTER MUST BE 12'-6" MIN. DEPTH.
 7) SITE NEXT TO TACO BELL REVIEW IS SUBJECT TO THE TACO
 BELL LEASE PROPERTY. IMPROVEMENT TO ADJACENT PROPERTIES
 REQUIRE SEPARATE PERMITS.
 8) ENG COST ESTIMATE IS ACCURATE HOWEVER IF DRAINAGE
 ELEMENTS CHANGE THEN IT MUST BE REVISED. SUBMIT CHECK
 FOR 5.5% OF THE IMPROVEMENTS ON THIS DOCUMENT.
  
 JR
 1) SHT C-2 , CB - 4 , PLAN SHOWS GRATE ELEV OF 17.2 AND
 17.5 ?
 2) SHT C-2 , DRAINAGE SCHEDULE , CALL FOR 1 PRB FOR
 CB-1 ;
 2 PRB FOR CB-2 ; 2 PRB FOR CB-3 AND 1 PRB FOR CB-4
 3) SHT C-2 , DRAINAGE SCHEDULE , WHY ARE EXFILTRATION
 PIPE
 INVERTS SO LOW (11.5) ? WILL 12.5 WORK ?
 4) SHT C-6 , EXFILTRATION TRENCH DETAIL - WHY IS EXFIL
 TRENCH SO DEEP ? CONSIDER A TRENCH THAT IS 4' DEEP X 5'
 WIDE WITH
 PERFORATED PIPE INVERT =
 12.5 , 12" OF WASHED ROCK ABOVE THE PIPE AND THE REST
 OF THE ROCK BELOW.
 - INSTALL FABRIC ON ALL SIDES OF TRENCH WITH 2' OVERLAP
 ON TOP.
 - FOR EACH CB ADD A 12" DIA WEEP HOLE . UNDER WEEP HOLE
 INSTALL HARDWARE
 CLOTH (SS) ON 2'X2'X6" OF
 WASHED ROCK WRAPED ALL AROUND WITH FABRIC
 5) IT IS NOT NECESSARY TO RETAIN THE 100 YR - 3 DAY
 STORM
 RUNOFF ON SITE. WHAT THE CITY IS LOOKING FOR ARE CALCS
 FOR WATER QUALITY (
 GREATER OF 1" OVER
 ENTIRE SITE OR 2.5 X % IMPERVIOUS) AND CALCS SHOWING
 THAT THE POST DEVELOPMENT RUNOFF DOES NOT EXCEED THE
 PRE DEVELOPMENT
 RUNOFF.
  
 SHOULD YOU HAVE ANY QUESTIONS , PLEASE CONTACT ME.
  
  
  

Review Stop ENG-D ENGINEERING DEFICIENCY REVIEW
Rev No 1 Status F Date 11-23-2009 Cont ID  
Sent By   Date 11-23-2009 Time   Rev Time 2.00
Received By mgonzale Date 11-23-2009 Time 15:31 Sent To  
Notes
***NONE***

Review Stop ENG-F ENGINEERING FINAL DRAWING REV
Rev No 1 Status P Date 05-26-2010 Cont ID  
Sent By mgonzale Date 05-26-2010 Time   Rev Time 4.00
Received By mgonzale Date 05-26-2010 Time   Sent To  
Notes
***NONE***

Review Stop ENG-M ENGINEERING MODIFICATION REV
Rev No 1 Status P Date 06-01-2010 Cont ID  
Sent By mgonzale Date 06-01-2010 Time 14:00 Rev Time 48.00
Received By mgonzale Date 06-01-2010 Time 13:59 Sent To  
Notes
2010-06-01 13:59:54PRECONSTRUCTION AND FIELDS CONDITIONS WHERE RESOLVED
 THROUGH SITE VISITS AND COORDINATION WITH OTHER
 DEPARTMENTS.

Review Stop ENG-P ENGINEERING PLANNING REVIEW
Rev No 2 Status P Date 11-12-2009 Cont ID  
Sent By mgonzale Date 11-12-2009 Time   Rev Time 4.00
Received By mgonzale Date 11-12-2009 Time   Sent To  
Notes
2010-06-01 13:58:22KELLY FREEMAN REVIEW THE PLAN FOR PLANING COMMENTS AND
 HE APPROVED.

  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved